Cooyar railway line

The Cooyar railway line was a branch line in the Darling Downs region of Queensland, Australia. The small town of Cooyar is about halfway to Kingaroy in the South Burnett region. A plan to connect Kingaroy to the south via Cooyar did not eventuate and left Cooyar at the terminus of a branch line running from Oakey west of Toowoomba.[1] It was opened on 28 April 1913 after previous stages to Kulpi and Peranga opened on 29 April 1912 and 4 November 1912 respectively. The line was partially closed beyond Acland on 1 May 1964, with the last segment closed on 8 December 1969.[2]

Cooyar railway line
Overview
StatusDismantled
TerminiOakey, Queensland
Cooyar, Queensland
Operation
Opened28 May 1923 (1923-05-28)
Closed1961
Operator(s)Queensland Rail
Technical
Line length63 km (39 mi)
Track gauge3 ft 6 in (1,067 mm)
Cooyar Branch route map
0km Oakey
To Toowoomba (left)
To Charleville (right)
Acland
Kulpi
Peranga
Narko
Nutgrove
Wutul
Cooyar

Services

Mixed trains initially ran four times a week and were replaced in 1929 by a daily rail motor service to Toowoomba. The line connected the small towns of Acland, Kulpi, Peranga, Narko, Nutgrove, Wutul and Cooyar to the Queensland Rail western line at Oakey until 1964. This provided passenger and farm produce services not only to these towns but also to the surrounding townships of Quinalow, Maclagan and Evergreen.

Coal was transported between Acland and Oakey, this portion of the branch line remained in service until 1969. A similar parallel branch line existed connected Haden to the Western Line at Kingsthorpe from 1910 to 1964. As the competing service of bullock carts gave way to motor vehicles rail patronage declined resulting in both services becoming uneconomical to maintain.

With negligible track remaining the Oakey-Cooyar branch line could all but be overlooked as a fading scar on the landscape, it retains its significance however through the still intact Muntapa Tunnel. A feat of early Queensland Railways engineering achievement, the Muntapa Tunnel remains the only tunnel in Queensland to pass under the summit of Eastern Australia's Great Dividing Range. This tunnel was constructed with manual labour. It is now home to a colony of bats.

The Oakey-Cooyer branch line is also of early surveying significance. Rail engineering practice of the period avoided the construction of tunnels, so significant surveying was undertaken to avoid tunnelling and to minimise rail gradients. The largest gradient of a line mandates a larger, more expensive loco or a de-rating of carrying capacity, both of which would result in a less economical service for the line as a whole. The Oakey-Cooyar branch line was repeatedly surveyed to arrive at its built route, which had a negligible gradient over its length, but which required the 300m tunnel. The low gradient required a devious route, particularly at Narko and adjacent to the tunnel.

gollark: Or UTF-8, I guess.
gollark: No, I mean all ASCII descriptions of the method.
gollark: At the extreme end, just iterate through... all ASCII descriptions of them, or something.
gollark: You totally could.
gollark: Just buy some GPU time off AWS or whatever and run a lot of them in parallel.

References

  1. Kerr, J. 'Triumph of Narrow Gauge' Boolarong Press 1990
  2. The Cooyar Branch Line Milne, Rod Australian Railway Historical Society Bulletin, July, 1996 pp195-205
  • "Muntapa Tunnel - Trail Description". Retrieved 14 September 2008.
  • "Muntapa Tunnel (entry 602594)". Queensland Heritage Register. Queensland Heritage Council. Retrieved 14 September 2008.
  • Queensland Historical Legal Collection
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.