Maju Expressway
The Maju Expressway (MEX) (formerly known as Kuala Lumpur–Putrajaya Expressway (KLPE) and KL–KLIA Dedicated Expressway)
Maju Expressway (Kuala Lumpur–Putrajaya Expressway) (KL–KLIA Dedicated Expressway) | |
Route information | |
Maintained by Maju Expressway Sdn Bhd | |
Length | 26.0 km (16.2 mi) |
Existed | 2004–present |
History | Completed in 2007 |
Major junctions | |
North end | Kuala Lumpur Kampung Pandan Interchange |
Kuala Lumpur Middle Ring Road 1 | |
South end | Cyberjaya Putrajaya Interchange |
Location | |
Primary destinations | Kuala Lumpur Salak South Sri Petaling Bukit Jalil Putrajaya Cyberjaya |
Highway system | |
The Kilometre Zero is located at Kampung Pandan Interchange, Kuala Lumpur, just outside the Tun Razak Exchange.
History
Construction of Maju Expressway started on 6 December 2004 and completed on 5 December 2007. It was open to motorists on 13 December 2007. This expressway provided fast and convenient connectivity between Kuala Lumpur, the capital of Malaysia and Putrajaya – the new Malaysian Government Administrative Centre, Cyberjaya – the core of the Multimedia Super Corridor (MSC) and KLIA.[1]
MEX is operated by Maju Expressway Sdn Bhd (MESB), the concessionaire that has been awarded a 33-year concession to operate the dual carriageway.[1]
Extending 26 km in its first phase, MEX is designated as the Protocol Expressway that links Putrajaya, Cyberjaya, KLIA and LCCT with Kuala Lumpur. MEX reduce traveling time between Putrajaya to Kuala Lumpur from about 60 minutes to 30 minutes, or half the previous travelling time with five interchanges: Kampung Pandan, Salak South, Kuchai Lama, Bukit Jalil and Putrajaya Utama (Putrajaya Main).[1]
Seri Kembangan interchange (Exit 2004) began operations at 13 January 2016, providing access from MEX to Seri Kembangan (formerly Serdang), Puchong and Universiti Putra Malaysia (UPM).[2]
Maju Expressway will extend to Sepang by Dec 2019 and the route will be 18 km-long, three-lane dual carriageway and commence at Putrajaya Main Interchange.[3]
Features
- The expressway provides Traffic Control and Surveillance System (TCSS) that comprises vehicle detectors and closed circuit television (CCTV) cameras.[4]
- Emergency telephones and Variable Message Signs (VMS)[4]
- MEX Ronda patrol ready to aid drivers who require assistance on the expressway.[4]
- Entire Expressway is fully lit at night which contributes to driving comfort and safety.[4]
- 90 km/h speed limit[5]
- Many flyovers along the expressways including Tun Razak, Salak South and Sri Petaling–Bukit Jalil.
- Long straight sections between Bukit Jalil and Seri Kembangan.
- Views of Kuala Lumpur skyline from Salak South.
Tolls
The Maju Expressway uses opened toll systems.
Electronic Toll Collections
As part of an initiative to facilitate faster transaction at the Salak South, Seri Kembangan and Putrajaya Toll Plaza, all toll transactions at three toll plazas on the Maju Expressway have been conducted electronically via Touch 'n Go cards or SmartTAGs since 13 January 2016.[6]
Toll rates
Salak South Toll Plaza [7]
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM2.00 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM4.00 |
3 | Vehicles with 3 or more axles | RM6.00 |
4 | Taxis | RM1.00 |
5 | Buses | RM1.50 |
Seri Kembangan toll plaza[7]
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | FREE |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM2.20 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM4.40 |
3 | Vehicles with 3 or more axles | RM6.60 |
4 | Taxis | RM1.10 |
5 | Buses | RM2.20 |
Putrajaya Main Toll Plaza[7]
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | FREE |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM3.50 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM7.00 |
3 | Vehicles with 3 or more axles | RM10.50 |
4 | Taxis | RM1.80 |
5 | Buses | RM2.50 |
- Note: Toll charges can only be paid with the Touch 'n Go cards or SmartTAG. Cash payment is not accepted.
Interchanges
Legend:
- I/C - interchange, I/S - intersection, RSA - Rest and service area, OBR - overhead bridge restaurant, L/B - layby, V/P - vista point, TN - tunnel, T/P - toll plaza, BR - bridge
State | District | km | Exit | Name | Destinations | No. of lanes |
Speed limit |
Notes |
---|---|---|---|---|---|---|---|---|
FT Kuala Lumpur | 0.0 | EXIT 2001 | Kampung Pandan I/C | Jalan Tun Razak – Kuala Lumpur City Centre (KLCC), Ampang, Cheras Jalan Kampung Pandan – Kampung Pandan Jalan Davis – City centre, Bukit Bintang Jalan Nahkota Yusuf – Jalan Cochrane, IKEA Cheras 🏬, MyTOWN Shopping Centre 🏬 |
Four | 60 km/h | Multi Level Stacked Interchange | |
BR | Sungai Kerayong bridge | |||||||
T/P | Salak South Toll Plaza | TnG POS Touch 'n Go SmartTAG SmartTAG Touch 'n Go TnG POS | 14 | |||||
EXIT 2002 | Salak South I/C | Six | 80 km/h | From westbound direction only | ||||
BR | Sungai Kerayong bridge | 60 km/h | ||||||
EXIT 2003 | Kuchai Lama I/C | 80 km/h | To northbound direction only | |||||
EXIT 2004 | Bukit Jalil I/C | |||||||
Selangor | Petaling | T/P | Seri Kembangan Toll Plaza | TnG POS Touch 'n Go SmartTAG SmartTAG Touch 'n Go TnG POS | 16 | 60 km/h | Trumpet interchange From / To northbound only | |
EXIT 2004A | Seri Kembangan I/C | Six | 90 km/h | |||||
BR | Seri Kembangan viaduct | |||||||
RSA | Seri Kembangan RSA | Southbound | ||||||
RSA | Seri Kembangan RSA | Northbound | ||||||
Sepang | BR | SKVE viaduct | ||||||
BR | Putrajaya–Cyberjaya viaduct | |||||||
T/P | Putrajaya Main Toll Plaza | TnG POS Touch 'n Go SmartTAG SmartTAG Touch 'n Go TnG POS | 18 | 60 km/h | ||||
EXIT 2005 | Putrajaya Main I/C | Six | 90 km/h | Trumpet interchange KLIA Mainline I/C under construction | ||||
T/P | Putrajaya KLIA Mainline Toll Plaza | TnG POS Touch 'n Go SmartTAG SmartTAG Touch 'n Go TnG POS | For mainline traffic only Under construction | |||||
EXIT 2006 | KLIA I/C | From / To southbound direction only Under construction |
References
- "About Mex - Maju Expressway Sdn Bhd". www.mex.com.my.
- "MEX Seri Kembangan interchange now operational". 14 January 2016.
- "MEX II - Maju Expressway Sdn Bhd". www.mex.com.my.
- "Services - Maju Expressway Sdn Bhd". www.mex.com.my.
- "Maju Expressway Sdn Bhd - MEX". www.mex.com.my.
- "10 Klang Valley toll plazas to go cash-free next week - Metro News - The Star Online". www.thestar.com.my.
- "Toll Rates - Maju Expressway Sdn Bhd". www.mex.com.my.