Fahrettin Altay—Evka 3 Line
The Fahrettin Altay—Evka 3 Line, unofficially referred to as M1, is a 20.1 km long route of the Izmir Metro. It is the only operating line of the İzmir Metro system, although the construction of two new lines is expected to begin in 2018.[1] The line originally opened on 22 May 2000 and operated between Bornova and Üçyol. Between 2012 and 2014 the line was gradually expanded to its current route. The Fahrettin Altay—Evka 3 Line is the fourth rapid transit line to open in Turkey, after the M1 (1989) in Istanbul and Ankaray (1996) and the M1 (1997) in Ankara.
Fahrettin Altay—Evka 3 Line | |
---|---|
A westbound train after departing Bölge station. | |
Overview | |
Native name | Fahrettin Altay—Evka 3 Hattı |
Type | Rapid transit |
System | İzmir Metro |
Status | Operating |
Locale | İzmir, Turkey |
Termini | Fahrettin Altay, Balçova (West) Evka 3, Bornova (East) |
Stations | 17 |
Services |
|
Daily ridership | 287,671 |
Line number | 1 |
Operation | |
Commenced | 1995 |
Opened | 22 May 2000 |
Completed | 1999 |
Depot(s) | Halkapınar depot |
Rolling stock |
|
Technical | |
Number of tracks | Double track, drives on the right |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Loading gauge | UIC |
Minimum radius | 125 metres (410 ft) |
Electrification | 750V DC third rail, bottom contact |
Operating speed | 80 km/h (50 mph) |
Stations
Station | Opening | Structure Construction | Structure Platform | Tracks |
---|---|---|---|---|
Fahrettin Altay | 26 July 2014 | Cut-and-Cover Tunnel | 2 Side Platforms | 2 |
Poligon | 26 July 2014 | Cut-and-Cover Tunnel | 2 Side Platforms | 2 |
Göztepe | 25 March 2014 | Deep Tunnel | 2 Side Platforms | 2 |
Hatay | 29 December 2012 | Cut-and-Cover Tunnel | 2 Side Platforms | 2 |
İzmirspor | 29 December 2012 | Cut-and-Cover Tunnel | 2 Side Platforms | 2 |
Üçyol | 22 May 2000 | Deep Tunnel | 2 Side Platforms | 2 |
Konak | 22 May 2000 | Cut-and-Cover Tunnel | 1 Island Platform | 2 |
Çankaya | 22 May 2000 | Cut-and-Cover Tunnel | 1 Island Platform | 2 |
Basmane | 22 May 2000 | Cut-and-Cover Tunnel | 1 Island Platform | 2 |
Hilal | 22 May 2000 | Viaduct | 2 Side Platforms | 2 |
Halkapınar | 22 May 2000 | Grade | 2 Island Platforms | 3 |
Stadyum | 22 May 2000 | Viaduct | 2 Side Platforms | 2 |
Sanayi | 22 May 2000 | Grade | 1 Island Platform | 2 |
Bölge | 22 May 2000 | Grade | 1 Island Platform | 2 |
Bornova | 22 May 2000 | Splitting Tunnel | 1 Island Platform | 2 |
Ege Üniversitesi | 30 March 2012 | Cut-and-Cover Tunnel | 2 Side Platforms | 2 |
Evka 3 | 30 March 2012 | Cut-and-Cover Tunnel | 2 Side Platforms | 2 |
Connections
At Basmane station, there are connections available to Turkish State Railways.
gollark: I also have DDR4-3000 (8GB), because it was said that Ryzen worked better with fast memory.
gollark: How do you have such a ridiculously large amount of money?
gollark: I mean, it's only £600 if you include the price of the SSD (I bought it back when they were £80 or so) and monitor.
gollark: Ryzen R3 1200 and GTX 1050.
gollark: £600 or so minimum-cost one.
References
- "Izmir Metro" (PDF). 2009. Archived from the original (PDF) on 5 July 2010. Retrieved 12 June 2010.
See also
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.