Line 30 (Chengdu Metro)

Line 30 of the Chengdu Metro is a subway line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs runs tangentially on the south side of the Chengdu from Shuangliu International Airport Terminal 2 to Hongjia Bridge Stations. Phase 1 is 26.427 km long with 23 stations, all underground.[1] Line 30 will use 6-car Type-B train operating up to 80 km/h.[2] Line 30 will be served by two depots at Gaobeiba and Hongjiao Bridge.[2]

Chengdu Metro Line 30
30
Overview
TypeRapid transit
SystemChengdu Metro
StatusConstruction
LocaleChengdu, Sichuan
TerminiTerminals 2 of Shuangliu International Airport Station
Hongjia Bridge Station
Stations23
Operation
Planned opening2024
OwnerCity of Chengdu
Operator(s)Chengdu Metro Corporation
Characterunderground and elevated
Depot(s)Gaobeiba Depot (高碑坝车辆段)
Hongjiao Bridge Depot (洪家桥停车场)
Technical
Line length26.427 km (16.4 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Electrificationoverhead lines, 1,500 V DC
Operating speed80km/h

Progress

  • On Aug 21 2019, Line 30 is approved officially as part of《The fourth phase expansion for the Chengdu Metro》by National Development and Reform Commission, confirming it for 2019-2024's subway construction plan.
  • On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[3]
  • On July 17, 2020, Construction officially started for the 4 stations on Line 30 in Longquanyi District.[4]
gollark: Hello SolarFlame5!
gollark: Yes.
gollark: That is a texture pack and a half.
gollark: hi.
gollark: They don't, as far as I know.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.