History

The line was originally built by Taipower to facilitate the construction of Mingtan Pumped Storage Hydro Power Plant in Sun Moon Lake. Afterwards, the colony government purchased the route in 1927.

The line was severely damaged in the 1999 Chi-Chi earthquake on 21 September 1999, but was repaired and resumed operations in February 2002.

In March 2010 service on the line was suspended in order for work to be performed on seven railway tunnels between Zhuoshui Station and Checheng Station. The maintenance repaired damage that the tunnels had sustained during the 1999 earthquake and expanded the tunnels' width.[1] The line reopened on July 9, 2011.[2]

Operation

Jiji Line in the center of the map

On Jiji Line, there are twelve runs daily in each direction, with seven eastbound runs starting at Ershui Station and ending at Checheng Station, while two eastbound runs begin at Tianzhong Station, with one eastbound run daily between Yuanlin Station and Checheng Station. There is also one round trip per day between Changhua Station and Checheng Station, however, these depart very early in the morning and very late at night. Westbound there are eight Checheng-Ershui runs, three Checheng-Tianzhong runs, and one run between Shuili Station and Changhua Station. The headway between each run is about two hours. Due to the line being single tracked, only two trains can travel the full length at a time, with the two meeting at Zhuoshui Station. Historically, only the TRA's DRC1000 trains could operate on the line due to the width of the line's tunnels. Following the renovations from 2010 to 2011, the Jiji Line became navigable to other types of trains.

Stations and fares

Stations

NameChineseTaiwaneseHakkaTransfers and NotesLocation
Ershui二水Jī-chúiNgi-súi West Coast line ErshuiChanghua
County
Yuanquan源泉Goân-choâⁿNgièn-chhièn
Zhuoshui濁水Lô-chúiChhu̍k-súi MingjianNantou
County
Longquan龍泉Lêng-choâⁿLiùng-chhièn Jiji
Jiji集集Chi̍p-chi̍pSi̍p-si̍p
Shuili水里Chúi-líSúi-lî Shuili
Checheng車埕Chhia-tiâⁿChhâ-chhâng

Fares

A one-way ticket fare, from Ershui to Checheng, is NT$44 by mileage for adults. And, an unlimited-rides pass fare is NT$80, for used in one day. The Jiji Line ticket and one-day round-trip pass is available for purchase at all the following TRA stations: Zhunan, Miaoli, Fengyuan, Taichung, Changhua, Yuanlin, Tianzhong, Ershui, Dajia, Shalu, Douliu, Dounan, and Chiayi.

Using the MRT calculation, the fare will be NT$55 in the future, and will support Easycard.

gollark: Did you read what I said?
gollark: They *are* better as in more tradable, because of rarity and use in lineages.
gollark: TJ09 can only have indirect effects via messing with rarity.
gollark: Stuff is valued according to desirability which is based in rarity.
gollark: Er, I just have to note something here.

See also

  • 1999 Jiji earthquake aka 921 earthquake

References

  1. Shan, Shelley (2010-01-25). "TRA's historic Jiji Line to close in March for repairs - Taipei Times". The Taipei Times. Retrieved 2013-12-20.
  2. Shan, Shelley (2011-07-05). "Jiji line to reopen on Saturday, says railway operator - Taipei Times". The Taipei Times. Retrieved 2013-12-20.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.