Interstate 69C

Interstate 69C (I-69C) is a north-south freeway running through South Texas. Once complete, the freeway (with connections to Mexican Federal Highway 97) will begin at Interstate 2/U.S. Highway 83 in Pharr and head northward before terminating at I-69W/US 59 in George West near I-37. For its entire length, I-69C shares its alignment with US 281.

Interstate 69C
Route information
Auxiliary route of I-69
Maintained by TxDOT
Length18 mi[1] (29 km)
ExistedMay 30, 2013 (2013-05-30)–present
Major junctions
South end I-2 / US 83 / US 281 in Pharr
North end
US 281 / Bus. US 281 near Edinburg
Location
CountiesHidalgo
Highway system

History

Hidalgo County Courthouse in Edinburg, TX near the temporary northern terminus of I-69C
Live Oak County Courthouse in George West, TX near the future northern terminus of I-69C

The Federal Highway Administration approved the designation for the South Rio Grande Valley Segment on May 24, 2013,[2] and the Texas Transportation Commission followed suit on May 30, 2013.[3] This action finalized the designations of not only I-69C, but also of the sections of Interstate 69E (I-69E) from Brownsville north to north of Raymondville, and also Interstate 2 (I-2) which is a 46.8-mile (75.3 km) freeway connecting with I-69C and I-69E in Pharr and Harlingen.[2] These approvals added over 100 miles (160 km) to the Interstate Highway System in the Rio Grande Valley.[4] The signage was installed in summer 2013.[5]

As of April 2020, the cluster consisting of the recently designated portions of I-69C, I-69E, and I-2 in the Rio Grande Valley is not connected to the national Interstate network. This situation is slated to be remedied by scheduled projects to complete I-69E along US 77 between Raymondville and Robstown, and to complete the southern end of the previously signed portion of the I-69 corridor connecting with I-37 west of Corpus Christi. Environmental Protection Agency approval for the upgrade of the US 77 alignment to Interstate standards, including bypasses of the towns along the 91-mile (146 km) routing, was obtained through a Finding of No Significant Impact statement issued on July 13, 2012;[6] funding for the various upgrade projects is slated to become available after 2015.[7] During August 2014, exit numbering began on the south most segment in Edinburg.

Exit list

The entire route is in Hidalgo County.

LocationmikmExit[8]DestinationsNotes
Pharr0.000.001A-B I-2 / US 83 McAllen, HarlingenSigned as exits 1A (west) and 1B (east); exits 146A-B on I-2
0.350.561C US 281 south / SH 495 PharrSouth end of US 281 overlap; southbound exit and northbound entrance
0.851.371DSioux RoadSouthbound exit and northbound entrance
1.852.981E FM 3461 (Nolana Loop)
PharrEdinburg line2.994.812
Bus. US 281 north / Owassa Road Edinburg
To Doctors Hospital at Renaissance
Edinburg4.006.443 Trenton RoadTo Cornerstone Regional Hospital, Edinburg Regional Medical Center
5.158.294Canton Road / Veterans Boulevard
5.939.545Freddy Gonzalez Drive / Sprague Street
6.9511.186 SH 107 (University Drive)
7.4411.977 FM 2128 / Schunior Road / Richardson Road / Chapin Road
8.9814.458Russell Road / Rogers Road
9.4815.269 FM 1925 (Monte Cristo Road)
10.0916.2410
Bus. US 281 south Edinburg
Southbound exit and northbound entrance
11.04–
11.61
17.77–
18.68
11Davis Drive / Ramseyer Road
12.9820.8912 FM 2812
Faysville
15.1624.40 FM 162 (El Cibolo Road)
17.5628.26 FM 490 / US 281 northTo South Texas International Airport at Edinburg; continues north as US 281
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
gollark: Did NOBODY think it would be useful to have a convenient way to do this?
gollark: As I CLEARLY SAID, "execvp seems to take over the process or something, fork then that causes ææææ concurrency.".
gollark: Yes, sure, but how do I then wait for that other program to finish?
gollark: I mean how do I call a separate program and wait for it to do things.
gollark: Of course not. I *can* use it slightly and don't *entirely* hate it, I just dislike it most of the time.

See also

  •  Texas portal
  •  U.S. Roads portal

References

  1. Transportation Planning and Programming Division (n.d.). "Interstate Highway No. 69-C". Highway Designation Files. Texas Department of Transportation. Retrieved September 3, 2013.
  2. Staff (May 30, 2013). "Interstate 69 Comes to Texarkana and the Valley" (Press release). Alliance for I-69 Texas. Retrieved July 17, 2013.
  3. Nino, Mark (May 31, 2013). "Texas Transportation Commission Approves Interstate 69 System". Brownsville, TX: KVEO-TV. Retrieved July 17, 2013.
  4. Taylor, Steve (May 30, 2013). "Over 100 Miles of Valley Highways To Be Designated Interstate". Rio Grande Guardian. McAllen, TX. Archived from the original on October 18, 2013. Retrieved July 17, 2013.
  5. Janes, Jared (July 15, 2013). "Valley's I-69 signage the latest stop along superhighway dream". The Monitor. Retrieved July 17, 2013.
  6. Staff (July 13, 2012). "Agency Gives US 77 Upgrades Final Environmental Clearance" (Press release). Alliance for I-69 Texas. Retrieved July 17, 2013.
  7. Clark, Steve (August 8, 2011). "Interstate Link to Valley Moves Closer to Reality, Official Says". Brownsville Herald. Retrieved July 17, 2013.
  8. Texas Department of Transportation, plans of proposed highway maintenance contract (1.58 GB ZIP file), December 2014

KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.