Line 9 (Chongqing Rail Transit)
Line 9 of CRT is a rapid transit line in Chongqing, China, which is expected to be opened in 2020.[1]
Line 9 | |
---|---|
9 | |
Overview | |
Native name | 重庆轨道交通9号线 |
Type | Rapid transit |
System | Chongqing Rail Transit |
Status | Under construction |
Locale | Chongqing, China |
Termini | Xinqiao Huashigou |
Stations | 30 |
Line number | 9 |
Operation | |
Planned opening | 2020 |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
Technical | |
Line length | 40.46 km (25.14 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | 1500 V DC Overhead line |
Planned Stations
Phase I
Station № |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
9/01 | Xinqiao | 新桥 | Shapingba | ||||||
9/02 | Gaotanyan | 高滩岩 | |||||||
9/03 | Tianlilu | 天梨路 | |||||||
9/04 | Shapingba | 沙坪坝 | 1 Loop | ||||||
9/05 | Xiaolongkan | 小龙坎 | 1 | ||||||
9/06 | Tuwan | 土湾 | |||||||
9/07 | Hongyancun | 红岩村 | 5 | Yuzhong | |||||
9/08 | Fuhualu | 富华路 | 18 | ||||||
9/09 | Huacun | 华村 | |||||||
9/10 | Lijiaping | 李家坪 | Jiangbei | ||||||
9/11 | Mahuangliang | 蚂蝗梁 | |||||||
9/12 | Guanyinqiao | 观音桥 | 3 | ||||||
9/13 | Liyuchi | 鲤鱼池 | 10 | ||||||
9/14 | Liujiatai | 刘家台 | |||||||
9/15 | Jiangbeicheng | 江北城 | 6 | ||||||
9/16 | Wulidian | 五里店 | 6 Loop | ||||||
9/17 | Gailanxi | 溉澜溪 | |||||||
9/18 | Toutang | 头塘 | 4 | ||||||
9/19 | Baoshuigang | 保税港 | 4 | ||||||
9/20 | Hejialiang | 何家梁 | |||||||
9/21 | Shipanhe | 石盘河 | Yubei | ||||||
9/22 | Shangwanlu | 上湾路 | 10 | ||||||
9/23 | Qinggangping | 青岗坪 | |||||||
9/24 | Baoshenghu | 宝圣湖 | |||||||
9/25 | Xingke Ave. | 兴科大道 | |||||||
Phase II
Station № |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
9/26 | Chunhua Ave. | 春华大道 | Yubei | ||||||
9/27 | Langui Ave. | 兰桂大道 | |||||||
9/28 | Central Park East | 中央公园东 | 10 | ||||||
9/29 | Congyansi | 从岩寺 | |||||||
9/30 | Huashigou | 花石沟 | |||||||
gollark: Great!
gollark: Anyway, is this a satisfying and complete answer‽
gollark: This is a useful answer.
gollark: I was answering your question.
gollark: Try brain expansion surgery.
References
- "9号线一期(高滩岩~兴科大道)工程概况". February 27, 2017.
- "9号线二期(回兴至花石沟站)工程概况". February 7, 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.