The Bridgewater railway line is a former passenger railway service on the Adelaide to Wolseley line in the Adelaide Hills. It was served by TransAdelaide suburban services from Adelaide. On 26 July 1987, the service was curtailed to Belair. In 1995, the line was converted to standard gauge as part of the One Nation infrastructure program, disconnecting these stations from the broad gauge suburban railway system.
Bridgewater railway line | |
---|---|
Overview | |
Locale | Adelaide, South Australia |
Termini | Adelaide Bridgewater |
Stations |
|
Operation | |
Opened | 1883 |
Closed | 26 July 1987 |
Technical | |
Line length | 37.3 km (23.2 mi) |
Number of tracks | Quadruple Track to Goodwood Single Track to Belair (formerly double track) Closed from Belair (formerly single track) |
History
The line from Adelaide to Belair/Bridgewater was opened in 1883, and headed east from Belair parallel to the northern side of Belair National Park. It then turned south through the national park and then turned east again, where the National Park station used to be. It continued east past Long Gully and Nalawort to Upper Sturt, 28.9 km from Adelaide station. Five hundred metres later the track turned north east and continued to Mount Lofty, 31 km from Adelaide. After that it turned south and reached Heathfield (33 km), just after the line turned north east, passing Madurta, then Aldgate (34.5 km). The line continued east, passing Jibilla and Carripook and finally, the line terminated at Bridgewater, 37.3 km by rail from Adelaide.
The Bridgewater line had a fairly steep grade for most of the journey, sometimes resulting in derailments due to the tight bends. Services from Adelaide to Bridgewater usually took an average of one hour (stopping all stations), and about 50 minutes (express). Only one train every two hours operated during off-peak and weekends (most terminating at Belair) and no more than two trains per hour in either direction during peak-hours. This was because the line was single track (which is still the case today) with crossing loops located at Belair, Long Gully, Mount Lofty, Aldgate and Bridgewater.
When the more direct South Eastern Freeway opened in the late 1960s, patronage to Bridgewater declined heavily, as more people had access to cars and the car journey was much quicker and shorter. In 1985, the State Transport Authority sought to have the service withdrawn. The line had 12 services on weekdays, nine on Saturdays and five on Sundays.[1] On 26 July 1987, passenger services to Bridgewater were withdrawn, attributed to high cost of operation and low passenger numbers. All stations beyond Belair were closed, and all suburban trains now terminate at Belair.[2][3]
Services
Services on the Bridgewater line were mainly operated by Redhen railcars, with the 2000 class railcars occasionally used in its final years. On special occasions after 1987, such as the Oakbank Easter Racing Carnival held every Easter weekend at Oakbank, trains ran further east to terminate at Balhannah. However, this service ceased prior to the standard gauge conversion, due to the expense of operating the line..
Conversion
In 1995, the Adelaide to Wolseley line was converted from broad gauge (1600mm) to standard gauge (1435 mm) ruling out any restoration of local trains to Bridgewater or beyond, and it disconnected a number of the South Australian country broad gauge services from Adelaide. Between Goodwood and Belair, the former double track route became two parallel single lines, one broad gauge for Adelaide Metro suburban services, the other standard gauge freight services.[4] Along with this conversion, stations on the Belair line at Mile End Goods, Millswood, Hawthorn and Clapham closed. The other Belair line stations each had one platform closed. Millswood reopened on 12 October 2014 for a 12-month trial. The trial was successful, and the station was reopened permanently.
Stations
Bridgewater Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line guide
(Note: dates are those that are indicated in each individual article)
Station | Image | Opened | Additional information |
---|---|---|---|
Bridgewater | 1880s | Terminus 1857-1987; closed 23 September 1987 | |
Carripook | ? | Closed 23 September 1987 | |
Jibilla | ? | Originally named Halliday's Crossing; closed 23 September 1987 | |
Aldgate | 14 March 1883 | Closed 23 September 1987; crossing loop closed 1995 | |
Madurta | ? | Closed 23 September 1987 | |
Heathfield | ? | Closed 23 September 1987 | |
Mount Lofty | 1883 | Closed 23 September 1987; crossing loop closed 1995 | |
Upper Sturt | ? | Closed 23 September 1987 | |
Nalawort | 1920s | Closed 12 December 1945 | |
Long Gully | ? | Closed 23 September 1987; crossing loop closed 1995 | |
National Park | ? | Closed 23 September 1987 | |
Belair | 1883 | Terminus of the Belair line (1987–present); crossing loop closed 1995 |
References
- "South Australia" Railway Digest June 1985 page 193
- Annual report for year ended 30 June 1988 page 10 State Transit Authority
- Callaghan, WH (1992). The Overland Railway. Sydney: Australian Railway Historical Society. p. 217. ISBN 0 909650 29 2.
- D3 Wolseley to Mile End Archived 2 February 2015 at the Wayback Machine Australian Rail Track Corporation
- Universal Press (2002), UBD on Disk Adelaide