Željeznički prevoz Crne Gore
Željeznički prevoz Crne Gore (ŽPCG) (Cyrillic: Жељезнички превоз Црне Горе; English: Railway transport of Montenegro) is a joint-stock company that handles passenger transport within Montenegro, as well as operation of the Montenegrin rolling stock.
Government-owned | |
Industry | Rail Transport |
Founded | 2008 |
Headquarters | , |
Services | Rail Transport, Services |
Website | http://www.zcg-prevoz.me/ |
Rolling stock
Rolling stock of Railway transport of Montenegro consists of 39 locomotives and 5 EMUs:
Locomotives
Class | Image | Type | Top speed | Number | Built | Builder | Notes | |
---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||
JŽ 461 | Electric | 75 | 120 | 10 | 1971-1980 | Electroputere | Built for JŽ originally. | |
JŽ 661 | Diesel | 7 | EMD | Built for JŽ originally. 2 active, 2 are awaiting the general overhaul. |
- Diesel locomotives
- 4 locomotives of JŽ series 644
- 4 locomotives of JŽ series 642 (2 active)
- 2 locomotives of JŽ series 643
- 6 locomotives of JŽ series 744 (none of them is active)
Multiple units
Class | Image | Type | Top speed | Number | Built | Builder | Notes | |
---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||
JŽ 412/416 | EMU | 75 | 120 | 6 | 1980-1990 | RVR | 4 carriages. Built for JŽ originally. | |
Civity 6111 | EMU | 75 | 120 | 3 | 2013 | CAF | 3 carriages. Built for Podgorica-Nikšić-railway to cut travel times to 50 minutes. Train length 59,2 meters. Capacity 354 passengers.[1][2] |
Passenger cars
Railway transport of Montenegro also has following inventory of passenger cars:
- 31 passenger coaches (classes A, AB and B)
- 1 buffet car (class WR)
- 32 sleeping and couchette cars (classes AcBc, Ac, Bc and WLAB)
- 10 car-carrier wagons (class DDam)
Freight cars
Freight cars in inventory are as follows:
- 226 wagons (class G)
- 15 wagons (class K)
- 62 wagons (class R)
- 7 wagons (class S)
- 415 wagons (class E)
- 29 wagons (class F)
- 34 wagons (class Z)
- 33 wagons (class U)
- 3 wagons (class H)
gollark: For moving/scanning them I think what's been done is having a separate subnet with the cell you want and pushing to/from that.
gollark: You can partition them, not sure about manually.
gollark: Wait, you mean *manually* move them through those, or what?
gollark: Makes sense. Trouble is, though, even if I know which items should go where, how do I move them without huge buffers?
gollark: I have a bunch of pre-set-up storage barrel thingies and just want the stuff stored in cells to be efficiently stored.
References
- Vlada Crne Gore (The Government of Montenegro) - U junu 2013. godine Crna Gora dobiće tri nova elektromotorna voza (Serbian) Retrieved November 17, 2011
- ZCG Prevoz - Novosti - U julu 2013. godine, isporuka 3 nova EMV-a Retrieved November 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.