1 Manhattan West
1 Manhattan West is a 67-story office skyscraper in the Manhattan West development. It was completed in 2019 and will serve as the second tower completed in the development after 3 Manhattan West.
Manhattan West Tower 1 | |
---|---|
Under construction, February 2019. | |
General information | |
Status | Complete |
Type | Office |
Address | 401 Ninth Avenue |
Coordinates | 40°45′07″N 73°59′52″W |
Completed | 2019 |
Cost | $1.901 billion[1] |
Height | |
Roof | 995 ft (303 m)[2] |
Technical details | |
Floor count | 67[2] |
Floor area | 171,000 m2 (1,840,600 sq ft) |
Design and construction | |
Architect | Skidmore, Owings and Merrill |
Structural engineer | Skidmore, Owings and Merrill |
Main contractor | Tishman Construction |
History
In July 2018, Wells Fargo provided a $530 million construction loan for the project.[3] The structure topped out in August 2018,[4][5] and officially opened on October 30, 2019.[6]
Architecture and design
The building is 67-stories, 2.1 million square feet and anticipated to achieve LEED Gold certification.[6][7]
The structural system of the tower is composed of a central reinforced concrete core and a perimeter steel moment frame[8]. Part of the tower overhangs the below ground train tracks leading into Penn Station. In order to avoid the tracks, the perimeter columns on the south, north, and east sides do not come down to ground level, but are transferred to the core above the building's lobby.[9]
Tenants
As of September 2019, the building was 86% leased:[10]
- Floors 6-22, 48: Ernst & Young[11]
- Floors 23-27: National Hockey League[12][13]
- Floors 28-46: Skadden[14]
- Floors 50-51: McKool Smith[15]
- Floor 56: Pharo Management[16]
- Floors 59-67: Accenture[17]
References
Wikimedia Commons has media related to 1 Manhattan West. |
- London Investor Presentation & Tour (PDF), Brookfield Property Partners, May 19, 2015
- "1 Manhattan West". CTBUH Skyscraper Center.
- Burke, Mack (July 31, 2018). "Wells Fargo Lends $530M Construction Package for Brookfield's 1 Manhattan West". Commercial Observer.
- Nelson, Andrew (August 16, 2018). "One Manhattan West's Mushrooming Steel Reaches Top Floor, Midtown West". New York YIMBY.
- Hall, Miriam (September 23, 2018). "Inside Brookfield's Manhattan West Megaproject". Bisnow.
- Rosenberg, Zoe (2019-10-30). "Manhattan West's tallest building officially opens". Curbed NY. Retrieved 2019-10-30.
- "First and tallest tower in Manhattan West complex is now open". 6sqft. Retrieved 2019-10-30.
- Georgi I. Petrov; Preetam Biswas; Ronald B Johnson; Aurelie Seblani; Charles Besjak (2019). "Supertall Over the Train Tracks–One Manhattan West Tower". Structural Engineering International. 29 (1).
- Charles Besjak; Preetam Biswas; Georgi I. Petrov; Matthew Streeter; Devin Austin (2017). "Effects of Perimeter to Core Connectivity on Tall Building Behavior". International Journal of High-Rise Buildings. 6 (1).
- "Brookfield 2019 Investor Day Presentation" (PDF). Brookfield Property Partners. September 26, 2019.
- "The 10 biggest office leases of November". The Real Deal. December 14, 2017. Retrieved December 14, 2017.
- Associated Press (December 7, 2016). "NHL moving headquarters to Manhattan's west side". Sportsnet. Retrieved December 7, 2016.
- Sun, Kevin (November 26, 2019). "Here's how much Facebook is paying at Hudson Yards". The Real Deal.
- "Brookfield signs Skadden to mega-lease, will begin construction on 1 Manhattan West". The Real Deal. April 14, 2015.
- Elkies Schram, Lauren (July 11, 2017). "Trial Firm McKool Smith Seals Deal for 64K SF at 1 Manhattan West". Commercial Observer.
- Rizzi, Nicholas (December 20, 2019). "Hedge Fund Pharo Relocating to One Manhattan West". Commercial Observer.
- "Accenture inks 15-year lease at Brookfield's 1 Manhattan West". The Real Deal. August 3, 2017.