Pingguoyuan station

Pingguoyuan station (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn; lit.: 'Apple Orchard station') is a station on Line 1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing. The station for Line 1 was opened on April 23, 1973.

Pingguoyuan

苹果园
Line 1 platform
LocationPingguoyuan South Road (苹果园南路)
Pingguoyuan Subdistrict, Shijingshan District, Beijing
China
Coordinates39°55′36″N 116°10′39″E
Operated byBeijing Mass Transit Railway Operation Corp., Ltd
Line(s)     Line 1 (Closed until late 2021 for renovation)
     Line 6 (Not Opened)
     S1 line (under construction)
Other information
Station code103 (Line 1)
History
OpenedApril 23, 1973 (Line 1)
2021[1] (Lines 6 and S1)
ClosedApril 18, 2020 (Closed until late 2021 for renovation)
Services
Preceding station   Beijing Subway   Following station
TerminusLine 1
Location
Pingguoyuan
Location in Beijing

Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2021.

Future Development

It is planned to be a transfer station of Line 1, Line 6, and S1 line. The Line 1 station and Line 6 station are underground, and the S1 line station is elevated.

Line 6

The Pingguoyuan station for Line 6 has not yet opened. Line 6 trains only pass through the station without stopping.[2]

S1 line

The S1 line will be extended to Pingguoyuan. The extension is under construction. The elevated station for S1 line will open together with the Pingguoyuan Transportation Hub which will be finished in 2021.[1]

Station layout

Platform panorama of Line 1 Pingguoyuan station.

The line 1 of Pingguoyuan station has two underground side platforms and both are the only two platforms of Beijing Subway stations that haven't installed platform gates due to the aging of platform devices.

The station for Line 1 is closed for renovation, and the platform gates will be installed after the renovation is finished.[3]

G Concourse Exits A-D, Faregates, Station Agent
B1 Mezzanine Platform access
B2
Side platform, doors open on the right
Westbound      Line 1 termination track
Eastbound      Line 1 towards Si Hui Dong(E) (Gucheng)
Side platform, doors open on the right

Exits

      Exit Destination
Pingguoyuan South Rd.
Pingguoyuan South Rd.
Pingguoyuan South Rd.
Pingguoyuan South Rd.

Line 1

gollark: Plus travel time and possible queueing.
gollark: Yes. It's not very effective, but it at least shows you really don't like the options!
gollark: Solution: don't vote, but then whenever anyone brings up the subject, just change the subject and distract them.
gollark: > Why is the IQ of everyone using Twitter, Facebook, etc all like 40? It’s amazing just how dumb people on social media areThey have incentives to show you stuff which will make you very outraged, to boost engagement.
gollark: I have, mercifully, been able to avoid it so far.

References

  1. "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20.
  2. http://partner.qianlong.com/mip/2985287.shtml
  3. "北京地铁1号线安全门全线投入使用". Beijing Municipal Commission of Transport. 2017-09-11. Archived from the original on 2017-09-12. Retrieved 2017-09-12.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.