Chichester Canal

The Chichester Canal is a navigable canal in England. It runs 4.5 miles (7.2 km) from the sea at Birdham on Chichester Harbour to Chichester through two locks. The canal (originally part of the Portsmouth and Arundel Canal) was opened in 1822 having taken three years to build. When completed the canal could take ships of up to 100 tons. Dimensions were limited to 85 feet (26 m) long 18 feet (5.5 m) wide and a draft of up to 7 feet (2.1 m).[1]

Chichester Canal
A map of the planned route of the canal from 1815
Specifications
Maximum boat length85 ft 0 in (25.91 m)
Maximum boat beam18 ft 0 in (5.49 m)
Locks2
Statuspart navigable
Navigation authorityWest Sussex County Council
History
Date of act1819
Date of first use1822
Date closed1928
Date restored1984
Geography
Start pointChichester
End pointChichester Harbour

History

Planning, construction and early operation

Chichester Canal by J.M.W. Turner
Chichester Canal
Chichester Basin
A27 Chichester Bypass
Portsmouth and Arundel Canal
End of navigable section
B2201 Crosbie causeway
A286 Birdham causeway
Weir (was Casher lock)
End of un-navigable section
Moorings
Salterns sea lock
Chichester Harbour

Proposals for a canal linking Chichester directly to the sea go back as least as far as 1585 when an act of parliament was passed allowing a cut linking Chichester with the sea.[2] Further proposals were made in the early 19th century, with schemes being proposed in 1801, 1802, 1803 and 1811, but none of these came to pass and as a result the first link to the sea was via a branch of the Portsmouth and Arundel Canal opened in 1822.[2] In 1817 it had been decided that the section between Chichester and Chichester Harbour, unlike the rest of the canal, would be built large enough to carry boats of 100 tons.[2] Putting this into practice required a new act of parliament which was obtained in 1819.[3] In the same year the construction of the Chichester branch began.[4] During the construction of the basin a hoard of 300 Denarii was found.[5] The section of the canal that would become the Chichester Canal was formally opened on 9 April 1822[6]

The Portsmouth and Arundel Canal was conceived as part of a bigger plan to provide a secure inland canal route from London to Portsmouth, but by the time the route was completed, the war with France had ended. With the reason for its construction removed, the canal was not a commercial success, and apart from the Chichester section, it had fallen into disuse by 1847.[7]

Under the ownership of the Corporation of Chichester

The canal was transferred to the Corporation of Chichester in 1892.[8] In November of that year the City Surveyor gave a figure of £1000 to put the canal back into full working order. Work required included the repair of locks bridges and the removal of weeds and mud from the channel.[9] By 1898 only 704 tons of goods were carried and tolls for the year stood at £18.[10] The last recorded commercial traffic was in 1906 when a load of shingle was carried from Chichester Harbour to the basin at Southgate.[11] In the same year it was found that the swing bridges at Donnington and Birdham needed to be repaired or replaced. Westhampnett Rural District Council wanted to replace them with fixed bridges (which would have blocked the canal) but the Corporation of Chichester wanted to keep the canal open to traffic. By 1923 the Corporation appears to have accepted that there would be no further traffic and allowed the swing bridges to be replaced by fixed bridges.[9]

The canal survived until June 1928 before being formally abandoned.[11]

In 1932 the section of the canal between Cutfield Bridge and Salterns lock was reopened to allow yachts to be berthed there.[12] The open section was initially leased by Mr D S Vernon but in 1934 he transferred it to the Chichester Yacht Company.[13]

World War two

During World War 2 the canal was converted into an anti tank obstacle by the 4th infantry division as part of the preparations against a German invasion. These conversions included dismantling 4 swing bridges and building a dam above Cutfield bridge to raise the water level by 3 feet (0.91 m).[14] The level of the canal was raised using water diverted from the River Lavant.[13] The level of the canal proved hard to control and the changes in level caused some damage to the canal and a houseboat.[13] The arguments over who should pay for the damage lasted until June 1947.[15]

Post war

Southgate basin at the Chichester end of the canal in 2011

In 1953 the canal and surrounding lands were sold to West Sussex County Council for £7,500.[16] The County Council planned to use part of the canal land for road improvements but these never took place.[16] The section below Cutfield Bridge continued to be leased to the Chichester Yacht Company while the upper part of the canal was leased to Chichester Canal Angling Association.[16]

In 1994 the canal was used in an attempt to keep floodwaters away from Chichester.[17]

The canal is now undergoing restoration. As of 2009 the sea lock is in working order but the other lock is not.

In 2009 the restoration was halted due to the presence of water voles.[18]

Points of interest

gollark: Apiaristic "beeoids", is the entire database system arbitrary JSON files?
gollark: Too bad, I WILL ANYWAY.
gollark: <@!319753218592866315> Please make it. Time is running short.
gollark: I blame Macron.
gollark: Huh. It's... still broken?

See also

Bibliography

  • Green, Alan H.J (2006). The History of Chichester's Canal. Sussex Industrial Archaeology Society. ISBN 0-9512036-1-4.CS1 maint: ref=harv (link)
  • Hadfield, Charles (1969). The Canals of South and South East England. David and Charles. ISBN 0-7153-4693-8.CS1 maint: ref=harv (link)
  • Heneghan, F. D. (1958). The Chichester Canal. Chichester City Council. ASIN B000XCT5Z6.CS1 maint: ref=harv (link)
  • Vine, P.A.L (1985). West Sussex waterways. Middleton Press. ISBN 0-906520-24-X.CS1 maint: ref=harv (link)
  • Vine, P.A.L (2005). London's Lost Route to Portsmouth. Phillimore & Co. ISBN 1-86077-283-8.CS1 maint: ref=harv (link)

References

  1. Heneghan 1958, p. 15
  2. Henegan 1958, pp. 1–2
  3. Green 2006, p. 12
  4. Green 2006, p. 24
  5. Green 2006, p. 26
  6. Green 2006, p. 30
  7. Vine 1985
  8. Vine 2005, p. 153
  9. Henegan 1958, p. 19
  10. Vine 2005, p. 155
  11. Vine 2005, p. 161
  12. Hadfield 1969, p. 146
  13. Green 2006, p. 65
  14. Vine 2005, p. 163
  15. Green 2006, pp. 65–70
  16. Green 2006, pp. 73–74
  17. Chaudhary, Vivek (11 January 1994). "Sales boom helps trader overcome that sinking feeling". The Guardian. Manchester.
  18. "Voles Halt Chichester Restoration". Waterways (226): 32. Winter 2009.

Media related to Chichester Canal at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.