Sikorsky S-75

The Sikorsky S-75 was a proof-of-concept all-composite helicopter. Sikorsky Aircraft used all-composite materials to replace metal to provide greater strength, lighter weight, lower manufacturing costs, and reduce maintenance costs.

S-75 ACAP
Sikorsky S-75 ACAP all-composite test aircraft
Role Experimental helicopter
Manufacturer Sikorsky Aircraft
First flight July 1984
Primary user United States Army
Number built 2
Developed from Sikorsky S-76

Design and development

The Sikorsky S-75 was developed under the US Army's Advanced Composite Airframe Program (ACAP), the goal of which was the development of an all-composite helicopter fuselage, lighter and less costly to build than predominantly metal airframes in support of the Light Helicopter Experimental (LHX) program.[1][2] In February 1981, contracts were awarded to Sikorsky and Bell Helicopter, with Bell submitting its Model D292. The S-75 flew for the first time in July 1984.

The S-75 mated an entirely new composite airframe with the twin turboshaft engines, transmission, and main and tail rotors of Sikorsky's S-76A civil transport helicopter.[1] The S-75's floors, roof and most exterior surfaces were of more ballistically-resistant Kevlar, while most of the aircraft's basic load-bearing structure was built of graphite or a graphite/epoxy blend. The machine was equipped with specially designed impact-resistant crew and passenger seats and high-strength pneumatic shock absorbers on its fixed tricycle landing gear, in keeping with the Army's requirement that the ACAP aircraft meet or exceed all existing military crashworthiness standards. The aircraft was flown by two pilots, and could carry up to six passengers in the 100-cubic-foot (2.8 m3) rear cabin.

Operational history

The S-75 underwent a 50-hour evaluation by the Army, and was found to have exceeded the weight- and cost-saving criteria set in the original ACAP specification.[1] Sikorsky gained a wealth of data on the fabrication and use of composite airframes through building the S-75, and Sikorsky's later designs incorporated many of its features. Testing of the machine continued through April 1985, after which it was withdrawn from service and placed in long-term storage.

Specifications (S-75)

Data from U.S. Army Aircraft Since 1947,[1]

General characteristics

  • Crew: 2
  • Capacity: up to 6 passengers
  • Length: 43 ft 8 in (13.31 m)
  • Height: 13 ft 2 in (4.01 m)
  • Empty weight: 6,421 lb (2,913 kg)
  • Max takeoff weight: 8,470 lb (3,842 kg)
  • Powerplant: 2 × Allison Model 250-C30S turboshaft engines, 650 shp (480 kW) each for take-off
  • Main rotor diameter: 44 ft (13 m)

Performance

  • Maximum speed: 160 kn (180 mph, 300 km/h)
  • Cruise speed: 138 kn (159 mph, 256 km/h)
  • Range: 346 nmi (398 mi, 641 km)
  • Service ceiling: 13,500 ft (4,100 m)
gollark: I think *cool* zip bombs are smarter than that.
gollark: It hasn't logged anything yet, but it probably will overnight.
gollark: I decided to see exactly what all the random HTTP requests to stuff like `/wp-admin/index.php` and all that are trying to do, so I've made a script to log the headers, POST body and stuff so I can investigate later.
gollark: Did viruses never scan sequentially for whatever reason?
gollark: That's an odd distinction.

See also

Related development

Aircraft of comparable role, configuration and era

Related lists

References

  1. Harding, Stephen (1997). U.S. Army Aircraft Since 1947. Atglen, PA, USA: Schiffer Publishing Ltd. p. 251. LCCN 96-69996.
  2. Historic US Army Helicopters Archived 2009-06-27 at the Wayback Machine
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.