Fatuha–Tilaiya line

The Fatuha–Tilaiya line is a railway line connecting Fatuha on the Howrah-Delhi main line and Tilaiya on the Gaya-Kiul line both in the Indian state of Bihar. The line was earlier known as Fatuha-Islampur line. A small portion of the line from Islampur to Natesar is still to be opened for use.

Fatuha–Tilaiya line
Overview
StatusOperational
TerminiFatuha
Tilaiya
Operation
Opened2003
OwnerIndian Railway
Operator(s)East Central Railway
Technical
Track gaugeBroad Gauge 1,676 mm (5 ft 6 in)
Fatuha–Tilaiya line
km
0 Fatuha
3 Gokulnagar
4 Machriawan
6 Naika Road
Mahatmain River
8 Daniyawan Bazar
(Halt)
NH 431 State Highway 78
Neora-Sheikhpura line to Neora (under construction)
9 Daniyawan
Neora-Sheikhpura line to Sheikhpura (under construction)
11 Singriyawan
14 Diywan
17 Lohanda
19 Kamta
(Halt)
State Highway 4
21 Hilsa
State Highway 4
26 Junair
State Highway 4
30 Ram Bhawan
State Highway 4
33 Ekangarsarai
35 Aungaridham
37 Khurrampur
43 Islampur
State Highway 71
Khudaganj
Harsingara
Katari
64 Natesar
71 Jethian
75 Sarsoo
Dhadhar River
83 Oro Jagdishpur
87 Mohamadpur
89 Hisua
93 Tilaiya
100 Narhat
108 Laundh
116 Kheraundh
to Koderma (under construction)

History

Futwah-Islampur Light Railway was a 2 ft 6 in (762 mm) wide narrow gauge railway laid by Martin's Light Railways in 1922.[1][2] Nearly 14 km of the 42 km (26 mi) long Fatuha-Islampur railway line was washed away by floods 1976. As a result, no train plied on the route for many years. In 1982, Martin's Light Railways initiated resumption of train service on this line and took up restoration work. However, in 1984, they decided to close down permanently.[3][4]

It was nationalised and taken over by Indian Railways in 1986.[2][3] Nitish Kumar, then the railway minister laid the foundation stone for the new 1,676 mm (5 ft 6 in) railway line in 1998. This section has about 144 bridges and 36 level crossings. Hilsa will be the crossing station of this single line section. It was inaugurated in 2003 by Nitish Kumar.[3][4][5]

The East Central Railway took up the laying of new lines in the 46 km (29 mi) long Rajgir-Hisua-Tilaiya-Nateswar-Islampur sector and as of 2013 the work was in an advanced stage. Construction of the 68 km (42 mi) Tilaiya-sector has also been taken up.[6]

Electrification

Feasibility studies for the electrification of the Manpur-Tilaiya-Kiul sector and Fatwa-Islampur-Bakhtiyarpur-Rajgir sectors were announced in the rail budget for 2010–11.[7]

gollark: I run a Minecraft server on one, even.
gollark: And ARM servers are actually serious and workable now (Altera Ampere).
gollark: Lightmatter has optical matrix-vector multiplier things and apparently superconductor-based logic gates could be very fast.
gollark: You can do fun stuff with light and superconductors, apparently, maybe those will go somewhere.
gollark: And quantum computing is NOT a general solution to things or very practical in consumer devices right now.

References

  1. "IR History: Part III (1900-1947)". IRFCA. Retrieved 26 March 2014.
  2. "Futwa-Islampur Light Railway". fibis. Retrieved 26 March 2014.
  3. "Islampur-Fatuha line inaugurate". Times of India, Patna, 23 January 2003. Retrieved 26 March 2014.
  4. "Fatuha-Islampur new line almost completed". The Times of India, Patna, 16 November 2002. Retrieved 26 March 2014.
  5. "Full text of Railway Budget 2003-04". rediff.com. Retrieved 26 March 2014.
  6. "East Central Railway to expedite work on new lines". Times of India, Patna, 11 April 2013. Retrieved 26 March 2014.
  7. "Railway Budget 2010-11: Electrification of New Rail Sections". Press Information Bureau, Government of India, 24 February 2010. Retrieved 26 March 2014.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.