Everett station (MBTA)

Everett was a rapid transit station in Everett, Massachusetts. It served the MBTA's Orange Line. It opened in 1919 as an extension of the Charlestown Elevated, and served as its northern terminus until the Elevated was closed and demolished in 1975, when it was replaced by the Haymarket North Extension.[2][3]

Everett
Everett station in 1918, shortly before opening
LocationBroadway at Beacham Street,
Everett, Massachusetts
Coordinates42°23′52.39″N 71°3′52.85″W
Owned byMassachusetts Bay Transportation Authority
Line(s)Charlestown Elevated
Platforms2
Tracks2
History
OpenedMarch 15, 1919[1]
ClosedApril 4, 1975[1]
Services
Preceding station MBTA Following station
Sullivan Square Orange Line Terminus

Construction and history

Streetcar platforms next to the inbound platform (not visible, at left) at Everett in 1931

In the 1910s and 1920s, the Boston Elevated Railway (BERy) had plans to extend the Charlestown Elevated to Malden, and the southern portion of this extension, including a drawbridge over the Mystic River, was built in the late 1910s. Everett station was opened in an isolated industrial area just north of the river crossing on March 15, 1919.[1]

Intended to be temporary and to be used only until full service to Malden was implemented, it was constructed of wood like a house rather than a permanent transit station. The light-duty construction style of this station was unique on the Elevated.[2] Due to opposition from Malden residents who preferred a tunnel due to the noise and vibration of the planned elevated line, the Malden extension was not built and Everett remained the terminus.[2] Although Everett thus became a semi-permanent station, it was never rebuilt from its "clapboard house" configuration, and began to look increasingly shabby as the years went by, acquiring a reputation to that effect among riders of the Elevated.

On March 30, 1963, the remaining trackless trolley lines feeding into Everett were replaced with diesel buses. This allowed the somewhat isolated station to be closed on nights and Sundays to improve passenger security and comfort, during which times the buses were simply extended to Sullivan Square.[1]

In the late 1960s and early 1970s, plans to reroute the Orange Line were implemented, culminating in the building of the Haymarket North Extension. The Haymarket North Extension rerouted the Orange Line into a new tunnel under the Charles River and from there followed the Haverhill Line north through Malden, somewhat to the west of the Charlestown Elevated's then-existing and previously-planned route. The Charlestown Elevated was closed on April 4, 1975, and the first section of the Haymarket North Extension was opened three days later.[1] Since then, all transit service to the city of Everett has consisted of buses terminating at Sullivan Square, Wellington, Malden Center, or Wood Island stations.[4]

gollark: Well, you could implement that as an overlay network if you thought it was good?
gollark: Routing is handled according to normal IP. RFC 1149 is merely a transport.
gollark: There are some store and forward protocols which are sort of that.
gollark: RFC 1149, but it isn't widely deployed.
gollark: If we had more data, it could be VERY COOL to track data/memetic hazard flow between Discord servers.

References

  1. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). NETransit.
  2. Cheney, Frank; Sammarco, Anthony Mitchell (2000). When Boston Rode the EL. Arcadia Publishing. ISBN 978-0-7385-0462-9. Retrieved May 26, 2015.
  3. Lampariello, Dan (April 30, 2011). "YAY History: The "El"". Boston to a T. Retrieved May 26, 2015.
  4. "Massachusetts Bay Transportation Authority System Map 5" (PDF). Massachusetts Bay Transportation Authority. 2014. Retrieved May 28, 2015.

Media related to Everett station (MBTA) at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.