Kiri Dam

The Kiri Dam is in Shelleng local government area of Adamawa State in the north east of Nigeria, damming the Gongola River. It is a 1.2 km long, 20 m high zoned embankment with an internal clay blanket. The dam was mainly completed in 1982.[1] The reservoir has a capacity of 615 million m³.[2]

Kiri Dam
LocationShelleng, Adamawa State, Nigeria
Coordinates9°40′47″N 12°00′51″E
Dam and spillways
ImpoundsGongola River
Height20 m
Length1.2 km
Reservoir
CreatesKiri lake
Total capacity615 million m³

Savannah Sugar Company

The dam was built to provide irrigation for the Savannah Sugar Company (SSC), a large-scale sugar cane plantation and processing company set up as a joint venture between the Nigerian Federal Government and the Commonwealth Development Corporation (CDC), London. The CDC was managing agent for the project, and the construction contract was awarded to NECCO, a company largely owned by the government.[3]

The Savannah Sugar Company was acquired by Dangote Industries in 2002. In 2009 the company owned 32,000 hectares of land near the dam or which 6,330 were in use and employed about 5,000 people. The company was producing about 50,000 tons of sugar annually, supplying the Nigerian market which consumes 1.1 million tons each year. Over 1,000 hectares of irrigated rice and other crops were being grown using the company's canals.[4]

Impact

29,000 hectares of land were expropriated without compensation, eventually displacing 20,000 people.[5] Resettlement assistance was inadequate.[3] The dam has affected the lower reaches of the Gongola River. Flood peaks dropped from 1,420 m³/second to 1,256 m³/second, while flows in dryer seasons increased from 5.7 m³/second to 21 m³/second. The river downstream from the dam has narrowed and become less winding, with fewer separate channels.[6]

Future

An assessment of the dam in 2004 rated its condition "good".[2] In October 2008 the United States Trade and Development Agency issued a request for proposals on constructing a 35 MW hydro-electric power plant at the dam.[7]

gollark: No it's not.
gollark: Bee ***you*** at bee level 92.
gollark: Onstat says it → I am right → bee you.
gollark: irc.osmarks.net is actually 103.85% up so your complaint is ridiculous.
gollark: OnStat would show just how reliable it is, except it seems to be down.

References

  1. Institution of Civil Engineers, ed. (1990). Geotechnical instrumentation in practice: purpose, performance and interpretation : proceedings of the Conference Geotechnical instrumentation in civil engineering projects. Thomas Telford. p. 404. ISBN 0-7277-1515-1.
  2. Enplan Group (September 2004). "Review of The Public Sector Irrigation in Nigeria" (PDF). Federal Ministry of Water Resources / UN Food & Agricultural Organization. Retrieved 2010-05-21.
  3. Samuel G. Egwu (1998). Structural adjustment, agrarian change, and rural ethnicity in Nigeria. Nordic Africa Institute. pp. 87–89. ISBN 91-7106-426-5.
  4. "Inside Nigeria's only sugar factory". Daily Trust. 21 July 2009. Retrieved 2010-05-21.
  5. Terminski, Bogumil "Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges", Indiana University, 2013, available at: http://dlc.dlib.indiana.edu/dlc/handle/10535/8833?show=full
  6. Tukur A.L., Mubi A.M. (February 2002). "Impact of Kiri dam on the lower reaches of river Gongola, Nigeria". GeoJournal, Volume 56, Number 2. Springer. pp. 93–96(4). Retrieved 2010-05-21.
  7. "Kiri Dam Hydroelectric Power Plant Feasibility Study in Nigeria". United States Trade and Development Agency. Archived from the original on 2013-01-21. Retrieved 2010-05-21.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.