Mazegawa Dam

Mazegawa No.2 Dam (馬瀬川第二ダム, Mazegawa dai-ni da-mu) is a dam in the city of Gero in Gifu Prefecture, Japan on the Maze River, part of the Kiso River system. The dam is a concrete gravity dam with a height of 44.5 meters. It was constructed for hydroelectric power generation and its associated power plant has a capacity of 288,000 kilowatts of power. It is managed by the Chubu Electric Power Company.

Mazegawa Dam
Official name馬瀬川第二ダム
LocationGero, Gifu Prefecture, Japan.
Coordinates35°43′53″N 137°08′25″E
Construction began1966
Opening date1976
Dam and spillways
ImpoundsMaze River
Height44.5 meters
Length263.0 meters
Reservoir
Total capacity9,736,000 m³
Catchment area1,049.0 km²
Surface area70 hectares
Power Station
Installed capacity28.8 MW

Notes

    gollark: No, it is probably not due to that.
    gollark: Hmm, what a moderately okay WiFi thing.
    gollark: Plus, LAR breaks 5GHz access points.
    gollark: Intel is supposed to have great drivers, but my laptop's WiFi hardware randomly apifies itself.
    gollark: Wow, it sure does disconnect.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.