Eastleigh–Romsey line

The Eastleigh–Romsey line is the railway line from Eastleigh to Romsey in Hampshire, England. At Eastleigh, trains join the South Western Main Line for onward travel to Southampton. At Romsey most trains terminate. The line is not electrified and all trains are diesel-powered.

Eastleigh–Romsey line
A Class 158 approaching the junction at Eastleigh
Overview
TypeSuburban rail, Heavy rail
SystemNational Rail
StatusOperational
LocaleHampshire
South East England
Operation
Opened1847
OwnerNetwork Rail
Operator(s)South Western Railway (train operating company)
Rolling stockClass 158
Technical
Track gauge4 ft 8 12 in (1,435 mm) standard gauge
Eastleigh–Romsey
line
Romsey
80½
Chandler's Ford
75½
Eastleigh
73½

History

The line, part of the London and South Western Railway,[1] was part of the Bishopstoke (now Eastleigh) to Salisbury line which was authorized on 4 July 1844.[2] Construction of the line was problematic, as landowners, somewhat unusually, took an obstructive attitude to the railway.[2] The problems were exacerbated by the choice of a small contractor over the more well established and more experienced options in order to save money.[2] In addition, the weather conditions during construction caused earthworks to slip and then freeze.[2] As a result of all these factors, the opening of the line was postponed three times before coal and goods traffic used the line for the first time on 27 January 1847.[2] The line was opened to passenger traffic on 1 March 1847 and was the main route from Salisbury to London from that time until the opening of the direct Salisbury line over a decade later, on 1 May 1857.[2]

Chandler's Ford station was closed to goods traffic on 1 June 1964, and five years later on 5 May 1969, the station was also closed to passengers when regular passenger services were withdrawn.[2] Originally built as a double track, the line was singled on 1 May 1972.[2] The line continued to be used by stone trains from the Mendip area to and from Botley as well as other freight services, as well as weekend diversions of passenger traffic.[2]

A £10 million plan was put forward in 1999 to reopen Southampton Terminus and Northam, which was to have been controlled by East Anglia Railways Train Company, their plans included building a new rail-link using the current remaining track by St. Marys Stadium and as far as the Waterfront, which is now safe guarded by Southampton City Council for future rail links. This would have allowed trains to go from Southampton Waterfront to East Anglia without the need to change at London. It was also hoped it would reduce the traffic around Southampton with a local commuter line linking the Waterfront to Romsey, Halterworth and Chandler's Ford, the plan failed to come about for reasons unknown.[3]

The line between Eastleigh and Romsey was reopened for passenger traffic in May 2003 with a re-built station at Chandler's Ford.[4]

Services

Services and stations on this line are operated by South Western Railway. It has an hourly service in each direction which runs a 'figure of six' route from Romsey to Salisbury, running from Romsey via Eastleigh and Southampton before re-visiting Romsey and continuing to Salisbury. The service is currently operated by Class 158 DMUs.[5]

Route

For much of the route, the line runs close to the Monks Brook; north-east of Chandler's Ford, it crosses the edge of the Trodds Copse Site of Special Scientific Interest.

gollark: So, progress on the potatoupdates™ system, I now have a script generating manifest files which are deterministically generated from the exact contents of a PotatOS version™.
gollark: > multiprocessing.pool objects have internal resources that need to be properly managed (like any other resource) by using the pool as a context manager or by calling close() and terminate() manually. Failure to do this can lead to the process hanging on finalization.> Note that is not correct to rely on the garbage colletor to destroy the pool as CPython does not assure that the finalizer of the pool will be called (see object.__del__() for more information).Great abstraction there, Python. Really great.
gollark: No, I mean I was reading from underneath the line it highlighted, which was the POST documentation.
gollark: Oh, never mind, the link was just being confusing.
gollark: Why is there a body argument for *GET* requests?

References

  1. "Hampshire Railways". University of Portsmouth. Retrieved 2008-08-26.
  2. Maggs, Colin G (1997). Branch Lines of Hampshire. Stroud, Gloucestershire: Sutton. ISBN 0-7509-1297-9.
  3. "Revitalising the old rail-way link". Retrieved 18 July 2011.
  4. "Transport". Archived from the original on 2012-01-29. Retrieved 2011-11-28.
  5. "Welsh Highland Railway History: Class 158 Two-Coach". Stagecoach South Western Trains Limited. Archived from the original on 29 September 2006. Retrieved 26 August 2008.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.