Tennessee State Route 319

State Route 319 (SR 319) is a state highway in southeast Tennessee, starting at the intersection of SR 153 in Chattanooga, traveling to the area of Soddy-Daisy where it intersects with US 27, and the route comes to an end.

State Route 319
Route information
Maintained by TDOT
Length22.2 mi (35.7 km)
Major junctions
South end SR 153 / SR 58 at Chattanooga
  SR 58 in Chattanooga
North end US 27 at Soddy-Daisy
Location
CountiesHamilton
Highway system
SR 318SR 320

Route description

SR 319 begins on the northeast side of Chattanooga at SR 153 and SR 58. SR 319 has a short 1.8 mile concurrency/overlap with SR 58, to where SR 58 heads southwest and SR 319 turns north to have an interchange with Access Road and Hixson Pike after this intersection it enters Chattanooga's Hixson neighborhood. SR 319 then turns east and Junctions with SR 153 and turns north back along SR 153 and begins a very short 0.7 mile-long concurrency to an interchange where SR 153 heads northwest and SR 319 turns northeast and leaves Chattanooga/Hixson 3.7 miles from SR 153. It then enters the community of Middle Valley and then after 3.3 miles it leaves Middle Valley corporate limits and enters the city of Lakesite and in this area it turns back and forth from east to north. After it leaves Lakesite it passes the Sequoyah Nuclear Plant and turns northwest and enters Soddy-Daisy city limits to end at US 27/SR 29.

Junction list

The entire route is in Hamilton County.

LocationmikmDestinationsNotes
Chattanooga SR 153 / SR 58 north to I-75 Chattanooga Metropolitan Airport, HarrisonSouthern terminus; southern end of overlap with SR 58; SR 153 Exit 6
SR 58 south (Amnicola Highway) – Downtown ChattanoogaNorthern end overlap with SR 58; interchange; southern end of freeway (DuPont Parkway)
Tennessee RiverC.B. Robinson Bridge (DuPont Bridge)
ChattanoogaAccess Road; Hixson PikeInterchange
SR 153 south to I-75 Chattanooga Metropolitan Airport, Chickamauga DamSouthern end of overlap with SR 153; partial interchange; northern end of freeway (DuPont Parkway)
SR 153 north Falling Water, Soddy-DaisyNorthern end of overlap with SR 153
Soddy-Daisy US 27 (SR 29) Chattanooga, DaytonNorthern terminus; interchange
Dayton Pike – Soddy-Daisy
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
gollark: Unix philosophy actually bad in some ways, however.
gollark: Is this an attempt at using dictation or something?
gollark: * faster FP16 maths
gollark: Also, they predate any optimizations for machine learning like tensor cores or FP16 maths, so they'll be hilariously slow.
gollark: So some stuff won't work very well.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.