The proposed Crows Nest Wind Farm, will be located in south-eastern Queensland, 40 kilometres north of Toowoomba. It initially was to have an installed generating capacity of 124 MW that would produce intermittent electricity that could power some 47,000 homes during periods of high wind. It is expected that the wind farm will create 460 manufacturing and construction jobs and a further 15 full-time maintenance jobs in Crows Nest. The Crows Nest location on the western edge of the Darling Downs, offers some of the best average wind speeds available in Queensland, and the project will provide additional security of electricity supply in this fast-growing area.[1]

Crows Nest Wind Farm
CountryAustralia
LocationCrows Nest, Queensland
Coordinates27°13′51″S 151°57′34″E
StatusApproved
Construction cost$270,000,000
Owner(s)AGL Energy
Power generation
Nameplate capacity200 MW

The project was acquired by AGL Energy in 2009 after purchasing it and another wind farm at Barn Hill in South Australia from Transfield Services.[2] In June 2009, AGL was allowed to increase the number of turbines by 20 units and therefore the output from 124 MW to 200 MW. The cost of the project is now expecting to be A$270 million.[3]

Objections

Residents of Crows Nest Shire formed a "No Wind Farm" group which objected to the proposal. The activists contended that turbine blades would cause light flicker as they passed the sun, turbines would cause noise, devalue land, be a detriment to fauna and visual appeal of the area and were contrary to the council's town plan. They also argued the green credentials of wind farms were a myth because large amounts of coal-fired energy was needed to power up generators to full capacity after a drop in wind speed. After drawn-out legal proceedings and mediation between the parties, the objections were progressively dropped.[4]

gollark: I see.
gollark: What's it the factorial of?
gollark: What overflow would have caused *that*?
gollark: Infiltrate better then?
gollark: Then, steal the design for ARM9 cores, and run that on your FPGA.

See also

  • List of active power stations in Queensland

References

  1. "Crows Nest Wind Farm receives Development Consent" (PDF). Archived from the original (PDF) on 22 July 2008. Retrieved 26 April 2008.
  2. "AGL buys Transfield wind farm projects". Brisbane Times. Fairfax Digital. 18 June 2009. Retrieved 21 May 2010.
  3. Stuart Cumming (2 February 2011). "Crows Nest wind farm to go ahead". The Chronicle. Toowoomba Newspapers Pty Ltd. Retrieved 28 June 2011.
  4. (14 December 2006). Opponents vow to fight wind farm. The Chronicle. Toowoomba Newspapers Pty Ltd.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.