Great Orme Tramway

The Great Orme Tramway (Welsh: Tramffordd y Gogarth) is a cable-hauled 3 ft 6 in (1,067 mm) gauge tramway in Llandudno in north Wales. Open seasonally from late March to late October, it takes over 200,000 passengers each year from Llandudno Victoria Station to just below the summit of the Great Orme headland. From 1932 onwards it was known as the Great Orme Railway, reverting to its original name in 1977.[2][3]

Great Orme Tramway
Overview
TypeFunicular
StatusOperational
LocaleLlandudno, Wales
Coordinates53.3321°N 3.8544°W / 53.3321; -3.8544
Stations3 open + 3 disused[1]:9
Operation
Opened1902
Operator(s)Conwy County Borough Council
Depot(s)Halfway Station depot
Technical
Number of tracksSingle track with passing loop
Track gauge3 ft 6 in (1,067 mm)
Operating speed5 mph (8 km/h)
running speed[1]:9
Route map
Summit Complex
passing loop
St Tudno's Road
Halfway
(interchange)
interlaced track
passing loop
Old Road (street running)
Victoria

It is Great Britain's only remaining cable-operated street tramway, and one of only a few surviving in the world, and it is owned by Conwy County Borough Council. The line comprises two sections, where each section is an independent funicular and passengers change cars at the halfway station. Whilst the upper section runs on its own right of way and is very similar to many other funicular lines, the lower section is an unusual street-running funicular.

Whilst the street running section resembles the better-known San Francisco cable cars, its operation is quite different in that it adheres to the funicular principle where the cars are permanently fixed to the cable and are stopped and started by stopping and starting the cable, unlike San Francisco where cars attach to, and detach from, a continuously running cable. As such, this section's closest relatives are Lisbon’s Glória, Bica, and Lavra street funiculars.

History

Tram 7 in 1968, carrying the Great Orme Railway livery and name of that time

Authority to build the tramway was granted by the Great Orme Tramways Act of 1898, and construction started in 1901. The tramway was opened in its two stages: the lower section on 31 July 1902 and the upper on 8 July 1903. The original power house, at the Halfway station between the lower and upper sections, was equipped with winding gear powered by steam from coke-fired boilers. Communication between the power house and the tram cars was provided by a telegraph system, operating over an overhead wire and trolley poles on the cars.[4][5]

The line was initially provided with seven cars, three freight cars numbered 1 to 3 and four passenger cars numbered 4 to 7. The passenger cars were each named after a local Welsh Christian saint and are still in service. The freight cars were for the carriage of goods and parcels, as stipulated in the tramway's original Parliamentary Order, but were withdrawn from service by 1911. The freight vans were also used to carry coffins for burial at the church on Great Orme. There were two methods of using the freight tramcars - they could be placed on the track ahead of a passenger tram, and propelled up the incline, or the cable could be detached from a passenger tram and attached instead to a freight tram, which then operated alone up the incline. All seven trams were fitted with couplings, which would have allowed the passenger trams to tow the freight trams, but there is no evidence that this type of operation ever actually occurred.[4][5]

The line suffered a serious accident and consequent financial difficulties in the 1930s, resulting in its sale in 1935 to the Great Orme Railway company. In 1949, Llandudno Urban District Council exercised its power, granted by the original act of parliament, to buy the line. Ownership of the line has since passed to Aberconwy Borough Council and then Conwy County Borough Council as a result of local government reorganisations.[2][5]

The original steam power was replaced in 1958 by electrically powered apparatus. In 1977, the line reverted to the Great Orme Tramway name that it had carried prior to its sale in 1935. Between 1999 and 2001, the line received £1 million of funding from the European Union, together with a further £1 million from the Heritage Lottery Fund and matching funds from its owner. As a result, in 2001, the entire Halfway station, its control room and its power plant were completely rebuilt and re-equipped. At the same time the overhead wire telegraph communication system was replaced with an induction-loop system.[2][5]

Operation

Route

The tramway has three main stops, a lower station which is called Llandudno Victoria after the hotel that formerly occupied the station site, the aptly named Halfway stop, and the Great Orme Summit stop. Passengers must change trams at the Halfway stop as upper and lower funicular sections are physically separate. The two sections operate independently, with two cars on each section. As one car is ascending, the other is descending, and they pass at passing loops situated in the middle of each section.[6]

The lower section is built in or alongside the public road and has gradients as steep as 1 in 3.8 (26.15%). The track throughout this section is laid as grooved rail within the road surface, and the cable lies below the road surface in a conduit between the rails. The bottom half of the section is single-track, but above the passing loop it has interlaced double track. By contrast, the upper section is less steep, with a maximum gradient of 1 in 10 (10%). The track is laid on sleepers and ballast, and the cable runs between the rails as is normal for most funiculars. The track is single apart from a short double track passing loop equipped with points actuated by the flanges of the passing cars. The rails are interrupted to accommodate the cable.[6]

Stations

One of the two engineering bays in the Halfway maintenance depot.

The Great Orme Tramway refers to all its fixed boarding and alighting locations as stations (not tram stops).[1][5][7] Three are currently in regular use, named Victoria Station, Halfway Station, and Summit Station.[1]:9 Three others, all request stops, are currently disused, namely Black Gate, Ty'n-y-Coed, and Killen's Hill stations.[1]:9

As well as being the point at which passengers change cars, the Halfway stop is also the control centre for the line. The electric motors which drive the cables that propel the cars are located in the central building of the stop, as are the winchmen who control them. This in turn leads to a further difference between the two sections. With the drive at the top of the lower section, there are only two haulage cables, from the Halfway stop to each car. As the upper section has its drive at the bottom of the section, a third cable is needed that connects the two cars via a sheave at the Summit stop.[7]

Halfway stop is also the location of the engineering depot, with access for trams from both upper and lower sections. Engineers have depot facilities for inspection and maintenance of the trams, including inspection pits.[1]:10 Although there is no public access to the depot, some parts of both the depot and the control room can be viewed by passengers through internal glazing in the viewing area, whilst interchanging between upper and lower sections.[1]:5

Communication

The line is controlled by a pair of winchmen, one per section and located in the Halfway power house, who control the speed and direction of rotation of the cable, and hence the cars attached to the cable. They are assisted by attendants on each car, who are in communication with the winchmen using an induction-loop radio system. Prior to the introduction of this radio system, messages were passed using an overhead wire telegraph and trolley poles on the tram cars. The overhead wire has since been removed, but the cars still carry the trolley poles.[5][7]

Fleet

The tramway still operates entirely with original vehicles, dating from the line's opening.

Tram number Tram name Type Entered Service Notes
1 No name 16'7" four-wheel freight tram car 1902 Withdrawn in (or by) 1911
2 No name 16'7" four-wheel freight tram car 1902 Withdrawn in (or by) 1911
3 No name 16'7" four-wheel freight tram car 1902 Withdrawn in (or by) 1911
4 St Tudno 37' bogie passenger tram car 1902 Still in service
5 St Silio 37' bogie passenger tram car 1902 Still in service
6 St Seiriol 37' bogie passenger tram car 1902 Still in service
7 St Trillo 37' bogie passenger tram car 1902 Still in service

Incidents

  • The tramway suffered its only fatal accident on 23 August 1932, when a drawbar failure on car number 4 caused a derailment and subsequent collision with a wall, killing the tram's driver and a 12-year-old passenger; ten further passengers suffered serious injuries. The failure was apparently caused by the drawbar's manufacture from a steel alloy which was not suited to this type of use; a 1933 report also highlighted the fact that the emergency brakes did not function at the time of the crash. Following the accident the tramway was closed until 1934 while safety improvements were carried out, and reopened under new ownership after the original company was wound up.[8]
  • On Sunday 30 April 2000, on the day of the Llandudno Transport Festival, 37 passengers were injured with 17 requiring hospital treatment following a head-on collision between trams 6 and 7 on the passing loop of the upper section. The cause of the accident, described as the most serious since the opening in 1902, was initially thought to be a points problem.[9][10] The investigation by Her Majesty’s Railway Inspectorate concluded that the two persons responsible to survey the position of the point did not notice the incorrect position because their training had been inadequate.
  • Shortly after midday on 15 September 2009 two trams on the upper section collided at the passing loop above Halfway station. No serious injuries were reported, but both the Rail Accident Investigation Branch and the owners and operators, Conwy County Borough Council, launched investigations. The RAIB published their report in 2010. The report concluded that the forces of wheels in the upper bogie of car 6 could move the point into the wrong position and this made the lower bogie run on the track of car 7. Wear of the rails and the point mechanism had allowed this result.[6]

A selection of views of the line, from lower station to summit:

gollark: Is it possible to make one with all the lines the same length or whatever?
gollark: Hmm, perhaps.
gollark: It's very subjective but I'd like a version which is nice and squarey.
gollark: I wouldn't actually need decoding in this case.
gollark: I was looking for a JS version but a Python one should be portable.

See also

References

Inline citations
  1. Firbank, Johanna (2002). Great Orme Tramway Centenary Guide (First ed.). Conwy County Borough Council. ISBN 1-84047-007-0.
  2. "History". Great Orme Tramway. Archived from the original on 14 November 2016. Retrieved 14 November 2016.
  3. "New Great Orme tram drivers take to the controls". bbc.co.uk. BBC. Retrieved 3 May 2017.
  4. Turner, Keith (2003). The Great Orme Tramway – over a century of service. Llanrwst: Gwasg Carreg Gwalch. pp. 65–68. ISBN 978-0-86381-817-2.
  5. Noel Walley. "Llandudno Great Orme Tramway Conwy North Wales UK". Greatorme.org.uk. Archived from the original on 25 June 2013. Retrieved 13 June 2013.
  6. "Collision on the Great Orme Tramway, 15 September 2009" (PDF). Rail Accident Investigation Branch. 16 October 2010. Archived (PDF) from the original on 11 November 2013. Retrieved 11 November 2013.
  7. "How it works". Great Orme Tramway. Archived from the original on 14 November 2016. Retrieved 14 November 2016.
  8. Noel Walley. "Significant Events in the History of the Line with brief notes on its construction, equipment and operation". Greatorme.org.uk. Archived from the original on 18 September 2015. Retrieved 27 July 2015.
  9. "Tram collision injures 17 passengers". BBC News Online. BBC. 30 April 2000. Retrieved 15 September 2009.
  10. "Accident on the Great Orme Tramway - report by John Murray". North Wales Railway Noticeboard. Charlie Hulme. 1 May 2000. Retrieved 15 September 2009.
Other references
  1. J. I. C. Boyd; Narrow Gauge Railways in North Caernarvonshire Volume 3 Part 7 The Great Orme Tramway and Tramroad The Oakwood Press, 1986
  2. R.C. Anderson, A.M.Inst.T.; The Great Orme Railway Light Railway Transport League (later edition called The Great Orme Tramway).
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.