Line 5 (Chengdu Metro)

Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Chengdu. It starts at Huagui Road and ends at Huilong. The total length is 49.018 km (30.5 mi).

Line 5
5
Qingyang Taoist Temple station of Line 5 Platform
Overview
TypeRapid transit
SystemChengdu Metro
StatusIn operation
LocaleChengdu, Sichuan
TerminiHuagui Road
Huilong
Stations41
Services2
Operation
Opened27 December 2019
OwnerCity of Chengdu
Operator(s)Chengdu Metro Corporation
CharacterUnderground and Elevated
Depot(s)Huagui Road Depot
Rolling stock8-car Type A
Technical
Line length49.018 km (30.5 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead lines, 1,500 V DC
Route map

Huagui Road
Dafeng depot
Baishuichang
Liaojiawan
Beibu Shopping Mall
Xingfuqiao
Jiudaoyan
Dujianian
Dafeng
Shixi Park
Huanghuayuan
Lujiaqiao 9
( Outer  Inner )
Quanshui Road
Dongzikou
Funing Road
Wukuaishi
Saiyuntai
2nd Beizhan Road West 7
( Outer  Inner )
Xibeiqiao 6
( Wangcongci  Lanjiagou )
Huapaifang
Fuqin 17
( Wansheng  Xihe )
( Xipu  Longquanyi )
Chengdu University of TCM and
Sichuan Provincial People's Hospital
2 4
Qingyang Taoist Temple
Provincial Orthopaedics Hospital
Gaoshengqiao 3
( Shuangliu West Station  Chengdu Medical College )
Keyuan
Jiuxing Avenue 8
( Lianhua  Shilidian )
Shenxianshu 7
( Inner  Outer )
Shiyang Flyover
Chengdu First People's Hospital
Jiaozi Avenue
Jincheng Avenue 9
( Inner  Outer )
Yuanhua depot
Jincheng Lake
Dayuan
Minle
Qilong
The Police College
Erjiang Temple
Nanhu Flyover
Yixin Lake
Longma Road
Huilong 6
( Lanjiagou  Wangcongci )
Huilong depot
Maojiawansenlingongyuan
Wenwuhui
Yong'an North
Yong'an

Line 5's color is purple. This line began construction on 14 September 2015[1], was opened on 27 December 2019, from Huagui Road to Huilong.

Originally, the line was planned to use 6-car Type A rolling stock. However, anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential areas, the line was redesigned to allow for expansion to use 8-car Type A rolling stock.[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.[3][4]

Chengdu Metro Line 5 Signal Colour [5]

Progress

  • 2015
    • July 6, Phase 1 & 2 are officially approved.[6]
    • In August, all stations started construction.[7]
  • 2016
    • August 18, first tunnel boring machine started tunneling between Jiudaoyan and Dujianian.[8]
    • November 3, first tunnel section is finished.[9]
    • November 4, to accommodate the projected high demand, Line 5 was redesigned from supporting 6-car A-Type trains to 8-car A-Type trains.[10]
    • November 12, Dujianian topped out, being the first station on the line to do so.[11]
  • 2017
    • May 25, Keyuan to Gaoshengqiao is the first to finish all tunnel work.[12]
    • December 5, Phase 1 & 2 begins track-laying.[13]
  • 2018
    • April 17, first trainbody was completed by CRRC Chengdu. It is the first A-type train for Chengdu Metro.[14]
    • September 9, tunnel construction is finished.
    • November 10, first train for Dafeng Depot arrived.
    • November 22, elevated sections finished sound barrier work.
    • December 11, Elevated sections finished power-off testing from Huagui Road to Xingfuqiao.
    • December 15, Elevated sections and Dafeng Depot finished testing.
    • December 28, Phase 1 & 2 finished track-laying.
  • 2019
    • January 18, Huilong Power Centre is offcially powered on.
    • January 22, 5号线二江寺站至回龙主变电所五站五区间35kV环网电力电缆送电成功。
    • April 27, Phase 1 & 2's whole power network is powered on.
    • April 28, Phase 1 & 2 finished powered-on system testing.
    • April 30, Phase 1 & 2's track is now operating by Chengdu Metro Company.
    • June 30, first 7 stations are now operating by Chengdu Metro Company.
    • July 31, second 12 stations are now operating by Chengdu Metro Company.
    • August 23, elevated sections finished power test and decoration.
    • October 30, 41 stations are fully functional and finished station testing; all stations are now operating by Chengdu Metro Company.
    • November 8, the 110kV main power centres passed quality assessment.
    • November 22, all escalators passed government assessment.
    • December 9, Phase 1 & 2 passed safety assessment.
    • December 25, Chengdu Metro officially announced Line 5's opening date schduled for December 27 is the opening time.
    • December 27, Phase 1 & 2 started public operation.
  • 2020
    • August 8, Line 5 trains will have different air conditioning settings in each car. Riders can choose between the center four cars which are set to 27 degrees or the two cars on each end which are set to 25 degrees.[15]

Timeline

SegmentCommencementLengthStation(s)Name
Huagui Road — Huilong 27 December 2019 49.018 km (30.5 mi) 41 Phase 1 & 2

Stations

Station name Transfer Distance
km
Location
English Chinese
Huagui Road 华桂路 - 0.000 Xindu
Baishuichang 柏水场 1.139 1.139
Liaojiawan 廖家湾 0.856 1.995
Beibu Shopping Mall 北部商贸城 1.983 3.978 Jinniu
Xingfuqiao 幸福桥 1.582 5.560
Jiudaoyan 九道堰 1 (planned) 0.932 6.492
Dujianian 杜家碾 0.766 7.258
Dafeng 大丰 0.848 8.106 Xindu
Shixi Park 石犀公园 1.711 9.817
Huanghuayuan 皇花园 0.816 10.633
Lujiaqiao 陆家桥 1.123 11.756 Jinniu
Quanshui Road 泉水路 1.299 13.055
Dongzikou 洞子口 1.038 14.093
Funing Road 福宁路 0.769 14.862
Wukuaishi 五块石 0.921 15.783
Saiyuntai 赛云台 0.765 16.548
2nd Beizhan Road West 北站西二路 7 0.775 17.323
Xibeiqiao 西北桥 6 (U/C) 1.499 18.822
Huapaifang 花牌坊 0.906 19.728
Fuqin 抚琴 0.998 20.726
Chengdu University of TCM &
Sichuan Provincial People's Hospital
中医大省医院 2 4 1.293 22.019 Qingyang
Qingyang Taoist Temple 青羊宫 0.676 22.695
Provincial Orthopaedics Hospital 省骨科医院 0.915 23.610
Gaoshengqiao 高升桥 3 1.358 24.968 Wuhou
Keyuan 科园 1.400 26.368 High-Tech Zone
Jiuxing Avenue 九兴大道 8 (U/C) 0.959 27.327
Shenxianshu 神仙树 7 1.599 28.926
Shiyang Flyover 石羊立交 1.811 30.737
Chengdu First People's Hospital 市一医院 0.662 31.399
Jiaozi Avenue 交子大道 0.851 32.250
Jincheng Avenue 锦城大道 9 (U/C) 0.858 33.108
Jincheng Lake 锦城湖 1.334 34.442
Dayuan 大源 1.503 35.945
Minle 民乐 1.027 36.972
Qilong 骑龙 1.722 38.694 Tianfu New Area
The Police College 警官学院 1.449 40.143
Erjiang Temple 二江寺 1.479 41.622
Nanhu Flyover 南湖立交 1.292 42.914
Yixin Lake 怡心湖 2.034 44.948
Longma Road 龙马路 1.649 46.597
Huilong 回龙 6 (U/C) 1.605 48.202

See also

References

  1. 成都地铁5号线设41个站 2019年开通运营 [Chengdu Metro Line 5 str 41 stations To be opens in 2019] (in Chinese). Sichuan News. 21 May 2015. Retrieved 2015-07-04.
  2. "Archived copy" 成都地铁5号线将采用“8A”车辆编组 每列车定员2144人_网易新闻. 163.com news. Archived from the original on 2016-11-13. Retrieved 2018-07-04.CS1 maint: archived copy as title (link)
  3. 成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都. cd.house.ifeng.com. Retrieved 2016-11-20.
  4. 1号线太挤?“大肚子”5号线救急. 2018-04-18.
  5. "测评!成都地铁的色号,总有一款你会喜欢!". 成都地铁 Chengdu Metro. 2020-07-22.
  6. "成都地铁5号线一、二期工程获批 工期四年半" (in Chinese). 四川新闻网. 2015-07-06. Retrieved 2015-07-06.
  7. "成都最长在建地铁线路5号线 首台盾构下井(图)" (in Chinese). 凤凰网. 2016-08-19. Retrieved 2016-08-19.
  8. "成都地铁5号线一、二期工程首段盾构区间贯通" (in Chinese). 网易. 2016-11-03. Archived from the original on 2018-04-27. Retrieved 2016-11-03.
  9. "成都地铁5号线将采用"8A"车辆编组 每列车定员2144人" (in Chinese). 网易. 2016-11-04. Archived from the original on 2016-11-13. Retrieved 2016-11-04.
  10. "成都地铁5号线一、二期工程首个车站主体结构顺利封顶" (in Chinese). 四川在线. 2016-11-13. Retrieved 2016-11-13.
  11. "成都地铁5号线科园站-高升桥站间双线贯通 已17站封顶" (in Chinese). 四川新闻网. 2017-05-26. Retrieved 2017-05-26.
  12. "成都地铁5号线一二期工程正式开始铺轨(图)" (in Chinese). 凤凰网. 2017-12-05. Retrieved 2017-12-05.
  13. "首列"成都造"地铁5号线A型铝合金车体下线" (in Chinese). 搜狐. 2018-04-18. Retrieved 2018-04-18.
  14. "怕冷的中间走,怕热的两头去!成都地铁5号线"分区控温"来了" (in Chinese). 四川在线. 2020-08-08. Retrieved 2020-08-08.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.