Newquay railway station

Newquay railway station serves the town and seaside resort of Newquay in Cornwall, England. It is the terminus of the Atlantic Coast Line from Par, 302 miles 49 chains (487.01 km) measured from London Paddington. The station is situated in the heart of Newquay, close to the town centre itself and the beaches. The station is managed by Great Western Railway which operates local branch line services to and from Par. In the summer, there also services to and from London with the addition of long-distance CrossCountry services on weekends.

Newquay
Location
PlaceNewquay
Local authorityCornwall
Coordinates50.415°N 5.075°W / 50.415; -5.075
Grid referenceSW815617
Operations
Station codeNQY
Managed byGreat Western Railway
Number of platforms1
DfT categoryF1
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2014/15 100,208
2015/16 95,478
2016/17 102,990
2017/18 108,308
2018/19 103,172
History
Original companyCornwall Minerals Ry
Pre-groupingGreat Western Railway
Post-groupingGreat Western Railway
1876Opened
1905Station rebuilt
Truro line opened
1963Truro line closed
1987Reduced to one platform
National Rail – UK railway stations
  • Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Newquay from Office of Rail and Road statistics. Methodology may vary year on year.

History

The first railway at Newquay was a horse-worked line from the harbour to Hendra Crazey. It was built by Joseph Treffry in stages between 1846 and 1849. The line was extended on 1 June 1874 by the Cornwall Minerals Railway, goods trains now reaching Fowey. A branch line from Tolcarn Junction, just outside Newquay, ran to Gravel Hill Mine near Treamble where there was an iron mine.[1]

Passenger trains were introduced on 20 June 1876.[2] The Great Western Railway operated all the trains from 1 October 1877 and bought out the Cornwall Minerals Railway on 1 July 1896.

The original station had just a single platform and a turntable at the end of the platform was used to release locomotives from incoming trains. The station was rebuilt in 1905 with two platforms serving three tracks. A new line was opened from Shepherds, on the Treamble branch, to Perranporth on 2 January 1905, which allowed a new service to run from Newquay to Truro. The following year through carriages started to be run from London using the direct line from Par.

The main departure platform was lengthened in 1928 and again in 1935; the second platform was lengthened in 1938. These enlargements were to accommodate the longer trains that were now bringing holidaymakers from London and elsewhere. Extensive carriage sidings were laid on the south side of the station to store these trains between services.

The station started to be run down following the closure of the line to Truro on 4 February 1963. The goods yard was closed in 1965; the roof on platforms 2 and 3 was removed in 1964. Platform 3 was shortened in 1966 and its locomotive release line taken out of use on 4 October 1972, by which time four of the carriage sidings had been removed.[3] On 5 October 1987 the signal box was closed, all the remaining signals were dismantled and the rails serving platform 1 were lifted. At the same time the last of the carriage sidings were closed and lifted. The track beside the former platform 3 was kept as a siding until the mid-1990s.

The remaining platform has been resurfaced for its entire length in early 2012, and the former station canopies have been replaced by a new 25 metres (27 yd) by 17 metres (19 yd) wave-shaped canopy above the concourse.[4]

Newquay Harbour

The rail network at the harbour

The original terminus of the Newquay Railway was at the harbour. Horses hauled wagons along a line that wound between houses to reach the top of a 1 in 4½ incline that carried the line down to the harbour. Wagons were lowered on a cable down the incline, which was in a tunnel dug out of the cliff. At the foot the track ran onto the eastern breakwater but a shunt-back and wooden trestle bridge gave access to the stone jetty in the middle of the harbour.[1]

After steam locomotives were introduced by the Cornwall Minerals Railway in 1874, wagons continued to be moved between Newquay railway station and the harbour incline by horses. Traffic handled at the harbour gradually declined and the line was closed in 1925 and lifted in 1926. Part of the route is now a footpath from opposite the station to the cliff tops above the beach.[5]

Trenance Viaduct

Trenance Viaduct

Between Newquay station and Tolcarn Junction the line crosses the Trenance valley on a 154-yard (141m) viaduct. The first structure, opened on 29 January 1849, was a timber structure on stone piers. It was much lighter than the similarly-constructed Cornwall Railway viaducts that were built a few years later, and very different from the imposing granite Treffry Viaduct built by Treffry for his Par tramway.

The piers were raised and new wrought iron girders installed ready for the opening of the line for locomotives in 1874. This was replaced by the present masonry structure on 27 March 1939. It carried two tracks from 20 March 1946; the line to Tolcarn Junction was singled on 23 November 1964 but the second line was retained for shunting purposes until the rationalisation in the 1980s.

Services

A Class 150 with a morning service to Par

Newquay is the terminus of the branch line from Par. The service is irregular with typically one train around every two hours.

As well as the local service, it handles a number of long-distance trains in the summer. These services include Great Western Railway trains from London Paddington and CrossCountry trains from the North of England and the Scottish Lowlands, which do not stop at intermediate stations between Par and Newquay. On Sundays, there are some local trains and a small number of intercity services. As well as the weekend through trains, in peak summer months there is also a Monday-Friday through Great Western Railway intercity service to and from London, but local trains continue on these days too. Traditionally, there was no Sunday service in the winter, even in the 'golden age' between both of the 20th century's world wars, but the line has a service of three trains each way on Sundays from 11 December 2011.

The station has a staffed ticket office which is open from mid May until early September, however it does not have a ticket vending machine so when the ticket office is closed (outside of summer), passengers will have to purchase their tickets on-board the train. Seating is available under the station canopy and on the platform, also in the platform shelter.[6] Refreshments are available on the station concourse.

Preceding station National Rail Following station
Quintrell Downs   Great Western Railway
Atlantic Coast Line
  Terminus
Par   Great Western Railway
London Paddington to Newquay
  Terminus
Par   CrossCountry
The North to Newquay (summer weekends only)
  Terminus
Disused railways
Trewerry and Trerice Halt   Great Western Railway
Truro and Newquay Railway
  Terminus

Community rail

The local trains between Par and Newquay are designated as a community rail service, supported by marketing from the Devon and Cornwall Rail Partnership. The route is promoted as the "Atlantic Coast Line". The other Cornish branch lines are full Community Railways, but only the local service to Newquay is designated in this way, because the presence of intercity and clay trains makes it impossible to designate the line itself.

Three pubs in Newquay take part in the Atlantic Coast Line rail ale trail.

gollark: The particularly annoying part is that the lower-level stuff seems to error in incomprehensible and weird ways.
gollark: These Rust bindings seem to effectively just be direct wrappers for the actual socket APIs, which are unpleasant to use.
gollark: But criticism is fun!
gollark: So they do a lot of work trying to map the register-machine machine code onto that while trying to maintain the illusion of being fast PDP-11s or something.
gollark: Apparently what CPUs need is a dataflow graph so they know exactly how much stuff can be parallelized.

References

  1. Vaughan, John (1991). The Newquay Branch and its Branches. Sparkford: Haynes/Oxford Publishing Company. ISBN 0-86093-470-5.
  2. Bennett, Alan (1988). The Great Western Railway in Mid Cornwall. Southampton: Kingfisher Railway Publications. ISBN 0-946184-53-4.
  3. Cooke, RA (1977). Track Layout Diagrams of the GWR and BR WR, Section 11: East Cornwall. Harwell: RA Cooke.
  4. "Catch the wave: dramatic new canopy covers Newquay station". fabric Architecture. Retrieved 6 June 2012.
  5. Kessler, Peter (16 January 2017). "Railway Walks: Newquay to Newquay Harbour". www.historyfiles.co.uk. Archived from the original on 27 June 2017. Retrieved 12 January 2020.
  6. "National Rail Enquiries - Station facilities for Newquay". www.nationalrail.co.uk. Retrieved 19 April 2018.


This station offers access to the South West Coast Path
Distance to path 50 yards (46 m)
Next station anticlockwiseHayle 35 miles (56 km)
Next station clockwiseBarnstaple 123 miles (198 km)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.