Wansbeck Railway

The Wansbeck Railway was a single track railway line in Northumberland, England, that ran from Morpeth to Reedsmouth, where it made a junction with the Border Counties Railway. Conceived as part of a through trunk route for the North British Railway, it never achieved its potential. It opened in stages from 1862 to 1865. Mineral traffic kept the line going; the population was sparse.

Wansbeck Railway
Overview
LocaleNorthumberland
Continues asNorth British Railway
Operation
Opened1862
Closed1966
Technical
Track gauge4 ft 8 12 in (1,435 mm)
Wansbeck Railway
Border Counties Railway
to Hexham │ to Riccarton Junction
Reedsmouth
to Broomhope Valley
Woodburn
Knowesgate
Brinkburn
Ewesley
Rothley
Scotsgap
Middleton North
Angerton
Meldon
Morpeth
crossing removed 1872
Morpeth
East Coast Main Line
to Newcastle │ to Berwick-upon-Tweed

In 1870 the Rothbury branch opened, from a junction on the Wansbeck line at Scotsgap.

The passenger train service was discontinued in 1952 and the line closed completely in 1966.

History

The first railways

In 1847 the Newcastle and Berwick Railway was opened. Conceived by George Hudson, the so-called Railway King, it was to form part of a through railway connection from Edinburgh to London. It later became part of the York, Newcastle and Berwick Railway.

It had a station at Morpeth, and people in towns not connected to a railway realised they were at a disadvantage against those who were: materials brought in cost more, and the transport to market of local manufactures also cost more.

The people of Rothbury felt this need particularly; the locality had long been prominent in the production of lime, used to improve acidic soil for agricultural purposes, and much in demand in the general area of Morpeth. in 1855 a railway linking Morpeth and Rothbury was proposed. It was to cost £95,000, but although finding a favourable reaction, the scheme failed to generate action and it was dropped.[1]

The Wansbeck Valley Railway

The Wansbeck Railway and the Rothbury Line

By 1858 the Border Counties Railway had opened the first section of its line, and this local railway close by encouraged further thoughts of a railway in the area, but not to Rothbury. This line would run west from Morpeth to Reedsmouth on the Border Counties line, there getting access to the intended rich coalfields of Plashetts. At Morpeth the new line would link with the Blyth and Tyne Railway, giving direct access to wharves on the North Sea, and over that line to Newcastle. The line would be 26 miles long. Moreover, the Border Counties Railway had the clear intention of linking with the Border Union Railway. The BUR was sponsored by the North British Railway, and when it opened its line became known as The Waverley Route. The Border Counties Railway was to link with this route at a place that became known as Riccarton.

Richard Hodgson, Chairman of the North British Railway was a member of the provisional committee, and this clearly shows the intention: the NBR was a link in a chain of railways between Edinburgh and London via Berwick, but it was dominated by the railways of George Hudson, who had shown himself to be ruthless in his dealings, and who had already tried to take over the NBR. The NBR had no running rights south of Berwick. If the NBR could get access to Newcastle over friendly railways—the Border Union, the Border Counties, the Wansbeck Valley, and the Blyth and Tyne—it would have much greater autonomy, and access to the important commercial centre at Newcastle.

The Wansbeck Valley committee changed the name to The Wansbeck Railway and submitted a Bill for its 28-mile line to the 1859 Parliamentary session. It was relatively uncontroversial, and obtained the Royal Assent on 8 August 1859; the capital was set at £120,000.[2][3] Working arrangement with the established railways were authorised by the Act, and the NBR and the Blyth and Tyne were permitted to subscribe up to £100,000 between them to the Wansbeck Railway.[1][4]

In fact the NBR subscribed £50,000; this was five-eighths of the Wansbeck's capital.[note 1][2]

Constructing the Wansbeck Railway

The authorising Act of the Wansbeck Railway permitted two connecting lines at Morpeth: to the North Eastern Railway station, or by-passing it to join the Blyth and Tyne line south-east of the NER station.[3] The controlling interest of the NBR and the lack of enthusiasm from the North Eastern Railway decided the Wansbeck Railway directors to make only the Blyth and Tyne connection. The Blyth and Tyne line ran eastwards from the NER station, so that the Wansbeck passenger and goods trains had to reverse to reach the Morpeth station.

The line was opened as far as Scotsgap on 23 July 1862; trains were worked by the North British Railway, although the stub of route was not physically connected to the NBR.

On 17 July 1862 the North British Company had obtained running powers to Newcastle over the line of the Newcastle and Carlisle Railway from Hexham, as part of a trade-off with the North Eastern Railway. This was a better route to Newcastle than over the Wansbeck line, and now the NBR lost interest in the Wansbeck Railway company. Running entirely through sparsely populated rural areas, and with the anticipated riches of the Plashetts coal field now being shown to be disappointing, the Wansbeck Railway was suddenly of doubtful commercial value. Selling out to the North British Railway seemed to be the only option.[1][2]

The North British Railway (Wansbeck and Finances) Act of 21 July 1863 empowered the amalgamation.[1][5] The NBR was already a majority shareholder, so there was no urgency in carrying out the merger, but it was accomplished sometime about March or April 1864. The connection with the Border Counties Railway at Reedsmouth had been planned to allow through running from Riccarton towards Morpeth, but that was now inappropriate, and the intended junction faced south instead. It is not clear whether Parliamentary sanction for this was obtained.

The line was opened as far as Knowesgate in October 1863. Reedsmouth station was opened for the Border Counties line in November 1864, but the Wansbeck line reached it on 1 May 1865: the Wansbeck Railway was now complete. The line had been built as single track, although land had been taken for double track.

There were three passenger trains each way on the line, with separate goods trains. The sparse population did not encourage a more intensive train service.

The line was worked by train staff and ticket; the block posts intermediately were Scotsgap and Woodburn. The system was converted to electric train token in 1890 - 1891.[1]

Catcleugh reservoir

Catcleugh Reservoir was constructed in the 1890s, and traffic for construction materials was carried on the Wansbeck line. A siding for the purpose was installed at Broomhill, near Woodburn, and there was a narrow gauge tramway from there to the dam.[2]

The Morpeth layout

Morpeth Railways before 1872

The track arrangements at Morpeth are described above; Wansbeck trains using Morpeth station (passenger and goods) required to reverse at Wansbeck Junction. There was a collision there on 15 September 1871, and the Inspecting Officer's report indicates the arrangement. A passenger train was to depart the Wansbeck line and be followed by a goods train. The goods train departed first, propelling its train, and stood on the Blyth and Tyne single line beyond the junction; the passenger train then left Morpeth, also propelling, and ran to the junction, to reverse there and run to the Wansbeck line. It would then be followed by the goods train.[note 2][6]

The Inspecting Officer stated that "a junction curve is about to be formed between the Wansbeck Valley and North-Eastern lines, which will enable the trains from the former to run direct into the Morpeth station of the latter line". This was done in 1872.

Hoole describes the Blyth and Tyne station at Morpeth as being separate from the North Eastern railway station, but they were immediately adjacent. When the new curve was built, the Wansbeck Railway and the North Eastern Railway each built part of it, installing the necessary signalling at their own end. "The NBR trains then deserted the B&T station for the North Eastern.[1][7] The earlier line direct to the B&TR was removed at the same time.

The Rothbury branch

The first proposed railway from Morpeth to the area had been intended to reach Rothbury. Now that was revived, as the Northumberland Central Railway, oblivious apparently to the difficult finances of the Wansbeck Railway. In fact it proposed a 50 mile line northwards from Scotsgap; the capital was to be £270,000.[2] The over-ambition of the scheme became obvious and it was cut back to a branch from Scotsgap to Rothbury. It opened on 1 November 1870. In fact Rothbury was a more important population centre than anywhere on the Reedsmouth line, and in the mid 1870s Rothbury came to be regarded as the main line, and Reedsmouth on the branch.[1]

The twentieth century

The line was simply a rural branch line in a thinly populated area, although cattle and some minerals were buoyant. In the first decades of the twentieth century heavy military traffic arose because of camps in the area as well as artillery ranges.

Following World War I the main line railways of Great Britain were "grouped" under the Railways Act 1921, and in 1923 the North British Railway was a constituent of the new London and North Eastern Railway (LNER). The railways were nationalised by Government in 1948, and the Wansbeck line became part of the Scottish Region of British Railways.[note 3]

The already limited traffic had been further reduced by motor lorries and buses since the 1930s and closure to passengers became inevitable; it took place in September 1952. A very limited goods service continued, but the line was closed completely in October 1966.[1]

Topography

The line climbed from Morpeth on a ruling gradient at 1 in 62 to a summit between Knowesgate and Woodburn, then descending at the same ruling gradient.[1]

Locations on the line after the spur direct to Morpeth station was opened were:[8]

Station Opened Closed Notes
Morpeth 1 March 1847 open North Eastern Railway station
Meldon 23 July 1862 15 September 1952
Angerton 23 July 1862 15 September 1952
Middleton 23 July 1862 15 September 1952 renamed Middleton North in 1923
Scots Gap 23 July 1862 15 September 1952 also possibly Scotch Gap; soon renamed Scotsgap; sometime later renamed Scotsgap Junction
Knowes Gate 7 July 1864 15 September 1952 renamed Knowesgate in 1908
Woodburn 1 May 1865 15 September 1952
Broomhope (Vickers Platform) uncertain private halt for workers at the Vickers armaments works
Parsons Platform in use in 1937 private halt for the Parsons Estate; also known as Ray House Platform and Rayfell Halt
Reedsmouth 1 February 1861 11 November 1963 junction station on the Border Counties Railway
gollark: YEŦ.
gollark: The autobias algorithm doesn't affect heads/tails.
gollark: ++choose heads tails
gollark: ÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆAAAAAA why won't my micro-SD-card reader work
gollark: My micro-SD-card reader isn't working.

References

  1. G W M Sewell, The North British Railway in Northumberland, Merlin Books Ltd, Braunton, 1991, ISBN 0-86303-613-9
  2. David Ross, The North British Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN 978 1 84033 647 4
  3. E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  4. John Thomas, The North British Railway, volume 1, David & Charles, Newton Abbot, 1969, ISBN 0 7153 4697 0
  5. C Hamilton Ellis, The North British Railway, Ian Allan Limited, Shepperton, 1955
  6. Lt-Col C S Hutchinson, Report dated 21 October 1871 on Accident on Blyth and Tyne Railway, accessible at
  7. K Hoole, A Regional History of the Railways of Great Britain: Volume 4: The North East, David and Charles (Publishers) Ltd, Dawlish, 1965
  8. M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002

Notes

  1. From Ross, page 52; in fact he refers to the Shareholders' Meeting which authorised that subscription, but as he also described the NBR share issue to pay for it, it seems certain that it happened.
  2. The actual accident took place because the passenger train was not properly coupled, and as it slowed at the junction while being propelled, the leading vehicles ran forward, colliding with the waiting goods train. The brakes on the brake van may not have been properly adjusted.
  3. Although it was in England, the existing mid-level management structure was the successor to the North British Railway section of the LNER, and management disruption was avoided by thius arrangement: Sewell, page 117.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.