Rail transport in Mauritius

There are no operational long-distance railways in Mauritius. A system existed from the 1860s to the 1960s. In 1956 the Mauritius Government Railways had 146 km (91 mi) of 1,435 mm (4 ft 8 12 in) (standard gauge) track and 47 locomotives.[1]

With increasing road traffic congestion, plans surfaced in 2009 for a metro system.[2]

Map

Light rail system

Initial plans suggested a 24.9 km line which would relieve pressure on busy roads; it would be supported by a feeder network of buses.[4][5]

The first line would go from the capital at Port Louis to Curepipe, mostly following the trackbed of a former Government railway closed in the 1960s.[6]

On 2 August 2017 it was announced that Larsen & Toubro would be the contractor responsible for constructing the metro network.[7][8]

The first stage, Port Louis to Rose Hill Central, was opened on 10 January 2020. The second stage, to Curepipe, is scheduled to be completed in 2021.

gollark: https://raw.githubusercontent.com/oakes/vim_cubed/master/vim3.gif
gollark: https://media.discordapp.net/attachments/348702212110680064/901480122178211910/FCWgd6fVUAMFkYE.png?width=894&height=623
gollark: Imagine using cans.
gollark: They have a bunch of important sensory things, if I recall correctly.
gollark: Well, all sufficiently popular things are inevitably allowed.

See also

References

Notes

Further reading

  • Robinson, Neil (2009). World Rail Atlas and Historical Summary. Volume 7: North, East and Central Africa. Barnsley, UK: World Rail Atlas Ltd. ISBN 978-954-92184-3-5.

Media related to Rail transport in Mauritius at Wikimedia Commons


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.