Lyon tramway

The Lyon tramway (French: Tramway de Lyon) comprises seven lines, six lines operated by TCL and one by Rhônexpress in the city of Lyon in Auvergne-Rhône-Alpes, France. The original tramway network in Lyon was developed in 1879, and the modern network was built in 2001.[1]

Lyon tramway
Overview
Native nameTramway de Lyon
LocaleLyon, Auvergne-Rhône-Alpes, France
Transit typeLight rail/tram
Number of lines7 (T1-T6 & Rhônexpress)[1][2]
Number of stations88 (T1-T5)[1]
4 (Rhônexpress)[2]
Annual ridership95,000,000 (2017)
Operation
Began operation2001[1]
Operator(s)TCL (T1-T6)
Rhônexpress (Rhônexpress)
Technical
System length66.3 km (41.2 mi) (T1-T5)[1]
22 km (14 mi) (Rhônexpress)[2]
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
System map
Map of Lyon rail public transit network

Lines T1 and T2 opened in 2001; T3 opened at the end of 2006; line T4 opened in 2009; line Rhônexpress (airport connector) opened in 2010; line T5 opened in 2012 and line T6 opened in November 2019. The tramway system complements the Lyon Metro and forms an integral part of the public transportation system (TCL) in Lyon. The network of 6 tram lines (T1-T6) operated by TCL runs 66.3 kilometres (41.2 mi);[1] the single line operated by Rhônexpress runs for 22 kilometres (14 mi)[2] (including approximately 15 kilometres (9.3 mi) shared with the T3 tram line[2]). The network is currently served by 73 Alstom Citadis 302 and 19 Alstom Citadis 402 trams.

Line T1 extends from Debourg to IUT Feyssine via Perrache, Gare Part-Dieu - Vivier Merle and Charpennes. Line T2 runs from Perrache to Saint-Priest Bel-Air via Jean Macé, Grange Blanche and Porte des Alpes. Line T3 goes from Gare Part-Dieu - Villette to Meyzieu Z.I./Meyzieu Les Panettes (in weekdays) via Vaulx-en-Velin La Soie. Line T4 runs from La Doua to Hôpital Feyzin Vénissieux via Charpennes, Gare Part Dieu - Villette, Jet d'Eau and Gare de Vénissieux. Line T5 runs from Grange Blanche to Parc du Chêne or Eurexpo, the expositions days via Bron. Line T6 opened in November 2019 from Debourg to Hôpitaux Est - Pinel via Beauvisage - CISL, Mermoz - Pinel and Desgenettes.

History: the original network (1879 - 1957)

Tram station at Place Carnot at the beginning of the 20th century

The first steam-driven tram line, the number 12, linked Lyon and Vénissieux in 1888. The network was electrified between 1893 and 1899. Extensions to the suburbs were built until 1914. This was the height of the network - high quality service, low price, high frequency and high profitability for shareholders. The inflation between World War I and World War II made the network unprofitable. Beginning in the 1930s, tramways were progressively replaced with trolleybuses and later buses. A modernization plan, including underground sections in the city centre, planned in the 1940s was rapidly abandoned. The last urban tram ran on line 4 in January 1956 and the last suburban tram, the "Train bleu" in Neuville-sur-Saône, was abandoned in June 1957.

Original OTL network

The first tram network was built and operated by the Compagnie des Omnibus et tramways de Lyon (OTL), founded in 1879. It consisted of ten 1,435 mm (4 ft 8 12 in) (standard gauge), horse-drawn lines with a total length of 44 km serving Lyon, Villeurbanne, La Mulatière et Oullins .

In 1894, new electric trams were in service with these lines:

The first line to open was line 5, from Place Bellecour to Vaise along the Saône river, competing with riverboats. Lines 1 and 7 followed the approximate routes of the current metro lines D and A, respectively. The network was gradually extended, by the OTL and by acquisitions of competing operators, between 1894 and 1914.

OTL extensions

Tram from Line 12

La Société du Tramway d'Écully

1,000 mm (3 ft 3 38 in) (Metre gauge) lines to the northwest, acquired by the OTL in 1894.

La Compagnie Lyonnaise des Tramways (CLT)

Metre gauge, steam powered lines on the left bank of the Rhône river. Became the Nouvelle Compagnie Lyonnaise des Tramways (NLT) in 1902, then acquired by the OTL in 1906.

  • 23 : Pont Lafayette - Cimetière de la Guillotière, extended to Monplaisir-la-Plaine. The extension of the line, electrified to Saint-Priest used the number 34 from 1925 à 1935.
  • 24 : Pont Lafayette - Asile de Bron, extended to Bron (Village).
  • 25 : Cordeliers - Montchat, extended to Genas.
  • 26 : Rue Casimier-Périer - Parc de la Tête d'Or
  • 27 : Cordeliers - Vaulx-en-Velin.

La Compagnie du Fourvière Ouest Lyonnais (FOL)

Fourvière and Saint-Just funiculars and trams in the west plateau. Acquired by the OTL in 1910.

La Compagnie du Tramway de Caluire (CTC)

Acquired by the OTL in 1914. Originally metric gauge, converted to standard gauge in 1925.

Tramway de l'Ouest du Dauphiné

This company reach Lyon in 1909.The meter gauge line leading to the east suburb was used on 6 km after being electrified in 1925.

The current network (since 2001)

Following a decline in the 1950s and 1960s, public transit in Lyon was revived in the 1970s with the opening of the Lyon Metro. In 1996 a decision was made to build a new tram network to complement the metro. The first two lines were opened on 2 January 2001: Line T1 from Perrache to IUT-Feyssine via Part-Dieu and Charpennes and Line T2 from Perrache to Porte des Alpes via Jean-Macé and Grange Blanche. Line T2 was extended to Saint-Priest on 27 October 2003 and Line T1 was extended to Montrochet on 15 September 2005, then again to Debourg on 19 February 2014. Line T3 (codenamed LEA) was opened on December 4, 2006 along the former Chemin de Fer de l'Est Lyonnais tracks from Part-Dieu Villette to Meyzieu. Line T4 opened on 20 April 2009, running from Jet d'eau - Mendès France to Hôpital Feyzin - Vénissieux, and was extended to La Doua on 29 August 2013. Line T5 opened on 17 November 2012, running from Grange Blanche to Eurexpo.

Line T1

Line 1

Operates from 04:40 to 00:35, maintained by the Centre de Maintenance de Saint-Priest - Porte des Alpes.

Line T2

Line 2

Operates from 04:55 to 00:34, maintained by the Centre de Maintenance de Saint-Priest - Porte des Alpes.

  • Perrache (connections: SNCF, metro A, tram T1)
  • Centre Berthelot
  • Jean Macé (connections: SNCF, metro B)
  • Garibaldi - Berthelot
  • Route de Vienne
  • Jet d'Eau - Mendès France (connection: tram T4)
  • Villon (connection: tram T4 nearby)
  • Bachut - Mairie du 8ème
  • Jean XXIII - Maryse Bastié
  • Grange Blanche (connections: metro D, tram T5)
  • Ambroise Paré (connection: tram T5)
  • Desgenettes (connections: tram T5, tram T6)
  • Essarts - Iris (connection: tram T5)
  • Boutasse - Camille Rousset (connection: tram T5)
  • Hôtel de Ville - Bron (connection: tram T5)
  • Les Alizés (connection: tram T5)
  • Rebufer
  • Parilly Université - Hippodrome
  • Europe - Université
  • Porte des Alpes
  • Parc Technologique
  • Hauts de Feuilly
  • Salvador Allende
  • Alfred de Vigny
  • Saint-Priest - Hôtel de Ville
  • Esplanade des Arts
  • Jules Ferry
  • Cordière
  • Saint-Priest - Bel Air

Line T3

Line 3

Operates from 04:32 to 00:06, maintained by the Centre de Maintenance de Meyzieu.

Codenamed "LEA" (Ligne de L'Est de l'Agglomération), Line T3 runs along a portion of the former CFEL (Compagnie des chemins de fer de l'Est de Lyon) train line which extended from the Gare de l'Est de Lyon to Saint-Genix-d'Aoste (via Crémieu, Jallieu et Montalieu).[3]

Line T3, which is 14.6 km long, runs largely on ballasted railroad track. It takes 23 minutes to go from Gare Part-Dieu Villette to Meyzieu - ZI, and runs at a maximum speed of 70 km/h (60 km/h at intersections, of which 26 are equipped with crossing gates). 7 km run near residential areas and are equipped with a noise barrier.

Line T4

Operates from 04:39 to 00:45, maintained by the Centre de Maintenance de Saint-Priest - Porte des Alpes.

  • IUT - Feyssine (7.30am to 9am only, as of November 2013)
  • Croix-Luizet (7.30am to 9am only, as of November 2013)
  • INSA - Einstein (7.30am to 9am only, as of November 2013)
  • La Doua - Gaston Berger (connection: tram T1)
  • Université Lyon I (connection: tram T1)
  • Condorcet (connection: tram T1)
  • Le Tonkin (connection: tram T1)
  • Charpennes - Charles Hernu (connections: metro A, metro B, tram T1)
  • Collège Bellecombe (connection: tram T1)
  • Thiers - Lafayette (connection: tram T1)
  • Gare Part-Dieu - Villette (connections: SNCF, tram T3, Rhônexpress) (connections at Gare Part-Dieu - Vivier Merle with walking distance: tram T1, metro B)
  • Archives Départementales
  • Manufacture - Montluc
  • Lycée Colbert
  • Jet d'Eau - Mendès France (connection: tram T2)
  • Lycée Lumière (connection: tram T2 nearby)
  • États-Unis - Musée Tony Garnier
  • Beauvisage - CISL (connection: tram T6)
  • États-Unis - Viviani
  • Joliot Curie - Marcel Sembat
  • La Borelle
  • Gare de Vénissieux (connections: SNCF, metro D)
  • Croizat - Paul Bert
  • Marcel Houël - Hôtel de Ville
  • Lycée Jacques Brel
  • Herriot - Cagne
  • Vénissy
  • Division Leclerc
  • Maurice Thorez
  • Lénine - Corsière
  • Darnaise
  • Hôpital Feyzin Vénissieux

Line T5

Operates from 05:00 to 00:00 between Grange Blanche and Parc du Chêne. Continues from Parc du Chêne to Eurexpo Convention Centre (8am-10pm) on every exhibition day.

  • Grange Blanche (connections: metro D, tram T2)
  • Ambroise Paré (connection: tram T2)
  • Desgenettes (connections: tram T2, tram T6)
  • Essarts - Iris (connection: tram T2)
  • Boutasse - Camille Rousset (connection: tram T2)
  • Hôtel de Ville - Bron (connection: tram T2)
  • Les Alizés (connection: tram T2)
  • De Tassigny - Curial
  • Lycée Jean-Paul Sartre
  • Parc du Chêne (service ends here when no Eurexpo conference)
  • Eurexpo (only on conference days)

A projected extension to Chassieu, which would have added two new stations, Eurexpo 2 and René Cassin, was not approved by the public enquiry and has been postponed (possibly indefinitely) due to lack of support from local councillors.[4] Planning documents do however still include a future study of an extension to line T5 via Chassieu to meet line T3 close to the Groupama Stadium spur.[5] This link is considered to be strategic by the owners of the Eurexpo conference centre, as it could enable direct travel from Eurexpo to Lyon Part-Dieu railway station and to the airport.[6]

Line T6

Operates from 05:00 to 00:56, maintained by the Centre de Maintenance de Saint-Priest - Porte des Alpes.

  • Debourg (connections: metro B, tram T1)
  • Challemel-Lacour - Artillerie
  • Moulin à Vent
  • Petite Guille
  • Beauvisage - Pressensé
  • Beauvisage - CISL (connection: tram T4)
  • Grange Rouge - Santy
  • Mermoz - Californie
  • Mermoz - Moselle
  • Mermoz-Pinel (connection: metro D)
  • Essarts - Laënnec
  • Desgenettes
  • Vinatier
  • Hôpitaux Est - Pinel (connections: tram T2, tram T5)

Line T6 has been builded as an extension of line T1 from its terminus at Debourg to Lyon's eastern hospital complex. A subsequent extension to La Doua, the university campus in Villeurbanne, is also envisaged.[7]

Rhônexpress

A Rhônexpress train, foreground, with a T3 tram.

Rhônexpress is an express line which links Gare Part-Dieu Villette to Saint-Exupéry airport, with intermediate stops at Vaulx-en-Velin La Soie (transfer to Metro Line A) and Meyzieu ZI. It only serves four stations (including airport). The route is served by 6 tram trains, constructed by Swiss builder Stadler Rail. Its route consists of the existing T3 tram line, which is built with passing tracks to allow express service, and an 8.5 kilometres (5.3 mi) new track extension from Meyzieu ZI to the airport. Total length of track is 22 kilometres (14 mi)[2] needing approximately 30 minutes to go from Part-Dieu to the airport.[2] Service runs from morning until last flight arrival, with departures every 15 minutes at peak times.

Work began on October 9, 2008 and was completed August 9, 2010.[8] The Conseil général of the Rhône department franchised the operation rights for 30 years to Rhônexpress, a consortium including Vinci SA (28.2%), Veolia Transport (28.2%), Vossloh Infrastructure Service (4.2%), Cegelec Centre Est (2,8%) and the Caisse des dépôts et consignations.[9] Unlike the Lyon tramways, the Rhônexpress is not run by TCL. Stadler's Tangos are used as rolling stock.

Map

Rolling stock

The TCL fleet is composed (in May 2020) of 73 articulated Alstom Citadis 302 trams built between 2000 and 2009. They have production numbers N°801 - 873. There are 27 articulated Alstom Citadis 402, used on T3 and T4 lines.

Six Stadler Tango trainsets are used for the Rhônexpress service.

gollark: ++delete Protocol χ-39
gollark: +=delete Protocol χ-39
gollark: ++magic sql DELETE FROM deleted_items WHERE id=576
gollark: ++magic sql SELECT * FROM deleted_items WHERE item LIKE '%protocol%'
gollark: Time to undelete that?

See also

References

Inline citations

  1. "Le Tramway sur le réseau TCL" [The Tramway in TCL's network] (in French). TCL - SYTRAL. Archived from the original on 2013-09-27. Retrieved 2013-09-25.
  2. "La société Rhônexpress : les chiffres clefs du service offert" [The Rhônexpress company: Key figures for the service offered] (in French). Rhônexpress. Retrieved 2013-09-25.
  3. Le Chemin de fer de l'Est de Lyon de MM. Domengie, Alquati, Moulin et Roze, Les Éditions du Cabri, 1996
  4. "Le tram à Chassieu : comment perdre 10 ans". chassieunaturellementligne.blogspot.fr (in French).
  5. "Plan de Déplacements Urbains – Agglomération Lyonnaise – 2017-2030" (PDF). www.sytral.fr (in French). Retrieved 15 November 2018.
  6. "La desserte d'Eurexpo freinée par le monopole de Rhônexpress ?". Lyonmag.com (in French). Retrieved 15 November 2018.
  7. "Création tramway T6". www.sytral.fr (in French). Sytral. Retrieved 1 February 2018.
  8. "Archived copy". Archived from the original on 2008-08-21. Retrieved 2009-03-09.CS1 maint: archived copy as title (link)
  9. Ville et transports - magazine, January 17, 2007

Bibliography

  • Lyon du tram au tram / Jean Arrivetz. - La Régordane, 2001. - ISBN 2-906984-37-X
  • Sur les rails du Lyonnais : volume 2 : les réseaux secondaires, tacots, ficelles et métro / José Banaudo. - Les éditions du Cabri, Gérad Tisserand et De Borée 2002. - ISBN 2-84494-134-6
  • 20 Minutes - Le tramway Léa fait ses premiers pas.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.