Indore–Dahod line
The Indore - Dahod railway line of the Western Railway Zone is an under constrution public transit system in the state of Madhya Pradesh and Gujarat. It connects Indore with Dahod on Mathura–Vadodara section. This line will reduce the distance between Indore and Dahod by 100 km.[1][2][3]
Indore–Dahod line | |
---|---|
Overview | |
System | Western Railway |
Status | Particailly Operational |
Locale | Madhya Pradesh & Gujarat |
Termini | Indore Junction Dahod |
Stations | 9 |
Operation | |
Owner | Indian Railway |
Operator(s) | Western Railway (WR) |
Character | At Grade |
Depot(s) | Indore Junction |
Technical | |
Track length | 204.76 km (127 mi) |
Number of tracks | 2 |
Track gauge | 1,676 mm (5 ft 6 in) Broad gauge |
Electrification | Yes |
Operating speed | 100 km/h (62 mph) |
History
The Project was allocated in 2008 but the work on the line started very late has 8 tunnels to be built. The later number of tunnels was reduced to three as of April 2019.[4][5][6]
The cost of the Indore-Dahod railway line is 1643 crores this may increase as per requirements as Railways have set a targeted to complete the Indore - Dahod Line project by 2022 as of now 11 years had passed 50 percent work of the work has not been completed.[7][8][9]
Route and halts
Indore–Dahod line | |||
---|---|---|---|
# | Station Name | Station Code | Connections |
1 | Indore Junction | INDB | Indore–Gwalior line |
2 | Saifee Nagar | SFNR | None |
3 | Lokmanya Nagar | LKMN | None |
4 | Rajendra Nagar | RJQ | None |
5 | Rau | RAU | Akola–Ratlam line |
5 | Tihi | TIHI | None |
6 | Pithampur | PTMPR | None |
7 | Sagore | SAGOR | None |
8 | Gunawad | GUNWD | None |
9 | Dhar | DHAR | Chhota Udaipur–Dhar line |
10 | Sardarpur | SRDPR | None |
11 | Jhabua | JHBUA | None |
12 | Pitol | PITOL | None |
13 | Katwara | KTWRA | None |
14 | Dahod | DHD | Mathura–Vadodara section |
gollark: publish/subscribe.
gollark: I think mostly you'll just wait on database access and stuff.
gollark: Quite a lot of the time, though, you want a working prototype and care about speed less.
gollark: That too.
gollark: Well, on big projects, yes.
See also
- Manmad–Indore line
- Western Railway
- Indore Junction railway station
- Mathura–Vadodara section
- Chhota Udaipur–Dhar line
References
- "Budget 2020: MP gets 5 railway projects worth Rs 710 cr". freepressjournal.in. Retrieved 27 March 2020.
- "Nod to Indore-Manmad rail line, solar projects at Mandideep & Pithampur | Bhopal News". Times of India. Retrieved 27 March 2020.
- "Indore Dahod Rail Project : Western Railway has made significant changes in the project and now three tunnels will be built, saving 750 crores". naidunia.com. Retrieved 27 March 2020.
- "Transportation of goods: Transportation cost of goods through Indore-Tihi railway line to cut | Indore News". Times of India. Retrieved 27 March 2020.
- "205 km new rail line between Indore and Budni to connect backward areas | Indore News". Times of India. Retrieved 27 March 2020.
- "Indore-Dahod railway line yet to take off - indore". Hindustan Times. Retrieved 27 March 2020.
- "indore-tihi: Indore-Tihi railway line to start soon | Indore News". Times of India. Retrieved 27 March 2020.
- "Indore-Mhow rail line staged a protest at Indore railway station | Indore News". Times of India. Retrieved 27 March 2020.
- "Indore-Tihi rail line: Indore-Tihi rail line set to be operational from February | Indore News". Times of India. Retrieved 27 March 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.