Ukai Dam

The Ukai Dam, constructed across the Tapi River, is the second largest reservoir in Gujarat after the Sardar Sarovar. It is also known as Vallabh Sagar. Constructed in 1972, the dam is meant for irrigation, power generation and flood control. Having a catchment area of about 62,255 km2 and a water spread of about 52,000 hectares, its capacity is almost same as that of the Bhakra Nangal Dam. The site is located 94 km from Surat.

Ukai dam
Ukai Dam
Official nameUkai Water Resources Project
CountryIndia
LocationTapi district
Coordinates21°14′53.67″N 73°35′21.87″E
StatusOperational
Construction began1964
Opening date1972
Construction costRs 1389.6 Million
Dam and spillways
ImpoundsTapi River
Height345ft
Height (foundation)105.156 metres (340 ft)
Length4,927 metres (16,000 ft)
Spillways22, radial
Spillway typeOgee
Spillway capacity46,269 m3/s
Reservoir
CreatesVallabhsagar
Total capacity7,414 MCM
Active capacity6,730 MCM
Catchment area62,225 square kilometres (6.7×1011 sq ft)
Surface area612 square kilometres (6.6×109 sq ft)
Power Station
TypeConventional
Hydraulic head57 metres (190 ft) to 34 metres (110 ft)
Installed capacity300 MW
Website
Ukai dam

The storage capacity of Ukai dam is almost 46% of the total capacity of all the other existing dams in Gujarat if put together. Thus it can be concluded that the rest of the dams have as little as 0.1% average storage capacity. During the last 40 years, the actual irrigation potential is attained through all the major and medium water resources projects in the State, which comprises only 14 million hectares.[1]

The dam is an earth-cum-masonry dam. Its embankment wall is 4,927 m long. Its earth dam is 105.156 meters high, whereas the masonry dam is 68.68 meters high. The dam's left bank canal feeds water to an area of 1,522 km2. and its right canal provides water to 2,275 km2 of land.[2]

A fort built by the Gaekwad dynasty of Baroda was submerged in the reservoir. It can be spotted when water levels in the reservoir goes down.[3]

Ukai Hydro Power Station

There are four hydro turbine units, each of 75 MW with a total installed capacity of 300 MW. All the above units were made by BHEL. Commissioning dates of units 1 to 4 are: 8 July 1974, 13 December 1974, 22 April 1975 and 4 March 1976.

gollark: Since I have that flag for clearing blocks for unused mods on, I worry that this *may* accidentally have wiped every modded block.
gollark: Well, this is worrying. I restarted the server and it claims there are now only 4 mods installed.
gollark: There's a relevant xkcd for this.
gollark: OreDictionary makes them all intercompatible.
gollark: It's not actually a *compatibility* thing, really.

See also

References

  1. "Grave danger to Ukai dam: Gujarat govt". The Times of India. 8 August 2006. Retrieved 2 July 2010.
  2. "Water Resources Projects in the Tapi Basin". Archived from the original on 2016-04-13. Retrieved 2 February 2014.
  3. Bhatt, Himansshu (8 June 2016). "Submerged fort emerges from low water of Ukai reservoir | Surat News - Times of India". The Times of India. Retrieved 21 June 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.