Line 7 (Hangzhou Metro)

Line 7 of the Hangzhou Metro (simplified Chinese: 杭州地铁七号线; traditional Chinese: 杭州地鐵七號線; pinyin: Hángzhōu Dìtiě Qīhào Xiàn) is a subway line under construction.[3][4] The line will be 47.48 km long and will run in a west–east direction between Wushan Square Station in Shangcheng District and Jiangdong'er Road Station in Dajiangdong Industrial Cluster in the east,[5] passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line is expected to be operational by late 2021.[6]

Line 7
 7 
Overview
TypeRapid transit
SystemHangzhou Metro
StatusUnder construction
LocaleHangzhou, China
TerminiWushan Square
Jiangdong'er Road[1]
Stations22
Services1
Operation
Planned opening2021[2]
OwnerCity of Hangzhou
Operator(s)Hangzhou Metro Corporation
CharacterUnderground
Technical
Line length47.48
ElectrificationThird rail, 1,500 V DC
Line 7 drawn to scale.

Stations

Station name Connections
English Chinese
Wushan Square 吴山广场
Jiangcheng Road 江城路  5 
Chengzhan 城站  1   5  HZH
Sijiqing 四季青  9 
Citizen Center 市民中心  4 
Aoti 奥体  6 
Jianshesi Road 建设四路
Mingxing Road 明星路
Jianshesan Road 建设三路  2 
Gengwen Road 耕文路  11 
Nongdu 农都
Shengdong 盛东
Hehuan Road 合欢路
Yingzhong 盈中
Kanshan 坎山
Airport West 机场西
Xiaoshan Airport 萧山机场  1   Airport  HGH
Jingjiang 靖江  Airport 
Yipeng 义蓬  13 
Tangxinxian 塘新线
Hejing Road 河景路  8 
Bei'er Road 北二路
Jiangdong'er Road 江东二路

See also

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.