Line S3 (Chengdu Metro)
Line S3 of the Chengdu Metro, (simplified Chinese: 成都地铁S3号线; traditional Chinese: 成都地鐵S3號線) is also known as Ziyang Line. It is an approved express inter-city train line in Chengdu. The line is 39.71 km long and connects Chengdu Tianfu International Airport airport town area to Ziyang.[4][5] The subway line will use 160 km/h Type-A trains operating. The investment is 14.93 billion CNY. Ziyang Line will have both underground and ground level sections. It also passes through Tuo River between 1st Tuo River Bridge and 3rd Tuo River Bridge.[6]
Chengdu Metro Line S3 | |
---|---|
S3 | |
Overview | |
Type | Rapid transit |
System | Chengdu Metro |
Locale | Chengdu, Sichuan |
Termini | Futian Station Ziyang North Railway Station |
Stations | 7 |
Operation | |
Planned opening | Anticipated December 2024[1] |
Owner | City of Chengdu |
Operator(s) | Chengdu Metro Corporation |
Character | underground and elevated |
Technical | |
Line length | 39.71 km (24.7 mi)[2] |
Number of tracks | 2 |
Electrification | overhead lines, 1,500 V DC |
Operating speed | 160km/h[3] |
Ziyang Line connects Futian Station (transfer to Line 18), and enters hilly regions. Lvjiazu Station can transfer to Line 13. 然后线路向东南穿过成都与资阳间的浅丘地带,进入资阳市临空经济区后沿成资大道敷设,并于规划路口设临空经济区站接车辆段;出站后线路跨过成渝高速进入资阳市,then Ziyang Line goes underground. It passes through 幸福大道-仁德西路-南骏大道-滨江大道-宝台大道-蜀乡大道 underground and 在娇子大道口设置娇子大道站(地下), 苌弘广场前设置苌弘广场站(地下), after it passes Tuo River and goes into Tuodong New Area, 后沿宝台大道—蜀乡大道地下敷设, 于宝台大道与迎宾大道交叉口处设宝台大道站(地下). The line ends with Ziyang North Railway Station at Ziyang's High Speed Rail Station. The line is designed to use Type-A trains operating at 160 km/h.[7][8]
Total investment for the line is 14.93 billion CNY.[8] 40% is paid by Chengdu; relocation fee in Ziyang is paid by Ziyang Government; 54.1% left is mortgage from bank. This project takes 50 months, marking the opening date at 2024.[9]
Stations
Station name | Transfer | Distance (km) |
District | ||
---|---|---|---|---|---|
English | Chinese | ||||
Futian | 福田站 | 18 | 0 | Tianfu New Area | |
Lvjiazu | 吕家咀 | 13 | |||
Airport CBD | 临空经济区 | Ziyang | |||
Jiaozi Avenue | 娇子大道站 | ||||
Kuhong Square | 苌弘广场站 | ||||
Baotai Avenue | 宝台大道站 | ||||
Ziyang North Railway Station | 资阳北站 | 39.71 | |||
Trains and Operation
Operation Phase | Train Type | Cabin number | Operation Speed (km/h) | Frequency (Trains/Hour) | Interval (Mins) | Capacity (Riders/Hour) |
---|---|---|---|---|---|---|
Opening Phase | A | 4 | 140 | 6 | 12 | 4500 |
近期 Near Phase | A | 4 | 140 | 12 | 5 | 8900 |
远期 Final Phase | A | 4 | 160 | 15 | 4 | 11100 |
This subway line uses Type-A Trains operating at 160 km/h speed and powered by 25kV AC overhead lines. The whole line will use 4-car Trains in opening and foreseeable future, with 11 Trains (44 Cars) planning to be purchased[11].
References
- "轨道交通资阳线获审批通过!" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- "轨道交通资阳线获审批通过!长约39.71km直达资阳北站" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- "轨道交通资阳线,批了!" (in Chinese). 网易新闻(资阳发布). 2020-08-06. Retrieved 2017-08-06.
- "轨道交通资阳线工程正式获批 成资同城化将更近一步" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- "轨道交通资阳线获审批通过!长约39.71km直达资阳北站" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- "轨道交通资阳线工程正式获批 成资同城化将更近一步" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- "轨道交通资阳线,批了!" (in Chinese). 网易新闻(资阳发布). 2020-08-06. Retrieved 2017-08-06.
- "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川在线 Sichuan Online. 2020-08-06. Retrieved 2017-08-06.
- "地铁S3资阳线与18号线"同型"车,最高160KM/h" (in Chinese). 今日头条 toutiao. 2020-08-08. Retrieved 2020-08-08.
- "地铁S3资阳线与18号线"同型"车,最高160KM/h" (in Chinese). 今日头条 toutiao. 2020-08-08. Retrieved 2020-08-08.
- "地铁S3资阳线与18号线"同型"车,最高160KM/h" (in Chinese). 今日头条 toutiao. 2020-08-08. Retrieved 2020-08-08.