Montesanto Funicular

The Montesanto Funicular (Italian: Funicolare di Montesanto), is a funicular railway line that forms part of the public transport system for the city of Naples, Italy. Opened in 1891, the Montesanto Funicular carries over 4 million passengers per year.

Montesanto Funicular
Overview
Native nameFunicolare di Montesanto
TypeFunicular
Statusin use
LocaleNaples, Italy
Stations3
Operation
Opened1891 (1891)
Operator(s)
  • 1975–95: ATAN
  • 1995–2001: ANM
  • 2001–13: Metronapoli
  • 2013 to date: ANM
Technical
Line length0.824 km (0.512 mi)
Track gauge1,435 mm (4 ft 8 12 in)
Route map

Morghen
Corso Vittorio Emanuele
Montesanto
(Montesanto station)

Montesanto Funicular connects three stations, Morghen, Corso Vittorio Emanuele (Napoli), and Montesanto. At Morghen, it is a short walk to Piazza Vanvitelli, where there is a connection to Vanvitelli station, on Line 1 of the Naples Metro (Metropolitana di Napoli), and to the Chiaia Funicular.

History

The idea for the construction of the Montesanto funicular was first conceived during the construction of the Cumana Railway which was designed to service Campi Flegrei along the Naples–Torregaveta route. With the residential area expanding around Castel Sant’Elmo, it was decided it would be useful to have a second funicular route connecting the Cumana Railway with Castel Sant'Elmo and the nearby Museo di San Martino. Survey work was carried out by Pariboni & Savoia, and the Neapolitan engineering firm, Officine Nazionali di Savigliano, carried out engineering, electrical and mechanical works as they had done on the Chiaia Funicular. After five years construction, the Montesanto line was opened on 30 May 1891.[1]

Initially the line ran smoothly, but the steep gradients of the Neapolitan lines caused heavy work on the original steam traction engine systems, and they soon began to experience problems. As with the Chiaia line, it was decided to replace the power plants with an all-electrical system, which began operation on 21 June 1901. The new system was more effective, and the Montesanto funicular operated smoothly without any issues for the next several years. The next interruption to service was in 1936, when it was decided to replace the original open carriages with enclosed coaches, which were built by OFM (Officine Ferroviarie Meridionali).[1]

As with the other three lines, the Montesanto line continued to operate successfully for several years, including continuing uninterrupted throughout World War II. As with the other lines, in 1975 Azienda Tranvie Autofilovie Napoletane (ATAN - Neapolitan Light Rail Company) replaced the Società Ferrovie del Vomero (Vomero Train Society) as the operator of the Montesanto funicular. They carried out an audit on the condition of all their assets, and found that the viaduct in the section linking Montesanto and Corso Vittorio Emanuele had been considerably weakened over time. In addition to the general poor state of decline the Montesanto line had experienced, ATAN decided that the Montesanto line required refurbishment. In 1977 they closed the line to carry out essential engineering and modernisation works, entrusting Officine Mecchaniche Agudio to install the same new features as they were doing on the Chiaia funicular. At this time it was decided to install a second intermediate station at Rafaello/Girolamo Santacroce, but as of 2009 construction of this station is still yet to begin. Guaccio Costruzioni carried out engineering surveys, and Mandolino replaced the lines. Nuova Agudio (formerly Officine Mecchaniche Agudio) were given the tender to modernise and replace all of the electrical and mechanical works. Lovisolo constructed new carriages, BMB installed new control and operation systems, and Holtz refurbished the transmission and safety systems.[1] All of the works had been completed by the beginning of 1984, and the refurbished line reopened to the public on 14 April.

ATAN was reorganized as Azienda Napoletana Mobilità (ANM) in 1995, becoming the line's operator. In 2001, operation of all four Naples funiculars was transferred to a different municipal authority, Metronapoli,[2] but it was transferred back to ANM in November 2013.

Further works were carried out in 2005 by Silvio D'Ascia in order to better integrate the line with other urban railway services such as line 2, Cumana and Circumflegrea, but by early 2008 the Montesanto funicular was fully operational again.[1]

Operation

The Montesanto Funicular carries over 4 million passengers annually. It carries an average of 12,500 passengers on workdays, but this is reduced to an average of 4,000 on weekends and holidays.

From the top to bottom the line is 825 metres (2,707 ft) long, and ascends 168 metres (551 ft) in altitude, at an average gradient of 23%. The carriages travel at an average speed of seven metres per second (22.97 ft/s), and the entire route takes four minutes and twenty five seconds. Each train can carry 300 passengers at a time, giving a total capacity of 6,000 passengers per hour in each direction.

Stations

  • Morghen Station
  • Corso Vittorio Emanuele Station
  • Montesanto Station
gollark: I don't think we have good data from then.
gollark: Apparently people are taller now on average than a few hundred years ago due to better nutrition or something.
gollark: Among other things.
gollark: Humans were apparently persistence hunters and would just walk after prey for ages.
gollark: Long distance running is not very necessary to my life and I don't find it fun, so meh.

See also

Notes

  1. "MetroNapoli Web Site - Funicolare di Montesanto". Metro.na.it. Archived from the original on 2011-07-22. Retrieved 2011-01-02.
  2. Webb, Mary (ed.) (2009). Jane's Urban Transport Systems 2009-2010, pp. 190–192. Coulsdon, Surrey (UK): Jane's Information Group. ISBN 978-0-7106-2903-6.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.