Tawa Reservoir

Tawa Reservoir is a reservoir on the Tawa River in central India. It is located in Itarsi of Hoshangabad District of Madhya Pradesh state, above Betul district. The reservoir was formed by the construction of the Tawa Dam, which began in 1958 and was completed in 1978. The dam provides for irrigation to several thousand hectares of farming land in Hoshangabad and Harda districts. It is also a big tourist attraction during the monsoon months. A cruise boat service has been started by the tourism department for visitors to the dam and reservoir. The dam was made by late Shri Vinay Kumar Diwan also known as Denva Ke Gandhi for his work for public welfare being public representative in the region for almost two decades serving as MLA.

Tawa Reservoir
Tawa Reservoir
Tawa Reservoir
LocationItarsi , Hoshangabad District, Madhya Pradesh
Coordinates22°33′44″N 77°58′38″E
Catchment area5,982.9 km2 (2,310.0 sq mi)
Basin countriesIndia
Surface area225 km2 (87 sq mi)
Tawa Dam
LocationTawanagar, Itarsi, Hoshangabad District, Madhya Pradesh
Construction began1956
Opening date1974
Operator(s)Water Resources Department, Madhya Pradesh

contact number 07572272803

police station = 07572272880
Dam and spillways
ImpoundsTawa River
Height57.91 m (190.0 ft)
Length1,815 m (5,955 ft)
Reservoir
CreatesTawa Reservoir

Tawa Reservoir forms the western boundary of Satpura National Park and Bori Wildlife Sanctuary.

Power plant details

It is a small hydropower plant which was set up on the left bank to utilize the tailrace water for irrigation purpose.

It is a private sector hydro-electric generation power plant. The two units of 2 × 6.75 MW were set up by LNJ Bhilwara group. Generated power supplied to HEG Plant Mandideep via MPPTCL Power Line.

The power production in this plant was started in 1998.

The construction of project was completed in record time of 22 months and at a cost of about 65 crore. Early and efficient completion made possible by RSWI, Canada.

contact no of tawa dam is 07572272803

Technical details

It is a canal head project.

Catchment area spreads over approximately 6000 km2.

Full reservoir level (FRL) is 335.397 cubic metres (11,844.4 cu ft).

Head range 7 to 21 m and discharge varying from 25 to 54 Cumecs.

Two turbo generators 6.75 MW rated capacity (20% over load).

Machinery and Equipment

  • Vertical shaft kaplan turbines and auxiliaries
  • 11 kV semi umbrella synchronous generator and auxiliaries
  • 33 kV vacuum circuit breakers.
  • 1 MV 33 kV / 415 V auxiliary transformer
  • Fire protection system
  • 110 DC with battery backup
gollark: Wait, he said it *wasn't* good, oh dear.
gollark: I just implemented bubble sort, since I heard Obama saying it was good.
gollark: But working out things like "how is this styled" and "is this done idiomatically by someone who knows the language well" can require even deeper knowledge than just working out the algorithm.
gollark: If you're writing a thing you probably have a decent idea of the problem domain involved and what's going on, and just have to work out how to express that in code.
gollark: What I'm saying is that reading things and understanding them can be harder than writing them sometimes.

References


    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.