The Swanbank Power Stations are located in Swanbank within South East Queensland, Australia. The original power station was coal fired, but the site has since moved to gas. By 2007 the site had consisted of the highly efficient 385 megawatts (516,000 hp) gas-fired Swanbank E Power Station and the smaller 28 megawatts (38,000 hp) gas-fired Swanbank C Power Station.

Swanbank Power Station
Swanbank Power Station
CountryAustralia
LocationIpswich, Queensland
Coordinates27.659783°S 152.813446°E / -27.659783; 152.813446
StatusOperational
Commission date
  • 1967 (Swanbank A)
  • 1971 (Swanbank B)
  • 1969 (Swanbank C)
  • 2000 (Swanbank D)
  • 2002 (Swanbank E)
Decommission date
  • 2005 (Swanbank A)
  • 2012 (Swanbank B)
  • ???? (Swanbank D)
Owner(s)CleanCo Queensland
Thermal power station
Primary fuelNatural gas
Secondary fuelLandfill gas
Combined cycle?Yes
Power generation
Units operational
  • 28 MW (38,000 hp) (Swanbank C)
  • 385 MW (516,000 hp) (Swanbank E)
Make and model
Nameplate capacity385 MW
External links
CommonsRelated media on Commons

Components

Swanbank A was commissioned in 1967 and decommissioned in August 2005. It had six 66 megawatts (89,000 hp) steam turbines, and was powered by coal. The three 133-metre (436 ft) high, 7,000-tonne (6,900-long-ton; 7,700-short-ton) concrete smoke stacks were collapsed on 20 August 2006. All three were collapsed on the same day with a 10 second delay between each stack. The deconstruction and demolition project, undertaken by Trio Industries, was scheduled to be completed in February 2007.

Swanbank B was commissioned in 1971 with four 120 megawatts (160,000 hp) steam turbines, powered by coal. Four units of Swanbank B were decommissioned in April 2010, June 2010, 2011, and May 2012, due to the plant reaching the end of its operational life.[1] The coal for Swanbank B came from coalfields in South-East Queensland, including New Acland Mine, by road. Water is supplied from Lake Moogerah and the Western Corridor Recycled Water Scheme began to supply the power station with water in August 2007.[2]

Swanbank C was a small gas turbine generating plant, rated at 28 megawatts (38,000 hp). It had two Rolls-Royce Avon gas generators discharging into a power turbine which drove the generator. Middle Ridge Power Station was a similar design, with four gas generators discharging into two power turbines, one on each end of the 56 megawatts (75,000 hp) electrical generator. It was commissioned in 1969.[3]

Swanbank D was a small open cycle gas turbine. Delivering only 37 megawatts (50,000 hp), it was commissioned in 2000 but only ran for a few years.[4]

The much larger and more efficient Swanbank E was commissioned in 2002 with a single 385 megawatts (516,000 hp) combined cycle gas turbine.[5] The gas turbine of Swanbank E was the largest of its type at the time of its commissioning.[6]

World record

In 2011, Swanbank E set a world record for the continuous operation of an Alstom GT26 gas turbine.[6] It had been running for 254 days when it was shut down on 9 July 2011 for planned maintenance.

Protest

On 11 July 2008, four activists from Greenpeace Australia Pacific occupied the top of a 140-metre high Swanbank B smokestack for 33 hours. They descended over two hours on the next day, leaving a message for Australia's leaders – "Go Solar"- painted on the side of the smoke stack.[7]

gollark: It should probably accept 2-tuples instead.
gollark: <@136969229730709504> I think this is an XY problem thing here. What do you actually want to do?
gollark: Instead of reopening it, I mean.
gollark: You can just reload it.
gollark: In the modern trendy world of JS you can have it set up so that it just recompiles whenever you edit a file, and usually quite fast.

See also

  • List of active power stations in Queensland

References

  1. "Stanwell Corporation – Final coal delivered to Swanbank B Power Station". Power Engineering. PennWell Corporation. 7 May 2012. Retrieved 22 May 2012.
  2. "Bundamba plant begins to produce recycled water". WaterWorld. PennWell Corporation. 31 August 2007. Retrieved 4 July 2014.
  3. "Electricity Industry Chronology". Chronology of Engineering works in Queensland. Engineers Australia. Retrieved 2 March 2014.
  4. "20pc growth in Queensland generation capacity since start of NEM". Electricity Week. EWN Publishing. 6 March 2002. Retrieved 2 March 2014.
  5. "Swanbank E Power Station" (PDF). Fact Sheet. Stanwell. September 2013. Retrieved 28 April 2014.
  6. "Swanbank E sets world record for continuous operation" (PDF). Media Release. Stanwell Corporation. 14 July 2011. Retrieved 7 September 2011.
  7. "Greenpeace protesters scale Swanbank smoke stacks".

YouTube videos of chimney demolition