USS Mohawk (1814)

USS Mohawk was a U.S. Navy frigate that fought on the Great Lakes during the War of 1812.

History
United States
Name: Mohawk
Namesake: The Mohawk Nation
Builder: Sackets Harbor yard of Henry Eckford
Laid down: 8 May 1814
Launched: 11 June 1814
Decommissioned: 1815
Fate: Sold ca. 1821
General characteristics
Type: frigate
Tonnage: 1,350
Length: 155 ft 0 in (47.24 m) between perpendiculars
Beam: 37 ft 6 in (11.43 m)
Draft: 15 ft 6 in (4.72 m)
Complement: 350 officers and enlisted men
Armament:
  • 26 × long 24–pounder guns
  • 16 × 32-pounder carronades

Mohawk, a 42-gun frigate, was laid down 8 May 1814 by shipbuilder Henry Eckford at Sackets Harbor, New York, launched on 11 June 1814, and acquired by the U.S. Navy and placed in service shortly thereafter with Captain Jacob Jones in command. She was built very quickly, having been on the ways only 34 days when she was launched, and was large for her class of warship.[1]

One of the large warships built under the direction of Commodore Isaac Chauncey for service against the British on Lake Ontario, Mohawk departed Sackets Harbor on 31 July 1814 in Chauncey’s squadron to challenge the British squadron of Captain Sir James Yeo, Royal Navy, for control of the lake during the crucial Niagara campaign of 1814. Sailing up to the head of the lake seeking the British squadron, the American ships found the enemy had retired to Kingston, Ontario.

In mid-July, Mohawk, in company with the full-rigged ships USS Superior, USS General Pike, and USS Madison, began a blockade of the Canadian port, remaining there for 45 days, providing valuable support for the army of Major General Jacob Brown in his campaign against the British posts along the Niagara frontier. On 21 September 1814 the frigate helped transport General Izard and 3,000 men from Sackets Harbor to the Genesee River and then resumed her blockade of Kingston until the end of the month. As winter began to close in, the American squadron retired to Sackets Harbor.

The War of 1812 ended 28 December 1814, long before the ice on the Great Lakes melted to allow further operations. Mohawk was then laid up in ordinary at Sackets Harbor.

Mohawk was reported unfit for repairs in 1821 and soon after sold and broken up.[2]

Notes

  1. Chapelle, p.294
  2. Chapelle, p. 546, says that she was broken up before 1921
gollark: I thought the workflow was more along the lines of "open app file, experience error, rightclick it in some specific menu, click "open" there (which works differently to opening it in all the other ways)", but sure.
gollark: Even on the platforms which don't REQUIRE signing (all except the new ARM ones?), they make it very difficult to run code they don't preapprove.
gollark: Yes, Apple do not like that.
gollark: Except when they're not.
gollark: From what I've heard, Apple are doing annoying things like requiring code signing.

References

  • This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
  • Howard Chapelle (1998-08-20). The History of the American Sailing Navy. Konecky & Konecky. ISBN 978-1-56852-222-7..
  • Jampoler, Andrew C. A. "Who Was Henry Eckford?" Naval History, December 2007, Pages 38–45.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.