Nizhny Novgorod Hydroelectric Station

The Nizhny Novgorod Hydroelectric Station or Nizhny Novgorod GES (Russian: Нижегоро́дская ГЭС) is a hydroelectric station on the Volga river. Located near Zavolzhye, Nizhny Novgorod Oblast, it belongs to the Volga-Kama Cascade of dams.

The ship locks of the Nizhny Novgorod Hydroelectric Station

Technical data

Construction started in 1948 and was completed in 1959. Complex consists of concrete spillway dam, 7 earth-fill dams and 3 dikes total 18.6 km long and up to 40 m high, power plant house, and two single-chamber two-lane locks with an intermediate pond. Installed power is 520 MW, average annual production is 1510 GWh. Power house has 8 generator units with Kaplan turbines, each 65 MW at 17 m head. The dam with total waterfront length of 13 km forms Gorky Reservoir.

History

Construction began in 1948. Although it was a medium-size project, e.g. compared to Volga Hydroelectric Station, it was often called an 'innovation testing range'. It also was the USSR's longest dam.

More than 15,000 people came to the construction site. Construction site's infrastructure has been built along with construction of the station. Many industries of Zavolzhye and Gorodets owe their existence to the station's construction. Zavolzhye town was built from scratch. 8,500 houses and 700 state-owned and public buildings were moved to Zavolzhye and Gorodets from villages that were to be flooded.

The first concrete pouring for the dam took place in April 1951. The river current was stopped August 24, 1955. November 2, 1955, when the first turbine was put under load, is an official station's launch date. The last eight turbine was run in December 1956. In 1959 generators' cooling system improvement and reinforcement of turbines were implemented, increasing installed power by 120 MW to 520 MW.

gollark: People's programs really need to *not* just download the master branch of skynet's code. `enchat3` new installs are now broken because the current client up there doesn't work with the skynet server, pending user feedback.
gollark: 1. introspection modules negate many uses for it2. claims mean it's harder to retrieve failing ones, place waypoints, and set safe paths
gollark: Don't worry, all it did was load up stuff from the web, I can rewrite it.
gollark: It seems to require my drone OS, which I don't have because PB2.
gollark: Yep!
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.