Changqing Road station

Changqing Road (simplified Chinese: 长清路; traditional Chinese: 長清路; pinyin: Chángqīng Lù) is an interchange station on Lines 7 and 13 of the Shanghai Metro. It opened on 5 December 2009 as a Line 7 station. With the opening of phases two and three of Line 13 on 30 December 2018, it became a virtual interchange station between Lines 7 and 13.[1] Passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer here to continue their journey.

Changqing Road

长清路
Line 7 platform
LocationPudong New Area, Shanghai
China
Coordinates31.1772°N 121.483°E / 31.1772; 121.483
Operated byShanghai No. 3 Metro Operation Co., Ltd. (Line 7)
SHanghai No. 2 Metro Operation Co., Ltd. (Line 13)
Line(s)
Platforms4
Connections
  • Bus routes 82, 83, 314, 338, 454, 572, 572区间, 604, 627, 734, 781, 786, 787, 818, 871, 974, 隧道一线, 隧道二线, 隧道七线, 隧道夜宵一线, 万周专线
Construction
Structure typeUnderground
History
Opened5 December 2009
Services
Preceding station   Shanghai Metro   Following station
toward Meilan Lake
Line 7
toward Huamu Road
toward Jinyun Road
Line 13
Line 13 platform

The station is located near the junction of Changqing Road and Yaohua Road, just outside the Shanghai Expo 2010 zone.

References

  1. Shanghai Shentong Metro Group Co., Ltd. (2018-12-28). 5号线南延伸和13号线二、三期12月30日起试运营. Shanghai Shentong Metro Group Co., Ltd. (in Chinese). Retrieved 2018-12-29.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.