M85 expressway (Hungary)

The M85 expressway (Hungarian: M85-ös autóút) is a Hungarian expressway connecting Győr to Sopron. It will eventually connect M1 motorway to the Austrian border.

M85 expressway
M85-ös autóút
in use planned other highways
Route information
Length28 km (17 mi)
95 km (59 mi) planned
Existed2008–present
Major junctions
From M1 near Győr
 
  • M86 near Csorna
  • 84 near Nagycenk
  • 861 in Kópháza
ToSopron
A3 border with  Austria
Location
CountiesGyőr-Moson-Sopron
Major citiesGyőr, Csorna, Sopron
Highway system
Junction near Győr
The motorway in Enese bypass
Near Csorna

Openings timeline

  • Győr; M1 – Enese (8 km): 2015.06.16.[1]
  • Enese bypass (7 km): 2011.12.21.
  • Enese – Kóny (3 km): 2015.06.16.[1]
  • Kóny – Csorna (6 km): 2015.09.09.[2]
  • Csorna bypass; I.section (east) (5 km):[2] 2015.09.09.; (this section was extended 2x3 lane)
  • Csorna bypass; II.section (west) (4.5 km):[3] 2017.12.15.

Junctions, exits and rest area

  • The route is full length expressway. The maximum speed limit is 110km/h, with (2x2 lane road).
km Destinations Route Notes
0 Győr-nyugat
M85-M1 interchange
M1
E60
E75
Western connection to Győr, towards to Budapest or  Austria
Győr, Ikrény 85
8 Rábapatona 84128
10 Enese, Bezi 8417
16 Kóny, Rábcakapi 8502
8509
21 Csorna-kelet 85 Eastern connection to Csorna
23 M85-M86 interchange
(Csorna bypass)
M86
E65
Eastern part of Csorna bypass
Connection to Mosonmagyaróvár and  Slovakia
The northern terminus of European routes E65
Bridge over Railway Line 8 (Győr-Sopron)
25 Bridge over Railway Line 14 (Pápa-Csorna)
27 M85-M86 interchange
(Csorna bypass)
M86
E65
Southern part of Csorna bypass
Connection to Szombathely and  Slovenia
The southern terminus of European routes E65
28 Bridge over Railway Line 16 (Hegyeshalom-Szombathely)
31 Csorna-nyugat, Farád 85 Western connection to Csorna
40 Babóti pihenőhely Rest area
42 Kapuvár, Kisfalud 8611
52 Fertőendréd, Fertőd 85
60 Fertőszentmiklós, Röjtökmuzsaj 8627
68 Bridge over Railway Line 8 (Győr-Sopron)
71 Nagycenk, Pereszteg 84
77 Nagycenki pihenőhely Rest area
79 Bridge over Railway Line 15 (Sopron-Szombathely)
81 Sopron-kelet, Kópháza, Harka 84
8645
Eastern connection to Sopron
84 Balf 8518
87 Sopron-észak, Fertőrákos 8527 Northern connection to Sopron
89 Bécsi domb (Tunnel - 780 m)
90 Sopron-nyugat, Ágfalva 85 Western connection to Sopron
95 Soproni pihenőhely Rest area
Sopron (H) – Klingenbach (A) border crossing
Südost Autobahn → to Vienna, Austria
  •      Under construction,      Planned section

Maintenance

The operation and maintenance of the road by Hungarian Public Road Nonprofit Pte Ltd Co. This activity is provided by these highway engineers.

  • in Csorna, mixed - use engineering
  • near Nagycenk, kilometre trench 71 (under construction)

Payment

Hungarian system has 2 main type in terms of salary:

1, time-based fee vignettes (E-matrica); with a validity of either 10 days (3500 HUF), 1 month (4780 HUF) or 1 year (42980 HUF).[4]

2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:

Type of county vignetteAvailable section
Győr-Moson-Sopron County full length (0 km – 27 km)
gollark: <@151391317740486657> It has many other problems.
gollark: I'm fine, been working on potatOS again.
gollark: You cannot escape.
gollark: Hello. Laser bees have been activated.
gollark: oh look, it is wyatt the annoying.

See also

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.