Katihar Junction railway station

Katihar Junction railway station serves Katihar city in Katihar district in the Indian state of Bihar.It is a A Category Railway Station of Katihar Division. The Katihar Junction railway station is connected to most of the major cities in India by the railway network.


Katihar Junction
कटिहार जंक्शन
Express train and Passenger train station
The main entrance of the station.
LocationStation Road, Katihar, Bihar-854105
India
Coordinates25.54869°N 87.56615°E / 25.54869; 87.56615
Elevation35 metres (115 ft)
Owned byIndian Railways
Operated byNortheast Frontier Railway
Line(s)
  • Barauni-Katihar, Saharsa and Purnia sections
  • Barauni-Guwahati line
  • Katihar-Siliguri line
  • Katihar-Teznarayanpur branch line
Platforms8
Tracks14
Construction
Structure typeStandard (on ground station)
ParkingAvailable
Other information
StatusFunctioning
Station codeKIR
Zone(s) North East Frontier Railway
Division(s) Katihar
History
Opened1889
ElectrifiedElectrified(April-2017)
Previous namesEast Indian Railway
Traffic
Passengers1 Lakh per day
Services
Preceding station   Northeast Frontier Railway zone   Following station
TerminusBarauni-Katihar section
Towards Jogbani
Purnia
Barauni
Katihar-Siliguri line
Towards New Jalpaiguri
Barsoi
Barauni
Katihar-Siliguri line
Towards Malda Town
Kumedpur
TerminusBarauni-Katihar section
Towards Manihari
Location
Katihar Junction railway station
Location in Bihar

Katihar lies in between Barauni-Katihar section of Barauni-Guwahati line
Katihar-Siliguri line which serves the city with numerous trains to Guwahati, Kolkata, Delhi, Muzaffarpur, Patna, Gorakhpur, Lucknow and with many other cities. It is ISO certified ISO 14001:2015 for its clean and green environment throughout the station premises.

History

East Indian Railway Company opened the Manihari-Katihar-Kasba section in 1888 and the North Bengal Railway opened the Katihar-Raiganj section the same year. The Barsoi-Kishanganj section opened in 1889. All these lines were 1,000 mm (3 ft 3 38 in) wide metre gauge lines. Darjeeling Himalayan Railway, operating 2 ft (610 mm) narrow gauge lines, extended their operations from Siliguri to Kishanganj in 1915 and to Dalkhola.

Siliguri was connected to Kolkata via the eastern part of Bengal since 1878 (for details see Howrah-New Jalpaiguri Line). However, with the partition of India in 1947, railway services in the region were completely disrupted. In 1949, the narrow gauge Siliguri-Kishanganj section was upgraded to metre gauge. Thus there was a direct metre gauge connection from Manihari to Siliguri via Katihar.[1] The importance of Katihar station grew because of the jute mill in the region.

Development

In the early 1960s, when Farakka Barrage was being constructed, Indian Railways took the initiative to extend 1,676 mm (5 ft 6 in) wide broad gauge rail link from Kolkata.[1]

The 2,240 m (7,350 ft) long Farakka Barrage carries a rail-cum-road bridge across the Ganges. The rail bridge was opened in 1971 thereby linking the Barharwa-Azimganj-Katwa loop to Malda, New Jalpaiguri and other railway stations in North Bengal.[2][3]

Gauge conversion work (from metre gauge to broad gauge) in the Barauni–Katihar section was taken up in 1978-79 and completed in 1982.[4]

The Siliguri-Katihar line was the last surviving metre gauge line in the area. The Aluabari Road-Katihar section already had a broad gauge line running alongside the metre gauge line. The Aluabari Road-Siliguri section needed to be converted. Conversion work was taken up in 2008, train services in the section was suspended and conversion work completed early in 2011.[5][6][7]

Platforms

There are 8 functional platforms at Katihar junction which are interconnected & have multiple Foot over bridges (FOB).

gollark: ```fishecho "Hello, WWOWOWORODLD"```
gollark: ```rustfn main() { println("NOPE! but rust is cool");}```
gollark: All of Go 🤢
gollark: ```goimport "fmt"func main() { fmt.Println("Go is bad and this code is probably wrong")}```
gollark: ```javascriptconsole.log("Hello, Hi!")```

References

  1. "India: the complex history of the junctions at Siliguri and New Jalpaiguri". IRFCA. Retrieved 12 November 2011.
  2. R.P.Saxena. "Indian Railway History timeline". Archived from the original on 14 July 2012. Retrieved 20 November 2011.
  3. Salman, Salman M. A.; Uprety, Kishor (2002). Conflict and cooperation on South Asia's international rivers: a legal perspective. World Bank Publications. pp. 135–136. ISBN 978-0-8213-5352-3. Retrieved 5 July 2011.
  4. Rajendra Saxena. "Details of New line, Gauge conversion & Doubling constructed after independence & in progress on Indian Railways". item No. 18. irse. Archived from the original on 9 July 2012. Retrieved 24 January 2012.
  5. "Delayed but new route helps trains". The Telegraph, 29 September 2011. Retrieved 10 December 2011.
  6. "Railways to partially restore Siliguri-Bagdogra service". Times of India, 16 March 2010. 16 March 2010. Retrieved 10 December 2011.
  7. "IRFCA photo gallery". IRFCA. Retrieved 10 December 2011.
Preceding station   Indian Railway   Following station
TerminusNortheast Frontier Railway zone
Katihar-Siliguri line
Dandkhora
TerminusNortheast Frontier Railway zone
Katihar-Barsoi branch line
Kumedpur
TerminusNortheast Frontier Railway zone
Barauni-Katihar section
Semapur
TerminusNortheast Frontier Railway zone
Katihar-Teznarayanpur branch line
Mansi
TerminusNortheast Frontier Railway zone
Katihar-Jogbani branch line
Dalan
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.