Line 2 (Hangzhou Metro)

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[4][5]

Line 2
 2 
People Square Station
Overview
TypeRapid transit
SystemHangzhou Metro
StatusOperating
LocaleHangzhou, Zhejiang
TerminiChaoyang
Liangzhu
Stations33
Daily ridership81,900 (2015 peak)[1]
Operation
Opened24 November 2014 (2014-11-24)[2]
OwnerHangzhou
Operator(s)Hangzhou Metro Corporation
CharacterUnderground
Rolling stock6 cars, type B
Technical
Line length43.3 km (26.91 mi)[3]
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead 1500V DC
Operating speed80km/h (50mph)

The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[5]

Opening timeline

SegmentCommencementLengthStation(s)Name
Chaoyang — Qianjiang Road 24 November 2014 18.3 km (11.37 mi) 12 Phase 1 (southeastern section)
Qianjiang Century City 28 April 2016 Infill station 1
Qianjiang Road — Gucui Road 3 July 2017 11.3 km (7.02 mi) 9 Phase 1 (northwestern section)
Gucui Road — Liangzhu 27 December 2017 13.32 km (8.28 mi) 10 Phase 2 & 3
Xianing Bridge 30 June 2020[6] Infill station 1

Stations

Station name Connections Distance
km[7]
Location
English Chinese
Chaoyang 朝阳 0.00 0.00 Xiaoshan
Caojiaqiao 曹家桥 1.34 1.34
Panshui 潘水 1.56 2.90
Renmin Road 人民路 1.18 4.08
Hangfachang 杭发厂 1.31 5.39
People Square 人民广场  5  1.16 6.55
Jiansheyi Road 建设一路 1.47 8.02
Jianshesan Road 建设三路  7  1.15 9.17
Zhenning Road 振宁路 1.62 10.79
Feihong Road 飞虹路 1.58 12.37
Yingfeng Road 盈丰路 1.23 13.60
Qianjiang Century City 钱江世纪城  6  0.94 14.54
Qianjiang Road 钱江路  4   9  3.46 18.00 Jianggan
Qingchun Square 庆春广场 0.93 18.93
Qingling Road 庆菱路 1.23 20.16
North Jianguo Road 建国北路  5  1.47 21.63 Xiacheng
North Zhonghe Road 中河北路 0.93 22.56
Fengqi Road 凤起路  1  0.74 23.30
Wulinmen 武林门  3  1.29 24.59 Xiacheng/Xihu
Shentangqiao 沈塘桥  Airport  1.28 25.87 Gongshu/Xihu
Xianing Bridge 下宁桥 1.15 27.02 Xihu
Xueyuan Road 学院路  10  0.92 27.94
Gucui Road 古翠路 1.11 29.05
Fengtan Road 丰潭路 1.45 30.50
Wenxin 文新 1.29 31.79
Sanba 三坝  5  1.16 32.95
Xialongwei 虾龙圩 1.19 34.14
Sandun 三墩 1.24 35.38
Dunxiang Street 墩祥街 1.27 36.65 Gongshu
Jinjiadu 金家渡  4  0.93 37.58 Yuhang
Baiyang 白洋 1.79 39.37
Dufucun 杜甫村 1.87 41.24
Liangzhu 良渚 1.38 42.62
To scale map of Line 2 (Hangzhou Metro)

Notes

    References

    1. Cui Diyi (霍翟羿). 113.09万人次! 杭州地铁"五一"客流破百万. Zhejiang News. Retrieved Jan 5, 2016.
    2. 杭州地铁2号线24日试运营 列车全天运行15小时. 杭州地铁网. 2014-11-12.
    3. "今天17时,地铁2号线全程开通 从头坐到尾只需77分钟". 2017-12-27.
    4. 杭州地铁2号线铺新轨. December 22, 2012.
    5. 杭州地铁2号线一期工程. December 11, 2012. Archived from the original on December 15, 2013.
    6. "明天上午10点,下宁桥站、火车南站站同步开通!". 2020-06-29.
    7. 中铁第四勘察设计院集团有限公司. 杭州地铁二号线二期工程环境影响报告书简本 (Report).
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.