Ayrshire Coast Line

The Ayrshire Coast Line is one of the lines within the Strathclyde suburban rail network in Scotland. It has 26 stations and connects the Ayrshire coast to Glasgow. There are three branches, to Largs, Ardrossan Harbour and Ayr, all running into the high level at Glasgow Central.

Ayrshire Coast Line
Class 380 train at Troon
Overview
TypeHeavy rail
SystemNational Rail
StatusOperational
LocaleScotland
Stations26
Operation
OwnerNetwork Rail
Operator(s)Abellio ScotRail And Strathclyde Passenger Transport
Rolling stockClass 380
Technical
Number of tracksTriple track, Double track and Single line
Track gauge4 ft 8 12 in (1,435 mm)
Electrification25 kV 50 Hz AC
Route map

Glasgow Central
( St Enoch)
Cardonald
Hillington East
Hillington West
Paisley
Gilmour Street
Johnstone
Milliken Park
Largs
to Arran
Ardrossan
Harbour
Fairlie
Ardrossan Town
West Kilbride
Howwood
Ardrossan
South Beach
Lochwinnoch
Saltcoats
Glengarnock
Stevenston
Dalry
Kilwinning
Irvine
Barassie
to Larne
Troon
Prestwick
International Airport
Prestwick Town
Newton-on-Ayr
Ayr

The route is operated by Abellio ScotRail.

History

The Largs branch in steam days

The Ayrshire Coast Line consists of lines that were formerly part of the Glasgow and Paisley Joint Railway, the Glasgow, Paisley, Kilmarnock and Ayr Railway, the Ardrossan Railway and its Largs Branch extension.

After electrification

Class 318 trains at Paisley Gilmour Street in 1990

The line to Ayr was electrified and Class 318 electric multiple units introduced by British Rail in September 1986. The full electrified service, including trains to Largs and Ardrossan Harbour, commenced on 19 January 1987.[1] These were supplemented by occasional use of Class 303 and Class 311 EMUs, then in use on the Inverclyde Line.

These EMUs replaced the Class 101 and Class 107 DMUs that had served the line for over 30 years. Class 126 DMUs were also used on the line, but they succumbed to old age in the early 1980s.

Services

For most of the day, 6 trains per hour run between Glasgow Central and Kilwinning, 4 go to Ayr whilst 2 service Largs and Ardrossan Harbour branches. Glasgow to Ayr trains which leave Glasgow at xx00 and xx30 between 0830 and 1830 and from Ayr leaving at xx23 and XX50 between 0850 and 1623 will run non stop between Kilwinning and Glasgow Central. After 1900, the service reduces to 4 trains per hour. All trains call at Paisley and Kilwinning with 2 trains going to Ayr while the other 2 serve Ardrossan and Largs. On a Sunday, a reduced service operates, 3 trains per hour run with 2 going to Ayr and 1 going to Largs. 5 trains daily run to Ardrossan Harbour to meet the ferry to Brodick. On Sunday evening, it reduces to only 2 trains per hour with 1 to Ayr and Largs. Troon, Prestwick and Ayr are also served by the Glasgow South Western Line with trains running between Glasgow- Girvan/Stranraer and Kilmarnock-Girvan/Stranraer.


As of August 2020, all services are run by Class 380s. Until they were withdrawn, Class 314s were used on some peak time services when 380s were in short supply. In the August 2020 timetable, Largs and Ardrossan Harbour both run an hourly service and there are roughly 3 trains per hour to Ayr, however the frequency changes several times during the day. There were 5 trains per day between Ayr and Edinburgh until March 2020, these services were already planned to be axed in May 2020 and are not present in the August 2020 timetable. [2]

Route

The line runs along the same Glasgow and Paisley Joint Railway route as the Inverclyde Line as far as Paisley Gilmour Street, using different platforms at Paisley Gilmour Street, where it turns south west towards Kilwinning on the route of the former Glasgow, Paisley, Kilmarnock and Ayr Railway. Here the line branches in two, with one branch running south along the coast to Troon and Ayr. This branch also serves Prestwick Airport station, which opened in 1994. The other branch runs north along the coast to Ardrossan or Largs, becoming a single track for passenger trains after Saltcoats. Beyond Ayr, 'Sprinter' DMUs continue south towards Girvan and Stranraer.

The line connects at Troon with ferries to Larne (summers only), at Ardrossan to Brodick on the Isle of Arran, and at Largs to Great Cumbrae.

gollark: I'm not sure there's much to implement, Peter got it reading the data we need.
gollark: Probably just something like "we have basic robot things working, but progress on implementing the challenges stopped due to the lockdown".
gollark: Does gcd.hs work then, somehow?
gollark: That's suspiciously simple then, hm.
gollark: What's `findRem` doing? Doesn't Haskell have a mod function?

References

Notes

  1. The Rebirth of AyrLine: Electrification to Ayr / Ardrossan / Largs - 1987
  2. https://www.scotrail.co.uk/sites/default/files/assets/download_ct/20200805/rVV6IHhXLS5JEWGKx0yc9qR2BL5DsWbJENnaRuzwIYM/sr2005_20389_ayrshire.pdf Aug-Dec 2020 timetable

Sources

  • "The Rebirth of AyrLine: Electrification to Ayr/Ardrossan/Largs - 1986/1987".
  • "The Rebirth of AyrLine: Electrification to Ayr/Ardrossan/Largs - 1987".

Further reading

  • "The long wait is over for Ayrshire project". Rail Enthusiast. EMAP National Publications. April 1983. p. 42. ISSN 0262-561X. OCLC 49957965.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.