National Route 34 (Costa Rica)
National Primary Route 34, official name Carretera Pacífica Fernández Oreamuno (after Pacífica Fernández Oreamuno), and popularly known as Carretera Costanera Sur (South Coastal Drive), or just Route 34 (Spanish: Ruta Nacional Primaria 34, or Ruta 34), is a National Road Route and scenic route of Costa Rica, located in the Alajuela, Puntarenas provinces that connects Route 27 and Route 2 mostly along the central and south Pacific coast of the country, and is the recommended route over the Pan-American Highway when traveling between the south of the country to the Greater Metropolitan Area.
Ruta Nacional Primaria 34 | ||||
Carretera Costanera Sur, Ruta 34 | ||||
Route information | ||||
Maintained by the MOPT | ||||
Length | 210.68 km (130.91 mi) | |||
Major junctions | ||||
West end | ||||
East end | ||||
Location | ||||
Provinces | Alajuela, Puntarenas | |||
Highway system | ||||
National Road Network of Costa Rica
|
Description
Starting north, an interchange in the town of Pozón, Orotina at Route 27 is the starting point, which continues south towards the beach town of Jacó. Then to the east to Parrita and Quepos, which provides access to Manuel Antonio National Park. Continuing to the east there is the interchange with Route 243 near Dominical beach and then the land area of the Ballena National Marine Park, and finishing at the interchange with Route 2.
In Alajuela province the route covers Orotina canton (Coyolar district).
In Puntarenas province the route covers Osa canton (Puerto Cortés, Palmar, Bahía Ballena districts), Quepos canton (Quepos, Savegre districts), Parrita canton (Parrita district), Garabito canton (Jacó, Tárcoles districts).
History
The project for Route 34 started in 1978, with the proposal to provide better access to the coastal towns, particularly Jacó, Parrita and Quepos, due to the banana production of the area and then oil palm. It would also provide a flatter access to the south of the country than Route 2 through Cerro de la Muerte.
In 1983 the asphalt road was finished between Parrita and Quepos, but it wasn't until April 29th 2010 that the entirety of the road was finished, with the missing segment between Quepos and Dominical paved. [1][2]
Due to the low urbanization in the area, there are a lot of wildlife accidents along this route. [3]
References
- Mora, Emilia (25 June 1995). "Carreteras a paso de tortuga". Retrieved 24 February 2020.
- Mata Blanco, Alonso (29 April 2010). "Gobierno inaugura fase final de Costanera Sur". Retrieved 24 February 2020.
- Guerrero, Angie (1 November 2015). "Costanera Sur: ruta de muerte para animales". Retrieved 23 February 2020.