Tillynaught railway station

Tillynaught railway station or Tillynaught Junction[5] was a junction railway station in what is now Aberdeenshire, Parish of Fordyce, 6 miles south-west of Banff. Tillynaught was opened in 1859 by the Banff, Portsoy and Strathisla Railway,[4] and in 1867 was absorbed by the Great North of Scotland Railway. This junction station was served by Aberdeen to Elgin trains as well as trains running to the branch terminus at Banff.

Tillynaught
The site of Tillynaught station
Location
AreaAberdeenshire
Coordinates57.643221°N 2.670789°W / 57.643221; -2.670789
Grid referenceNJ 6005 6167
Operations
Original companyBanff, Portsoy and Strathisla Railway
Pre-groupingGreat North of Scotland Railway
Post-groupingLondon and North Eastern Railway
PlatformsThree
History
30 July 1859[1]Banff Line opened
1 April 1884[2]Line to Tochnineal opened
1 May 1886Moray Coast Line opened[3]
6 July 1964Banff branch closed to passengers[1]
6 May 1968Banff and Moray Coast Lines closed to all traffic[1][4]
Disused railway stations in the United Kingdom
Closed railway stations in Britain
A B C D–F G H–J K–L M–O P–R S T–V W–Z

In 1923 the Great North of Scotland Railway was absorbed by the London and North Eastern Railway and in 1948 became part of British Railways. Recommended for closure by Dr Beeching's report "The Reshaping of British Railways" the station closed completely on 6 May 1968.

History

Banff, Portsoy and Strathisla

The old line to Portsoy near Tillynaight station.

The Banff, Portsoy and Strathisla Railway opened on 30 July 1859, with a 16 14 miles (26.2 km) line from Banff to Grange, on the Great North of Scotland Railway (GNoSR) main line, with a 3 14 miles (5.2 km) branch from Tillynaught to Portsoy.[6] On 1 February 1863 the GNoSR took over services and the railway renamed the Banffshire Railway.

Moray Coast Line

A new station was built at Portsoy for the through line, which opened, together with a 4 12 miles (7.2 km) extension to Tochieneal, on 1 April 1884. The Countess of Seafield had not allowed a direct route to be built through Cullen House policies and to avoid the estate lands several bridges were and an impressive viaduct at Cullen had to be built. The Moray Coast Line opened on 1 May 1886, through Aberdeen to Elgin services called at Tillynaught.[3]

In 1923 the Great North of Scotland Railway was absorbed by the London and North Eastern Railway and railway nationalisation followed in 1948, services then being delivered by British Railways. The station and the line via Buckie was recommended for closure by Dr Beeching's in The Reshaping of British Railways,[7] closed on 6 May 1968.[4]

Banff, Portsoy and
Strathisla Railway
Overview
LocaleScotland
Operation
Opened1859
Closed1968
Events
Successor lineGreat North of Scotland Railway
Technical
Line length19 12 miles (31.4 km)
Track gauge4 ft 8 12 in (1,435 mm)
Route map
Banff
Golf Club House
Bridgefoot Halt
Ladysbridge
Ordens
Portsoy Harbour
Portsoy
1st station
Goods only after 1884
Portsoy
2nd station and line to Tochieneal
opened in 1884, through to Elgin in 1886
Tillynaught
Cornhill
Glenbarry
Knock
Millegin
to Keith
Grange
Curve giving access from
Aberdeen opened in 1886
Cairnie Junction
(opened 1897)
Rothiemay
Huntly

The station infrastructure

In 1866-7 the station apparently had no sidings, possessing an island platform and only two buildings indicated.[8] By 1902 the junction had two signal boxes, a pedestrian footbridge, a weighing machine and a complex arrangement of sidings and points.[9] The Tillnaught Junction signalling diagram for 1934 shows a single wooden signal box, two sidings on the Banff side and [10] the sign stated Change for Ladysbridge and Banff.[11] The island platform once had an impressive overall canopy that had been removed by 1960.[12]

After closure the station buildings were demolished and the platforms infilled. The nearby station master's house and ancillary houses have been converted into a private dwelling.[13]

Services

Tillynaught had six trains a day to Portsoy after being taken over by the GNoSR, three of these reversed and continued to Banff.[14] Tochieneal had services from when the line reached there in 1886. The Moray Coast Line was served by four through trains a day between Aberdeen to Elgin and these trains called at Tillynaught.[15]

Portsoy was served by four Aberdeen to Inverness trains in the summer of 1948, with a mid-day Keith Town to Inverness service and an evening service from Aberdeen that terminated at Elgin. There were three through services from Inverness to Aberdeen, a service from Lossiemouth and Elgin to Aberdeen and a Saturday service from Inverness to Keith that after 19 June was accelerated and extended to Aberdeen. There were no Sunday services.[16]

Micro-history

The station was located in a very rural area and was named after a local farm and water mill.[17]

Preceding station Historical railways Following station
Cornhill   Banff, Portsoy and Strathisla
Great North of Scotland
Portsoy branch
1859–1884
  Portsoy
Cornhill
Towards Grange
  Great North of Scotland
Banff branch
1884–1886
  Ordens
Towards Banff
Cornhill
Towards Keith and Aberdeen
  Great North of Scotland
London and North Eastern
British Railways
Moray Coast Line
1886–1968
  Portsoy
Towards Elgin and Inverness
gollark: You know how I said that companies were obligated to release the source code to the kernel on their device? Some just blatantly ignore that (*cough*MediaTek*cough*). And when it *is* there, it's actually quite bad.
gollark: It's actually worse than *just* that though, because of course.
gollark: There are some other !!FUN!! issues here which I think organizations like the FSF have spent some time considering. Consider something like Android. Android is in fact open source, and the GPL obligates companies to release the source code to modified kernels and such; in theory, you can download the Android repos and device-specific ones, compile it, and flash it to your device. How cool and good™!Unfortunately, it doesn't actually work this way. Not only is Android a horrible multiple-tens-of-gigabytes monolith which takes ages to compile (due to the monolithic system image design), but for "security" some devices won't actually let you unlock the bootloader and flash your image.
gollark: The big one *now* is SaaS, where you don't get the software *at all* but remote access to some on their servers.
gollark: I think this is a reasonable way to do copyright in general; some (much shorter than now!) length where you get exclusivity, which can be extended somewhat if you give the copyright office the source to release at the end of this perioid.

References

Footnotes

Sources

  • Beeching, Richard (1963). The Reshaping of British Railways (PDF). HMSO.
  • Beeching, Richard (1963). The Reshaping of British Railways (maps) (PDF). HMSO.
  • Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Patrick Stephens Ltd. ISBN 1-85260-508-1.CS1 maint: ref=harv (link)
  • Barclay-Harvey, Malcolm (1950). A History of the Great North of Scotland Railway. Ian Allan. ISBN 978-0-7110-2592-9.CS1 maint: ref=harv (link)
  • Maxtone, G.R. (2005). The Railways of the Banff & Moray Coast. Keith & Dufftown Railway Association. ISBN 0-9547346-1-0.CS1 maint: ref=harv (link)
  • Vallance, H. A. (27 June 1991). Great North of Scotland railway. The History of the Railways of the Scottish Highlands vol 3. David St John Thomas. ISBN 978-0-946537-60-0.CS1 maint: ref=harv (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.