República (São Paulo Metro)

República is a metro station located in the República district, in the center zone of São Paulo. The stations connects the lines 3-Red, operated by Companhia do Metropolitano de São Paulo, and 4-Yellow, operated by ViaQuatro.

República
Entrance of the station
LocationRua do Arouche, 24
República
Brazil
Coordinates23°32′39″S 46°38′34″W
Owned by Government of the State of São Paulo
Operated by  3  Companhia do Metropolitano de São Paulo
 4  ViaQuatro
Platforms 3  Island and side platforms
 4  Side platforms
Construction
Structure typeUnderground
Disabled accessYes
Other information
Station codeREP
History
Opened 3  24 April 1982
 4  15 September 2011
Traffic
Passengers 3  155,000 per business day[1]
Services
Preceding station   São Paulo Metro   Following station
toward Palmeiras-Barra Funda
Line 3
Terminus
Line 4
toward Vila Sônia
Track layout (Line 3)
Track layout (Line 4)
to Luz

Line 3-Red

History

Before the comments that Praça da República would be disfigured by the construction of the East-West Line, Mário Alves de Mello, Municipal Secretary of Metropolitain Transports, stated on November 1974: "There is a possibility to use the underground area, if the new plan needs the line to pass by Praça da República. Besides that, the technological advance and the technical order resources that the Metro Company has, even this occur, there is a possibility to avoid this rumored denaturation of the plaza. An example is what happened to Praça da Sé. After the end of the construction, the region will have the double of the plaza area. It would be foolishness of the administration, even in the benefit of the progress, harm the population and, specially, the residents and children of that area, who enjoy healthy leisure in the Praça da República."[2]

The beginning of the construction of the station, in 1979, occurred with the closing of the street in front of the building of the State Secretariat of Education with blue walls.[3] According to the head of the construction site, the neighbourhood didn't notice that construction had started because, beside the station was deep, the workers were being careful for the sand not bother the residents: "When the trucks leave the site, a worker removes, with shovel and water, the sand that is stuck in the tires.[3] The construction brought us many technical innovations, as the use of rolling bridges with excavator shells - before, ramps were opened to allow trucks to go to the underground where the sand was removed - and the shoring in larger distances than the usual, proportioning cost reduction."[3]

Characteristics

The station of Line 3-Red was opened on 24 April 1982. It is an underground station with two distribution levels and island and side platforms, and structure in apparent concrete. Its constructed area is of 39,050 square metres (420,300 sq ft) and it has capacity of 80,000 passengers per hour during peak hours.[4]

Line 4-Yellow

History

Construction for the connection with Line 4.

The station was already planned to receive, beside the current Line 3-Red, the line then known as Southeast-Southwest,[3] which gave place to the current Line 4-Yellow.

One of the connection stations of the Line 4-Yellow, República was closed for more than a day between 2 and 3 May 2009, so the shield could pass across.[5] The machine was there since January, after excavating the main tunnel since Faria Lima station. The operation of passage from a side to another in the station involved 320 people[5] and caused turmoil,[6] specially because it happened during Virada Cultural, which lasted 24 hours, in which the subway was working uninterrupted. The route between Anhangabaú and Santa Cecília stations, next to the República station, was made in 36 free buses, but that didn't avoid long lines in the platforms and escalators.[6] The line was divided in two tracks, one between stations Palmeiras-Barra Funda and Santa Cecília, and another between Anhangabaú and Corinthians-Itaquera. The prediction was that the paralisation would occur between 1 a.m. on 2 May and midnight on 3 May,[5] but lasted less than 32 hours, being reopened on 8:45 a.m. on 3 May. "We've made everything to minimize the impact, as we already suffered a little bit in the day before with the accumulation of people", said to the Jornal da Tarde the Metro operations manager, Wilmar Fratini.[7]

The deliver of the connection with Line 4 was rescheduled eight times since 2001,[8] and the prediction of the State Government on the beginning of 2011 was that it would be opened in the end of the year, along with Luz station.[9] Later, the Government anticipated the opening to October,[10] then end of September, and finally 15 September.[11] The station began operating from 10 a.m. to 3 p.m. On 23 September, the time was increased to 9 a.m. to 4 p.m.[12] and, since 26 September, from 4:40 a.m. to midnight.[13]

Characteristics

The station of Line 4-Yellow was opened on 15 September 2011. It is located under Praça da República, in the structure of the station constructed before. It has side platforms and a constructed area of 6,190.92 square metres (66,638.5 sq ft).

Because of the different architecture styles, architect Cláudia Chemin, which handled the construction of the space dedicated to Line 4, said that she cared about "doing a nice transition between the two finish styles".[14] For her, this would show the evolution of the materials used in the almost 30 years that separate the construction of the two parts of the station.[14]

Station layout

G Street level Exit/entrance
M1 Mezzanine level 1 Fare control, ticket office, customer service, Bilhete Único/BOM recharge machines, transfer to Line  4 
P1
Platform level 1
Side platform, doors open on the right
Northbound  4  toward Luz
Southbound  4  toward São Paulo-Morumbi →
Side platform, doors open on the right
M2 Mezzanine level 2 Distribution mezzanine, transfer to Line  3 
P2
Platform level 2
Side platform, doors open on the right
Westbound  3  toward Palmeiras-Barra Funda
Island platform, doors open on the left
Eastbound  3  toward Corinthians-Itaquera
Side platform, doors open on the right
gollark: I suppose you could argue that I don't believe it as a "matter of principle" thing, but from what I've heard torture is *not* actually a very effective way to get information.
gollark: For example, there's - on the "fat man" trolley problem question - a question about "do you believe torture is always wrong as a matter of principle" and then "bla bla bla nuclear device torture fat man or not".
gollark: I don't like this philosophyexperiments.com site, it seems to imply things.
gollark: I can make the antimemetics antimemetic such that nobody ever finds out.
gollark: What if I use orbital mind control lasers/antimemetics to make everyone forget about someone THEN kill them?

References

  1. "Entrada de Passageiros por Estação - Média Dias Úteis - Maio/2019" (PDF) (in Portuguese). Metrô de São Paulo. May 2019. Retrieved 10 July 2019.
  2. "Nova linha do Metrô poderá passar pela Praça da República". Diário Popular. 23 November 1974.
  3. Teixeira, Regina Helena (25 June 1979). "O Metrô está parando!" (in Portuguese) (4150). Jornal da Tarde. ISSN 1516-294X.
  4. "Estação República - Linha 3-Vermelha" (in Portuguese). Metrô de São Paulo. Retrieved 10 July 2019.
  5. Gonzales, Daniel (30 April 2009). "Megatatuzão fecha estação República" (in Portuguese). Jornal da Tarde. p. 9A.
  6. Oscar, Naiana; Almeida, Marília (3 May 2009). "No metrô, confusão e filas para sair da estação" (in Portuguese). Jornal da Tarde.
  7. "Depois de tumulto, Estação República volta a operar" (in Portuguese). Jornal da Tarde. 4 May 2009. p. 6A.
  8. Gonzales, Daniel; Vituri, Gabriel (6 January 2011). "Entrega de estações tem 8a data" (in Portuguese) (14745). Jornal da Tarde. p. 4A. ISSN 1516-294X.
  9. Izidoro, Alencar (6 January 2011). "Metrô só abre estações em 6 meses, diz gestão Alckmin" (in Portuguese) (29863). Folha de S. Paulo. p. C6. ISSN 1414-5723.
  10. Dantas, Tiago (16 May 2011). "Entrega de estações do Metrô será antecipada" (in Portuguese). Jornal da Tarde. Archived from the original on 25 May 2011. Retrieved 10 July 2019.
  11. Burgarelli, Rodrigo (31 August 2011). "Estações da Linha 4 serão entregues dia 15" (in Portuguese). Jornal da Tarde. Archived from the original on 1 October 2011. Retrieved 10 July 2019.
  12. "Estações luz e República do Metrô de SP passam a funcionar das 9h às 16h a partir de hoje" (in Portuguese). Uol. 23 September 2011. Retrieved 10 July 2019.
  13. "Estações Luz e República da Linha 4-Amarela vão operar em horário integral de segunda à sábado a partir do dia 26" (in Portuguese). Metrô de São Paulo. 24 September 2011. Archived from the original on 5 December 2011. Retrieved 10 July 2019.
  14. Dantas, Tiago (14 August 2011). "Sé ficará menos cheia com abertura de novas estações" (in Portuguese). Jornal da Tarde. Archived from the original on 1 September 2011. Retrieved 10 July 2019.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.