Bucharest Ring Motorway

The Bucharest Ring Motorway (or the Bucharest Belt Motorway, Romanian: Autostrada Centura București), termed A0,[1] is a planned motorway ring around the city of Bucharest, the capital of Romania. It is intended to be the outer ring to the existing Bucharest Ring Road.

A0 motorway
Autostrada A0
Map of the A0 motorway, as of July 2019
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length100.8 km (62.6 mi)
50.4 km under construction
Major junctions
Beltway around Bucharest
 A1, A2, A3
DN1, DN2, DN3, DN4, DN5, DN6, DN7
Location
CountiesIlfov
Highway system
Motorways in Romania
A13A1

It is split into two sections: the South Ring Motorway and the North Ring Motorway. It will have a total distance of 100 km and will be a motorway connection between the existing A1, A2 and A3 motorways.[2]

Currently, construction contracts are signed for the southern half, while for the northern half three tenders were launched.

South segment

The South Ring Motorway (52 km) was tendered as a concession contract in December 2012, that was supposed to be awarded in November 2013.[3] Yet, a new tender was announced in July 2017, that shall be completed between the end of 2017 and the first half of 2018, with an estimated cost of 580 million euros.[4] Construction works should take three years and a half to complete. It will run through the south of Bucharest, along the route of the Pan-European Corridor IV.[5]

A tender for a segment of 17.5 km (15.5 km of the South section and 2.5 km of the North section), called lot 3, between the A1 motorway and the DN6 road was launched in July 2017 and awarded in April 2018, to the joint-venture Spedition UMB–Tehnostrade–Artera Proiect, with one year allowed for the design of the motorway and two and a half years for the construction works.[6] However, the bid was challenged and awarded to a new constructor, the Greek company Aktor, in October 2018.[7]

The rest of the South section was tendered on the same date as well, with both of the two bids awarded to the Turkish company Alsim Alarko: the contract for the segment of 16.3 km between the DN6 road and the CFR Line 902 (near Jilava), called lot 2, was signed in March 2019 and is due to be finished in 2022,[8] while the bid for the segment of 16.9 km between the CFR Line 902 and the A2 motorway, called lot 1, was under challenge procedures until July 2019,[9] with the contract being signed one month later.[10]

North segment

In June 2019, the 45 km of the Northern half were tendered for auction into three segments.[11]

Openings timeline

  • Two of the three segments of the South Ring are under construction and planned to be opened in 2022.

See also

References

  1. http://media.hotnews.ro/media_server1/image-2015-02-26-19492952-0-harta-proiectelor-rutiere-din-mpgt.jpg
  2. "Consultanţă pentru elaborarea documentaţiei de atribuire a viitoarelor contracte de concesiune pentru autostrada de centură București". CNADNR. 9 August 2007. Archived from the original on 2013-03-13. Retrieved 2013-03-02.
  3. "Şova: Tronsoanele de autostradă Comarnic-Braşov, Craiova-Piteşti şi centura de sud a Capitalei, gata până la alegerile din 2016". Mediafax. 12 May 2013.
  4. "O noua Centura a Capitalei – Autostrada de Centura (A0) Sud Bucuresti, scoasa la licitatie: 52 km, 580 milioane de euro, finalizare estimata dupa 2022". Hotnews. 6 July 2017.
  5. "Contract de concesiune de lucrari publice privind proiectarea, constructia, finantarea, operarea si intretinerea Autostrazii de Centura Sud a Municipiului Bucuresti (Km 52+770 – km 100+765) si operarea si intretinerea Autostrazii Bucuresti – Constanta si Autostrazii Bucuresti – Pitesti". CNADNR. 11 December 2012. Archived from the original on 2013-01-18. Retrieved 2013-03-02.
  6. https://monitorizari.hotnews.ro/stiri-infrastructura_articole-22417379-autostrada-centura-sud-capitalei-fost-desemnat-cstigatorul-pentru-constructia-unui-lot-17-5.htm
  7. "2. Austostrăzi în România. Licitaţii de execuţie lucrări active" (in Romanian). Asociaţia Pro Infrastructură. 31 December 2018. Retrieved 31 December 2018.
  8. "Primul contract pentru Autostrada de Centură (A0) a Capitalei s-a semnat sămbătă cu o companie din Turcia / 17 km, 160 mil. euro, 18 luni de licitație". Hotnews. 9 March 2019. Retrieved 3 May 2019.
  9. "2. Austostrăzi în România. Licitaţii de execuţie lucrări active" (in Romanian). Asociaţia Pro Infrastructură. 15 April 2019. Retrieved 3 May 2019.
  10. https://monitorizari.hotnews.ro/stiri-infrastructura_articole-23331536-harta-autostrada-centura-sud-a0-capitalei-are-acum-constructori-toata-lungimea-ultimul-tronson-fost-semnat-turcii-alsim-alarko-pentru-177-mil-euro.htm
  11. https://monitorizari.hotnews.ro/stiri-infrastructura_articole-23187649-fost-lansata-licitatia-pentru-trei-loturi-ale-autostrazii-centura-nord-capitalei-45-costuri-totale-2-18-miliarde-lei.htm

Periods of works

In May 2019 the northern portion was auctioned following the works to start on June 10, 2019. In August 2019 it was auctioned the motorway connection between the existing A1,there are currently no works on this portion.