Line 4 (Changchun Subway)

Line 4 of the Changchun Subway (Chinese: 长春轨道交通4号线; pinyin: Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn) is a light metro line running from north to south Changchun. It was opened on 30 June 2011. It is currently 16.33 km long with 15 stations.[1][2] Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic.[3] This is similar to U6 of the Vienna U-Bahn.

Line 4
 4 
Overview
TypeRapid transit
SystemChangchun Subway
StatusOperational
LocaleChangchun, Jilin, China
TerminiChangchun Railway Station (North)
Tiangong Road
Services1
Operation
Opened30 June 2011 (2011-06-30)
OwnerChangchun
Operator(s)Changchun Rail Transit Corporation
Characterelevated and underground
Technical
Line length16.33 km (10.15 mi)[1]
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)

Opening timeline

SegmentCommencementLengthStation(s)Name
Dongdaqiao Bridge — Tiangong Road 30 June 2011 13.0 km (8.08 mi) 11 (initial phase)
Changchun Railway Station (North) — Dongdaqiao Bridge 7 May 2012 3.3 km (2.05 mi) 3 Northern extension
Gongping Road 17 December 2012 Infill station 1

Stations

Station name Connections Distance
km
Location
English Chinese
Changchun Railway Station (North) 长春站北  CJ ~ JH   CB ~ BA  CCT
 1 
0.00 0.00 Kuancheng
Beiyatai Street 北亚泰大街 1.25 1.25
Puppet Regime Palace Museum 伪满皇宫 1.60 2.85
Dongdaqiao Bridge 东大桥 0.60 3.45 Nanguan
Dongxin Road 东新路 1.25 4.70 Erdao
Jilin Avenue 吉林大路  2  1.25 5.95
Gongping Road 公平路 1.00 6.95
Haikou Road 海口路 0.95 7.90
Pudong Road 浦东路 0.75 8.65
Weihai Road 威海路 0.70 9.35
Beihai Road 北海路 0.95 10.30
Vocational Institute of Technology 职业学院  3  1.05 11.35
Shirong Road 世荣路 0.80 12.15 Nanguan
South Ring Road 南环城路 0.90 13.05
Yisheng Street 宜盛街 1.15 14.20
Tiangong Road 天工路 1.30 15.50
    gollark: <@200673418457251840> No idea, never checked.
    gollark: We should switch to SoaS (Stuff on a Screen), much easier.
    gollark: ... you want me to rebrand potatOS as not an OS? Hmm.
    gollark: <@114827439070248961> ... what for?
    gollark: It just randomizes 1 in 10 key events.

    See also

    • Changchun Subway

    References

    1. "轻轨4号线3日起试运营 全程16.33公里". 2013-02-05.
    2. "长春轻轨4号线 9月末或10月初开始售票运行". 中国吉林网. Archived from the original on 2012-12-26. Retrieved 2012-10-04.
    3. Moore, Craig (September 2017). "Urban Rail in Changchun" (PDF). Urban Rail.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.