Niederamt Nuclear Power Plant

The Niederamt Nuclear Power Plant (in German Kernkraftwerk Niederamt, abbreviated to KKN and not to be confused with the similarly abbreviated Niederaichbach Nuclear Power Plant) was the name for a planned nuclear power plant near the existing Gösgen Nuclear Power Plant in Niederamt in the Canton of Solothurn between Olten and Aarau in Switzerland. The land earmarked for the project would have taken in some of the residential areas of Niedergösgen, Gretzenbach and Däniken.

Niederamt Nuclear Power Plant (KKN)
Official nameKernkraftwerk Niederamt
CountrySwitzerland
LocationNiederamt, Canton of Solothurn between Olten and Aarau
Coordinates47°21′57.4″N 7°58′27.2″E
StatusCancelled
Owner(s)Kernkraftwerk Niederamt AG
Operator(s)Kernkraftwerk Niederamt AG
Power generation
Units planned1 (1,100–1,600 MW)

History

On 9 June 2008 the Kernkraftwerk Niederamt AG, a project company of Atel Holding AG, which now goes by the name of Alpiq Holding, submitted the general licence application to the Swiss Federal Office of Energy.[1]

This is the first stage of the licensing procedure for a new nuclear power plant in Switzerland. The general licence application consists of six documents: the safety report; the environmental impact report; the security report on protection from external hazards; the demonstration of disposal feasibility; the concept for decommissioning, and the report on conformity with the land-use planning.

The general licence is issued by the Swiss Federal Council. Following the natural disasters in Japan, which resulted in the reactor accidents at the Fukushima nuclear power plant, on 14 March 2011 Federal Councillor Doris Leuthard suspended the general licensing procedures for the replacement of existing nuclear power plants.[2] The project was not further pursued; the project company Kernkraftwerk Niederamt AG was formally dissolved in 2017.[3] On January 1, 2018 an amendment (article 12a) to the Swiss Nuclear Energy Act (Kernenergiegesetz) came into effect, prohibiting the issuing of new general licences for nuclear power plants.[4]

Project information

The general licence application did not refer to any specific plant. It was based on a generic nuclear power plant of the third-generation designs available today with light water reactors (pressurised or boiling water reactors) but stopped short of specifying the actual make or manufacturer. The application was based on two output categories, 1100 megawatt and 1600 megawatt.

gollark: Yes, but this is cool-looking.
gollark: Non-empty ME controller room.
gollark: Empty ME controller room.
gollark: Perhaps some combination of wool, skystone and sandstone could work nicely.
gollark: No.

See also

References

  1. Atel submits application for general licence of new nuclear power plant Niederamt in Solothurn, Atel Holding AG, June 10, 2008
  2. Federal Councillor Leuthard suspended the general licensing procedures for the replacement of existing nuclear power plants, DETEC, 14 March 2011 Archived 31 May 2011 at the Wayback Machine
  3. "Schweizerisches Handelsamtsblatt". Eidgenössisches Departement für Wirtschaft, Bildung und Forschung. 7 April 2017. Retrieved 30 April 2019.
  4. "Kernenergiegesetz (KEG) vom 21. März 2003 (Stand am 1. Januar 2018)". Swiss Government. 1 January 2018. Retrieved 30 April 2019. Rahmenbewilligungen für die Erstellung von Kernkraftwerken dürfen nicht erteilt werden.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.