HMS Spey (P234)
HMS Spey is a Batch 2 River-class offshore patrol vessel currently in the late phases of construction as of August 2020 for the Royal Navy. Named after the River Spey in Scotland, this is the eighth Royal Navy ship to be named Spey. She will be the fifth Batch 2 River-class vessel to commission, and probably the last.
HMS Spey at the Scotstoun dock, on its naming day. (UK MoD, 2019) | |
History | |
---|---|
Name: | HMS Spey |
Operator: | Royal Navy |
Ordered: | 8 December 2016 |
Builder: | BAE Systems Naval Ships |
Laid down: | 21 April 2017 (1st steel cut) |
Launched: | 19 June 2019 |
Sponsored by: | Lady Alison Johnstone |
Christened: | 3 October 2019 |
Homeport: | HMNB Portsmouth |
Identification: | Pennant number: P234 |
Status: | Fitting Out |
General characteristics | |
Class and type: | Batch 2 River-class patrol vessel |
Displacement: | 2,000 tonnes |
Length: | 90.5 m (296 ft 11 in)[1] |
Beam: | 13 m (42 ft 8 in) |
Draught: | 3.8 m (12 ft 6 in) |
Speed: | 24 kn (44 km/h) |
Range: | 5,500 nmi (10,200 km) |
Endurance: | 35 days |
Boats & landing craft carried: | Two rigid hull inflatable boats (RHIBs) |
Capacity: | 70 |
Complement: | 34 |
Armament: |
|
Aircraft carried: | Merlin capable flight deck |
Construction
On 6 November 2013 it was announced that the Royal Navy had signed an Agreement in Principle to build three new offshore patrol vessels, based on the River-class design, at a fixed price of £348 million including spares and support. In August 2014, BAE Systems signed the contract to build the ships on the Clyde in Scotland. The Ministry of Defence stated that the Batch 2 ships are capable of being used for constabulary duties such as "counter-terrorism, counter-piracy and anti-smuggling operations". According to BAE Systems, the vessels are designed to deploy globally, conducting anti-piracy, counter-terrorism and anti-smuggling tasks currently conducted by frigates and destroyers. A £287m order, for two further ships, Tamar and Spey, and support for all five Batch 2 ships, was announced on 8 December 2016.[2]
Batch 2 ships such as Spey include some 29 modifications and enhancements over the Amazonas-class corvette built by BAE Systems, and bought by the Brazilian Navy.[3] Tamar and Spey have further modifications such as carbon dioxide reducing catalytic converters.
Spey was officially named on 3 October 2019.
References
- "Work begins on third Royal Navy Patrol Vessel" (Press release). GOV.UK. 7 October 2015. Retrieved 26 April 2017.
- de Larrinaga, Nicholas (9 December 2016). "UK orders two more River-class OPVs". IHS Jane's Defence Weekly. Retrieved 8 October 2019.
- "Patrol Craft:Written question - 210211 - UK Parliament". United Kingdom Parliament. Retrieved 6 April 2017.