Bukit Batok MRT station
Bukit Batok MRT station is an above-ground Mass Rapid Transit (MRT) station on the North South Line in Bukit Batok, Singapore. Until the opening of the Woodlands Extension, the station was part of the Branch Line.
NS2
Bukit Batok 武吉巴督 புக்கிட் பாத்தோக் Bukit Batok | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | |||||||||||
Platform level of the Bukit Batok MRT station. | |||||||||||
Location | 10 Bukit Batok Central Singapore 659958 | ||||||||||
Coordinates | 1°20′57″N 103°44′59″E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bukit Batok Bus Interchange, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes (West Mall) | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | 10 March 1990 | ||||||||||
Electrified | Yes | ||||||||||
Previous names | Bukit Batok South | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Bukit Batok Bukit Batok station in Singapore |
Bukit Batok station is situated within the town centre of Bukit Batok New Town, next to Bukit Batok Bus Interchange.
Etymology
Bukit Batok MRT station is located within the planning area of Bukit Batok, hence its name. The word "bukit" means "hill" in Malay; "batok" could be the Javanese term for coconut, or a corruption of "batu" which means "granite" in Malay, or it could be derived from the Malay word for cough "batok".
During planning stages, the station was called "Bukit Batok South".
History
The station was opened on 10 March 1990 as part of the Branch Line, and was given the station number B1. When the Woodlands Extension opened in 1996, the station number was changed to N23, and continued to use it until it adopted its current station number NS2 in 2001.
Installation of half-height screen doors at the station started on 29 June 2010 and operations commenced on 31 August 2010 with Lakeside.
The last North South Line station installed with high-volume low-speed fans. With the beginning of operations on 30 November 2012 with Lakeside MRT, this marked the completion of all high-volume low-speed fan installations along the North South Line. This MRT station was nearest within Bukit Timah Area before Downtown Line opened.