Otoyol 31

Otoyol 31, named the İzmir-Aydın Motorway (Turkish: İzmir-Aydın Otoyolu) or just the Aydın Motorway and abbreviated as the O-31 is a 127.8 km (79.4 mi) long toll motorway in western Turkey. Beginning at an intersection with İzmir Beltway, the O-31 runs south from İzmir to Aydın and parallels the D550 for most of its route.

O-31
Otoyol 31
İzmir-Aydın Otoyolu
Route information
Part of E87
Length127.8 km (79.4 mi)
Existed1996[1]–present
Major junctions
North end O-30 in Buca, İzmir
 
South end D.320 in Aydın
Location
RegionsAegean
Provincesİzmir, Aydın
Major citiesİzmir, Aydın
Highway system
Motorways in Turkey
List
O-30O-32

Plans to extend the O-31 further to Denizli and Burdur have been finalized and the tender is expected to be awarded on 18 September 2018.[2]

Route Description

İzmir

The O-31 in the Lesser Menderes Plain.

The O-31 begins at Işıkkent interchange, a trumpet interchange with the İzmir Beltway (O-30) in southeast Buca, İzmir, outside the urban city zone.[3] From there, the route heads south through the recently closed Işıkkent Toll Plaza until reaching the Lesser Menderes Plain. The motorway crosses over the D.550, which is accessible via Exit K1. Exit K1, named Havalimanı, also provides access to Adnan Menderes Airport, via the D.550.[3]

Following Exit K1 the O-31 becomes a toll motorway after passing through Pancar Toll Plaza, which uses automated vehicle classification to recognize different types of vehicles and price them accordingly.

The next and first tolled exit on the motorway is Exit K2, named Torbalı, which is the Torbalı connector. The 4 km (2.5 mi) long Torbalı connector links the O-31 to the D.550 just north of Torbalı. Following Exit K2, the motorway continues south bypassing Torbalı on the west. Near the village of Sağlık, is the Sağlık Rest Area, which consist of restaurants and a gas station.[3] Exit K3, named Belevi, is the last exit within the İzmir province. This exit connects to the D.550 to Selçuk as well as the coastal city of Kuşadası.[3]

After Exit K3, the O-31 passes over the 559 m (1,834 ft) long Belevi viaduct and then enters the 3,048 m (10,000 ft) long 75th Anniversary Selatin Tunnel (Turkish: 75. Yıl Selatin Tüneli), passing through the Aydın Mountains and into Aydın Province.

Aydın

The southbound portal of the 75th Anniversary Selatin Tunnel.

After exiting the tunnel, the Selatin Rest Area is available for northbound drivers. The motorway descends into the Greater Menderes Plain and turns east. After passing over the Kızılcapınar viaducts, Exit K4, named Germencik, connects to the D.525 to Söke, as well as the D.550 to Germencik. Following the exit, the Germencik Rest Area is available to southbound drivers. After passing over the İkizdere Creek, the tolled section ends at the Aydın Toll Plaza.[3]

Right after the toll plaza is Exit K5, named Aydın North, with the D.550 in west Aydın. The O-31 becomes the Aydın Beltway and runs around the south of the city. The next exit is Exit K6 with the D.550, which heads south to Muğla. Up until 2016, this was the end of the motorway. Following Exit K6, is the incomplete Exit K7. Exit K7 is where the motorway will continue east to Denizli and Burdur, but for now the O-31 branches off its future route and continues as the Aydın Beltway. The next exit, Exit K71, connects to Mehmet Ali Tosun Boulevard and the Aydın Airport. The route then curves north and ends at an intersection with the D.320 in east Aydın.[3]

Exit list

ProvinceDistrictkmmiExitDestinationsNotes
İzmirBuca0.00.0K7 O-30 (İzmir Beltway) Balçova, Bornova, MenemenTrumpet interchange
Menderes11.47.1K1 D.550 – Adnan Menderes Airport, Gaziemir
15.39.5Pancar Toll Plaza
Torbalı20.512.7K2Torbalı connector — TorbalıFeeder to D.550
Selçuk34.521.4K3 D.550 Selçuk
İzmirAydın lineTireGermencik line41.325.775th Anniversary Selatin Tunnel
AydınGermencik79.149.2K4 D.525 Söke
D.550 Germencik
Aydın11169Aydın Toll Plaza
113.770.6K5 D.550 Aydın, İncirliovaWestern end of the Aydın Beltway
118.973.9K6 D.550 Çine, Muğla
120.775.0K7 O-31 Denizli, BurdurFuture route of the O-31; tender expected to be awarded on 18 September 2018
122.576.1K71Mehmet Ali Tosun Boulevard Aydın Airport
127.879.4K72 D.320 Nazilli, DenizliEastern end of the Aydın Beltway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Tolled
  •       Unopened
gollark: I'm considering putting up an info section with the seeeeecret ND stuff.
gollark: It has been done.
gollark: I have no idea how that works, so... no, unless someone does.
gollark: Honestly, you make *one* dev version pink and you never hear the end of it.
gollark: https://forums.dragcave.net/topic/183544-yet-another-hatchery/Yet Another Hatchery is now on the forum!

See also

References

  1. Şevik, Setenay; Eser, Levent Yahya (2016). "Türkiye'de Karayollarında Fiyatlandırma ve Özelleştirme Uygulamaları: Bir Model Önerisi". Ekonomik ve Sosyal Araştırmalar Dergisi. Vol. 12 no. 1. Retrieved 19 March 2020.
  2. "Aydın-Denizli Otoyolu ihalesi 18 Eylül'e ertelendi!". emlakkulisi.com (in Turkish). 14 August 2018. Retrieved 29 August 2018.
  3. "İzmir Bölgesi Otoyol Haritası". kgm.gov.tr. Retrieved 31 August 2018.
  • Media related to Otoyol 31 at Wikimedia Commons
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.