Stateline Wind Farm

The Stateline Wind Farm is a wind farm located on Vansycle Ridge, which receives 16 to 18 mph (26 – 29 km/h) average wind speeds from the Columbia Gorge, on the border between Washington and Oregon in the United States. With 186 turbines currently operating in both states and 279 more approved for construction,[1] it is the largest wind project in the Northwestern United States and will be the largest in the world.[2][3] Costing $300 million to build, it began operation in 2001.[4]

Stateline Wind Farm
Turbines near the Walla Walla River
CountryUnited States
LocationVansycle Ridge, Umatilla County, Oregon, and Walla Walla County, Washington
Coordinates46°02′13.98″N 118°48′23.74″W
StatusOperational
Construction began2001
Commission date2001 (Stateline 1)
2002 (Stateline 2)
2009 (Stateline 3)
Owner(s)Florida Power & Light
Wind farm
Hub height164 and 207 feet (50 and 63 m)
Power generation
Units operational456 x 660 kW
Make and modelVestas Wind Systems
Nameplate capacity222 MW
307 MW (Planned)

The project employs 660 kW capacity Vestas wind turbines, which collectively will produce a maximum electrical output of 306.9 MW. (The current operating capacity is 122.8 MW.)[1] On average, the project is expected to produce 30 to 35 percent of that capacity year-round. Turbines are controlled individually by electronic systems which direct them into the wind and adjust the pitch of the blades to maximize electrical production at any wind speed from 7 to 56 mph. The turbines automatically shut down at wind speeds excess of 56 mph, a feature which allows them to withstand hurricane-force winds.[4]

The wind turbines are grouped in strings of 5 to 37 turbines, each turbine spaced approximately 250 feet (76 m) from the next, generally slightly downwind of the crest of ridges. Each turbine tower is 166 feet (50 m) tall, with blades 76 feet (23 m) wide.[5]

Environmental impact studies determined that the site was not used extensively by birds or other species vulnerable to injury from turbines, and the turbine towers' construction, along with the use of underground power lines, was designed to minimize perching places for birds.[4] The area around the project is used primarily for private farming, including dryland wheat farming and cattle grazing.[3]

The Stateline Wind Project is several miles northwest of the Vansycle Wind Project in Umatilla County, Oregon. Both are owned and operated by Florida Power & Light.

A wind turbine collapsed over the weekend of November 2, 2013 on the Washington side of the Stateline Wind Project.[6]

gollark: The cat ears could also act as radiators or places to mount cameras.
gollark: The D terms are also calculus, you know.
gollark: If people weren't wrong people who are wrong, we could have just used nuclear, but noooo.
gollark: This is an image.
gollark: OpenComputers exists.

See also

References

  1. "Stateline Wind Project". Oregon Department of Energy. Retrieved 2006-05-15.
  2. Brown, Lester R.; Janet Larsen; Bernie Fischlowitz-Roberts. The Earth Policy Reader. W. W. Norton & Company. ISBN 0-393-32406-0.
  3. "Stateline Wind Project". 3Phases Energy Services. Retrieved 2006-05-15.
  4. "Stateline Wind Energy Center". Renewable Northwest Project. Archived from the original on 2006-04-27. Retrieved 2006-05-15.
  5. "Stateline Wind Project". Bonneville Environmental Foundation. Retrieved 2006-05-15.
  6. "Wind turbine collapses in Walla Walla County". The Oregonian. Retrieved 2013-12-10.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.